Data centers in Dakota County, Minnesota
Datacenter Source tracks 1 data center in Dakota County, Minnesota. Facilities that disclose power add up to 241 MW online and 0 MW in the pipeline — floors, since 100% report a figure. 2 interconnection-queue requests were filed in the county in the last two years.
Follow
Get changes to Dakota County, Minnesota
Or subscribe in a feed reader: RSS / Atom
Facilities
- Meta Rosemount AI campus · RosemountOperating241 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Interconnection-queue requests filed here (last two years)
Requests to connect generation or large loads, as the ISO/RTO publishes them. Filing is an application, not a commitment to build.
- Sep 22, 2025 · MISO J4065 Storage generation — J4065 at Nininger 115 kV200 MW · Active · DPP-2025 · Phase 1 ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.source
- Jul 14, 2025 · MISO J2027 Solar generation — J2027 at CHUB LAKE - 304JB21/22 - HAMPTON - 8S50/51 345.0kV150 MW · Active · DPP-2021 · Phase 2 · Not Started ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.source
Local impact
Water, on-site generation and air permits, incentives, regulatory events and large-load tariffs, where a source documents them. Counts are of sourced records, not of the state's totals.
0 M gal/day modeled at 1 site EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Not yet collected
Not yet collected for this state's utilities.
Not yet collected
Recent changes
- Jun 19, 2026 · Meta Rosemount EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Buildings operational: 0 → 2
- Jun 19, 2026 · Meta Rosemount EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Status: Under construction → Operating
- Jun 19, 2026 · Meta Rosemount EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. New capacity online: Buildings 1 and 2 are estimated to be operational.
- May 30, 2024 · Meta Rosemount EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Construction started: Land is cleared.