DC
/

Nebraska

Facilities
29
4 campuses
Power online
843 MW
4 sites reporting
Under construction
359 MW
planned MW at active sites
Planned
—
0 planned sites (MW not disclosed)
AI campuses
4
843 MW online · 359 MW pipeline
AI compute
0.59M
H100-equivalents (est.)
Capital (reported + est.)
$26.3B

Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned. Average industrial electricity price: 10.00¢/kWh (EIA).

AI data center capacity over time

Facility power at satellite-tracked AI campuses (Epoch AI timelines), quarterly

0 MW500 MW1 GW1.5 GW2 GW2023202420252026202720282029
Observed (satellite-tracked) Projected

Construction pipeline by expected completion

MW from phases with a projected completion date

2027
2028

Power reality

Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.

  • Announced813 MW
  • Interconnection requests—
  • Contracted / approved—
  • Under construction359 MW
  • Operational843 MW
Pending MW by time to power

Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.

Largest gaps: announced vs documented

No large gaps in this scope.

Verified operating: 4Unverified: 25

Interconnection queues

Active requests to connect to the grid (SPP). Requests are applications, not commitments — most never get built.

Generation seeking interconnection13.63 GW · 70 requests
Gas 3.44 GWSolar 2.86 GWOther 2.45 GWStorage 2.3 GWWind 1.68 GWSolar + storage 905 MW

Markets

Click through to drill down

Online Under construction + planned
NameFacilitiesOnlinePipeline
Council Bluffs / Omaha27673 MW190 MW

Largest operators & owners

Online + pipeline MW at linked facilities

Online Under construction + planned

Largest customers & end users

Tenants and workload owners, where sourced

Online Under construction + planned
  • Meta105 MW + 0 MW · 1 sites

Utility exposure

Most likely retail utility by location (approximate)

Online Under construction + planned

Grid operators (ISO / RTO)

By facility location

Online Under construction + planned
  • SPP843 MW + 359 MW · 29 sites

Largest facilities

By online + pipeline MW

FacilityStatusOnlinePipeline
Google OmahaOperating + expanding284 MW190 MW
Google LincolnOperating + expanding170 MW169 MW
Google PapillionOperating284 MW—
Meta SarpyOperating105 MW—

Facilities by status

  • Operating27
  • Operating + expanding2