DC
/

Minnesota

Facilities
16
2 campuses
Power online
241 MW
1 sites reporting
Under construction
0 MW
planned MW at active sites
Planned
—
0 planned sites (MW not disclosed)
AI campuses
1
241 MW online · 0 MW pipeline
AI compute
0.22M
H100-equivalents (est.)
Capital (reported + est.)
$6.7B

Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned. Average industrial electricity price: 10.34¢/kWh (EIA).

AI data center capacity over time

Facility power at satellite-tracked AI campuses (Epoch AI timelines), quarterly

0 MW75 MW150 MW225 MW300 MW202720282029
Observed (satellite-tracked) Projected

Construction pipeline by expected completion

MW from phases with a projected completion date

No dated pipeline yet.

Power reality

Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.

  • Announced1 GW
  • Interconnection requests—
  • Contracted / approved—
  • Under construction—
  • Operational241 MW

1 GW announced at 1 site has no grid, construction or operating record yet.

Pending MW by time to power

Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.

Largest gaps: announced vs documented
Verified operating: 1Announced only: 1Unverified: 14

Interconnection queues

Active requests to connect to the grid (MISO, SPP). Requests are applications, not commitments — most never get built.

Generation seeking interconnection21.97 GW · 129 requests
Solar 9.26 GWStorage 6.2 GWWind 4.09 GWUnknown 1.66 GWHybrid 660 MW

Markets

Click through to drill down

Online Under construction + planned
NameFacilitiesOnlinePipeline
Minneapolis–St. Paul13241 MW—

Largest operators & owners

Online + pipeline MW at linked facilities

Online Under construction + planned

Largest customers & end users

Tenants and workload owners, where sourced

Online Under construction + planned
  • Meta241 MW + 0 MW · 1 sites

Utility exposure

Most likely retail utility by location (approximate)

Online Under construction + planned

Grid operators (ISO / RTO)

By facility location

Online Under construction + planned
  • MISO241 MW + 0 MW · 16 sites

Largest facilities

By online + pipeline MW

FacilityStatusOnlinePipeline
Meta RosemountOperating241 MW—

Facilities by status

  • Operating15
  • Unknown1