Northern Indiana (New Carlisle)
Market boundary: facilities within 50 km of the metro center (editorial definition).
Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned.
Construction pipeline by expected completion
MW from phases with a projected completion date
Power reality
Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.
- Announced3.04 GW
- Interconnection requests—
- Contracted / approved—
- Under construction1.22 GW
- Operational1.09 GW
838 MW announced at 2 sites has no grid, construction or operating record yet.
Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.
- Microsoft LaPorte538 MW / 0
- Google Michigan City300 MW / 0
Interconnection queues
Active requests to connect to the grid (MISO, PJM). Requests are applications, not commitments — most never get built.
Largest operators & owners
Online + pipeline MW at linked facilities
- Amazon Web Services1.09 GW + 0 MW · 2 sites
- Google— · 1 sites
- Microsoft— · 1 sites
Largest customers & end users
Tenants and workload owners, where sourced
- Anthropic1.09 GW + 0 MW · 1 sites
Utility exposure
Most likely retail utility by location (approximate)
- Indiana Michigan Power (AEP)1.09 GW + 0 MW · 2 sites
- NIPSCO— · 2 sites
- Midwest Energy Cooperative— · 1 sites
Grid operators (ISO / RTO)
By facility location
- PJM1.09 GW + 0 MW · 3 sites
- MISO— · 2 sites
Largest facilities
By online + pipeline MW
| Facility | Status | Online | Pipeline |
|---|---|---|---|
| Anthropic-Amazon New Carlisle | Operating | 1.09 GW | — |
Facilities by status
- Operating3
- Unknown2
Campuses & sites (4)
Campus pages list their buildings
- Anthropic-Amazon New Carlisle1.09 GW online
- Google Michigan Citycampus
- Microsoft LaPortecampus
- Unnamed data centerbuilding