Microsoft SAT 80
Part of Microsoft — San Antonio, TX campus
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityMicrosoft SAT 80
- →substationNot identifiedUnknownUnverifiedNo substation mapped within 3 km and none named in filings.
- →transmissionNot identifiedUnknownUnverifiedNo transmission line mapped within 2 km.
- →utilityMedina Electric Coop, INC[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 29.42919, -98.87666
- Address
- County
- Medina County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Most likely retail provider among 4 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Karnes Electric Coop INC, Bandera Electric Coop, INC, AEP Texas Central Company.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- State avg. industrial price
Texas statewide average, July 2026.
- State avg. commercial price
Texas statewide average, July 2026.
- Generation within 50 km
12 EIA-reported plants within 50 km.
- Generation queued in county
7 active generation interconnection requests in Medina County: Storage 745 MW, Solar 211 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Ranchtown · Engie North America | Power plant (Batteries) | 25 km | 10 MW | [6] |
| Commerce Ess · City of San Antonio - (TX) | Power plant (Batteries) | 25.1 km | 10 MW | [6] |
| Leon Creek · City of San Antonio - (TX) | Power plant (Natural Gas) | 30.3 km | 184 MW | [6] |
| Sune Cps3 LLC · SunE CPS3 LLC | Power plant (Solar) | 30.6 km | 11 MW | [6] |
| Oci Alamo Solar I Hybrid · OCI Energy LLC | Power plant (Solar) | 45.4 km | 41 MW | [6] |
| Blue Wing Solar Energy Generation · Duke Energy Renewables Services | Power plant (Solar) | 48.2 km | 14 MW | [6] |
| Sune Cps2 LLC · SunE CPS2 LLC | Power plant (Solar) | 48.9 km | 10 MW | [6] |
| Sune Cps1 LLC · SunE CPS1 LLC | Power plant (Solar) | 48.9 km | 10 MW | [6] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Devine Mary BESSERCOT 28INR0392 · Devine Mary BESS | Storage | In study · proposed 2028-11 | 201 MW | [4] |
| Chacon CreekERCOT 27INR0206 · Cattlemen BESS LLC | Storage | In study · proposed 2027-10 | 189 MW | [4] |
| Ranger BESSERCOT 29INR0152 · Nova Clean Energy LLC | Storage | In study · proposed 2029-04 | 155 MW | [4] |
| Dunlay SolarERCOT 27INR0203 · Medina PV, LLC | Solar | In study · proposed 2030-12 | 151 MW | [4] |
| Hondo Arroyo StorageERCOT 27INR0437 · Hondo Creek Solar, LLC | Storage | In study · proposed 2028-07 | 101 MW | [4] |
| Adam Bryant BESSERCOT 25INR0610 · Adam Bryant BESS LLC | Storage | In study · proposed 2027-12 | 100 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
Other buildings on this campus
2- Microsoft SAT 81Operating · 244,800 sq ft footprint
- Microsoft SAT 82Operating · 244,800 sq ft footprint
All claims (provenance audit)
13| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Microsoft SAT 80way/1533392812 name=Microsoft SAT 80 | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Facility type | Hyperscale | [1] derived | Unverified | 2026-09-27 | Shown |
| Address | 18844 FM1957, San Antonio, TX 78009 | [1] | Likely | 2026-09-27 | Shown |
| Operator | Microsoftoperator=Microsoft | [1] | Likely | 2026-09-27 | Shown |
| Utility | Medina Electric Coop, INCterritory 12268: MEDINA ELECTRIC COOP, INC (COOPERATIVE, MEDINA ELECTRIC COOP, I | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | ERCOTELECTRIC RELIABILITY COUNCIL OF TEXAS, INC. | [3] derived | Likely | — | Shown |
| Balancing authority | ERCO | [2] derived | Likely | — | Shown |
| Generation queued in county | 956 MW | [4] derived | Confirmed | 2026-09-01 | Shown |
| State avg. industrial price | 7.07¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 8.47¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 306 MW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 244,800 sq ft | [1] derived | Likely | 2026-09-27 | Shown |