DC
/

Meta Rosemount

OperatingAI campusCampusRosemount, Dakota County, Minnesota
70% profile completeness
31 claims from 10 sources
Current facility power
241 MW[1]
Likelyestimated
Planned capacity
Not yet sourced
Building footprint
602,200 sq ft[5]
Likelyderived
Buildings (planned)
Likelyderived
Capital cost / investment
$6.7B[1]
Likelyestimated
First operational
Jun 19, 2026[1]
Likelyderived

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Energized — operating
High confidence
Project verification
Verified operating
Operation documented by satellite imagery.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Northern States Power CO - Minnesota · MISO
Substation: On-site substation

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
241 MW[1]
Estimated from buildings observed operational
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionMay 30, 2024
    Model estimate · Satellite imagery
    • May 30, 2024 · Reported status: under construction[1]
    • May 30, 2024 · Construction start[1]
    • May 30, 2024 · Land is cleared.[1]
  3. EnergizationJun 19, 2026
    Satellite imagery
    • Jun 19, 2026 · Buildings 1 and 2 are estimated to be operational.[1]
  4. OperationalJun 19, 2026
    Satellite imagery
    • Jun 19, 2026 · Buildings 1 and 2 are estimated to be operational.[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Model estimate, Satellite imagery.

Grid path

  1. facility
    Meta Rosemount
  2. substation
    On-site substation[1][5]
    Satellite imageryLikely
    2 substation outlines traced inside the campus on satellite imagery; OSM maps Unnamed substation 0.48 km away
  3. transmission
    Rosemount-Empire Transmission Line (115 kV)[5]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.5 km away). Not confirmed as the supply path.
  4. utility
    Northern States Power CO - Minnesota[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    MISO[4]
    Service territoryLikely
    Balancing authority: MISO
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

Mapped outline
Coordinates
44.73429, -93.06322
Address
1772-2396 145th St, Rosemount, MN 55068, USA[1]Likely
County
Dakota County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Owner
Meta[1]Confirmed
End user
Meta[1]Confirmed
Utility

Location falls inside this utility's retail service territory.

Power (all fields)

Current facility power
241 MW[1]Likelyestimated

Estimated total facility power (IT plus cooling and overhead) at the latest observed milestone.

Current IT capacity
178 MW[1]Likelyestimated

Estimated IT load currently online, based on buildings observed operational.

Estimated annual consumption
1,478 GWh/yr[3]Speculativeestimated

241 MW × 8,760 h × 70% utilization.

Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
MISO[4]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
MISO[2]Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Unnamed substation (115 kV)[5]Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.5 km[5]Likelyderived
Highest-voltage line nearby
115 kV[5]Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
10.34¢/kWh[7]Confirmed

Minnesota statewide average, July 2026.

State avg. commercial price
13.49¢/kWh[7]Confirmed

Minnesota statewide average, July 2026.

Generation within 50 km
5.12 GW[8]Confirmedderived

83 EIA-reported plants within 50 km.

Generation queued in county
892 MW[6]Confirmedderived

7 active generation interconnection requests in Dakota County: Storage 735 MW, Solar 150 MW, Hydro 7 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
Rosemount-Empire Transmission Line · Great River EnergyTransmission line0.5 km115 kV[5]
115 kV lineTransmission line1.34 km115 kV[5]
Inver Hills · Northern States Power Co - MinnesotaPower plant (Natural Gas)5.5 km286 MW[8]
Black Dog · Northern States Power Co - MinnesotaPower plant (Natural Gas)17 km491 MW[8]
High Bridge · Northern States Power Co - MinnesotaPower plant (Natural Gas)22.2 km530 MW[8]
Cannon Falls Energy Center · Invenergy Services LLCPower plant (Natural Gas)24.9 km316 MW[8]
Blue Lake · Northern States Power Co - MinnesotaPower plant (Natural Gas)29.6 km447 MW[8]
Riverside (Mn) · Northern States Power Co - MinnesotaPower plant (Natural Gas)35.9 km454 MW[8]
Prairie Island · Northern States Power Co - MinnesotaPower plant (Nuclear)36.2 km1.04 GW[8]
Allen S King · Northern States Power Co - MinnesotaPower plant (Coal)39.8 km511 MW[8]
Unnamed substationSubstation0.48 km115 kV[5]
Largest queued generation in this countyFuelQueue statusMWSource
J2716 at HAMPTON 345 KVMISO J2716StorageIn study · proposed 2027-04300 MW[6]
J4065 at Nininger 115 kVMISO J4065StorageIn study · proposed 2030-06200 MW[6]
J2027 at CHUB LAKE - 304JB21/22 - HAMPTON - 8S50/51 345.0kVMISO J2027SolarIn study · proposed 2024-10150 MW[6]
J3543 at Chub Lake 115 kVMISO J3543StorageIn study · proposed 2028-06135 MW[6]
J3172 at GRE-NININGR7 115 kVMISO J3172StorageIn study · proposed 2026-06100 MW[6]
J1826 at Cannon Falls Transmission 69 kVMISO J1826HydroIA signed · proposed 2022-034 MW[6]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    May 30, 2024[1]
  5. First operational
    Jun 19, 2026[1]
  6. Expected completion
    —
Buildings (planned)
2[1]Likelyderived

Count of building outlines traced on satellite imagery.

Buildings operational
2[1]Likelyestimated
PhaseStatusAdded MWCompleted / expectedSource
Buildings 1–2operational241 MWJun 19, 2026[1]

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Capital cost / investment
$6.7B[1]Likelyestimated

Modeled total capital cost (2025 USD) of capacity currently operational, incl. compute hardware.

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Building footprint
602,200 sq ft[5]Likelyderived

Sum of 2 building outlines mapped in OpenStreetMap within this campus.

Floor area
Not yet sourced

Compute

Chip types
B200[1]Confirmed
Compute (H100-equivalents)
215,700[1]Likelyestimated

What changed (last 3 years)

Follow this facility (RSS)
  • Buildings operational
    0May 30, 2024[1]→2Jun 19, 2026[1]
  • Status
    Under constructionMay 30, 2024[1]→OperatingJun 19, 2026[1]

Timeline

Construction start: May 30, 2024[1]
First operational: Jun 19, 2026[1]
  1. May 30, 2024[1]

    Land is cleared.

  2. Mar 21, 2026[1]

    Both buildings and their cooling infrastructure look complete, but the site probably is likely still under commissioning, and few cars are parked to the right of Building 1. We give another 3 months before it's operational.

  3. Jun 19, 2026241 MW facility power· 2 buildings operational[1]

    Buildings 1 and 2 are estimated to be operational.

All claims (provenance audit)

31
FieldValueSourceConfidenceAs ofStatus
NameMeta Rosemount[1] Likely2026-06-19Shown
StatusUnder construction[1] derivedLikely2024-05-30Superseded / alternative
StatusUnder construction[1] derivedLikely2026-03-21Superseded / alternative
StatusOperating[1] derivedLikely2026-06-19Shown
Facility typeAI campus[1] derivedLikely2026-06-19Shown
Address1772-2396 145th St, Rosemount, MN 55068, USA[1] Likely2026-06-19Shown
OwnerMetaOwner: Meta[1] Confirmed2026-06-19Shown
End usersMetaUsers: Meta[1] Confirmed2026-06-19Shown
UtilityNorthern States Power CO - Minnesotaterritory 13781: NORTHERN STATES POWER CO - MINNESOTA (INVESTOR OWNED, XCEL ENER[2] derivedLikely2022Shown
Current facility power241 MW[1] estimatedLikely2026-06-19Shown
Current IT capacity178 MW[1] estimatedLikely2026-06-19Shown
Estimated annual consumption1,478 GWh/yr[3] estimatedSpeculative2026-09-29Shown
ISO / RTOMISOMIDCONTINENT INDEPENDENT TRANSMISSION SYSTEM OPERATOR, INC..[4] derivedLikely—Shown
Balancing authorityMISO[2] derivedLikely—Shown
Nearest mapped substationUnnamed substation (115 kV)way/1456059511[5] derivedLikely2026-09-28Shown
Distance to substation0.5 km[5] derivedLikely2026-09-28Shown
Highest-voltage line nearby115 kV[5] derivedLikely2026-09-28Shown
Generation queued in county892 MW[6] derivedConfirmed2026-09-27Shown
State avg. industrial price10.34¢/kWh[7] Confirmed2026-07Shown
State avg. commercial price13.49¢/kWh[7] Confirmed2026-07Shown
Generation within 50 km5.12 GW[8] derivedConfirmed202502Shown
Buildings (planned)2[1] derivedLikely2026-06-19Shown
Buildings operational2[1] estimatedLikely2026-06-19Shown
Buildings operational0[1] estimatedLikely2024-05-30Superseded / alternative
Buildings operational0[1] estimatedLikely2026-03-21Superseded / alternative
Building footprint602,200 sq ftway/1454573842 way/1454573843[5] derivedLikely2026-09-27Shown
Capital cost / investment$6.7B[1] estimatedLikely2026-06-19Shown
Compute (H100-equivalents)215,700[1] estimatedLikely2026-06-19Shown
Chip typesB200[1] Confirmed2026-06-19Shown
Construction startMay 30, 2024[1] derivedLikely2026-06-19Shown
First operationalJun 19, 2026[1] derivedLikely2026-06-19Shown