Rowan Temple

UnknownUnclassifiedCampusTemple, Bell County, Texas
10% profile completeness
9 claims from 6 sources
Current facility power
Not yet sourced
Planned capacity
300 MW[1]
Likely
Floor area
Not yet sourced
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
H2 2028 – H2 2032
Low confidencewindow, not a prediction
Project verification
Announced only
Only announcements or press coverage found.
Current stage
Announced
Furthest stage with documented evidence
Utility · ISO
Oncor Electric Delivery · ERCOT
Substation: Not identified

Power reality

Announced
300 MW[1]
Reported by Edison Electric Institute
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
  • ⚠ No grid, construction or operating record yet backs the 300 MW announced.
  • ⚠ No public interconnection record for this load — ERCOT does not publish large-load requests.
  • ⚠ No recorded land acquisition found.
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.
How the time-to-power window was estimated
Evidence used
  • Current stage: Announced (furthest stage with documented evidence)[1]
  • No public grid record: No interconnection request or utility contract found; adds uncertainty to the upper bound.
  • Required: 300 MW
Assumptions
  • From “Announced”, large loads have typically taken 2–5 more years to first power (editorial range; see Methodology).
  • The window is a range of plausible outcomes under these assumptions, not a forecast. It moves as new filings, queue updates or imagery arrive.
Window: H2 2028 – H2 2032

Project verification

Development
  1. AnnouncedSep 11, 2026
    Utility filing / announcement
    • Sep 11, 2026 · Planned capacity reported: 300 MW[1]
  2. Land acquired
  3. Planning / zoning
  4. Permitting
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under construction
  3. Energization
  4. Operational

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Utility filing / announcement.

Grid path

  1. facility
    Rowan Temple
  2. substation
    Not identified
    UnknownUnverified
    No substation mapped within 3 km and none named in filings.
  3. transmission
    Not identified
    UnknownUnverified
    No transmission line mapped within 2 km.
  4. utility
    Oncor Electric Delivery[1]
    DocumentedConfirmed
    Named in a source
  5. ISO / RTO
    ERCOT[2]
    Service territoryLikely
    Balancing authority: ERCO
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

County-level (approximate)

Location is approximate (county-level (approximate)); the marker does not identify the exact site.

Coordinates
31.03737, -97.47867
County
Bell County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Developer

“Rowan Digital Infrastructure / Data Center Temple, TX”

Utility

“Rowan Digital Infrastructure / Data Center Temple, TX” Listed by EEI under this member utility.

No tenants or end users identified in our sources yet.

Power (all fields)

Planned capacity
300 MW[1]Likely

“Rowan Digital Infrastructure / Data Center Temple, TX ▪ 300 MW data center project.”

Current facility power
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
ERCOT[2]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
ERCO[3]Likelyderived

Control area of the containing utility territory.

State avg. industrial price
7.07¢/kWh[5]Confirmed

Texas statewide average, July 2026.

State avg. commercial price
8.47¢/kWh[5]Confirmed

Texas statewide average, July 2026.

Generation within 50 km
2.99 GW[6]Confirmedderived

16 EIA-reported plants within 50 km.

Generation queued in county
2.34 GW[4]Confirmedderived

9 active generation interconnection requests in Bell County: Storage 1,439 MW, Gas 637 MW, Solar 264 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
Temple Power Station · Temple Generation Holdings LLCPower plant (Natural Gas)15.5 km1.58 GW[6]
Five Wells Solar Center - Hybrid · Five Wells Solar Center, LLCPower plant (Solar)21.4 km579 MW[6]
Big Elm Solar · Big Elm Solar, LLCPower plant (Solar)27.5 km200 MW[6]
Orion III Solar Project · Ben Milam Solar 3 LLCPower plant (Solar)34.8 km250 MW[6]
Phantom Solar · Phantom Solar, LLCPower plant (Solar)35.9 km15 MW[6]
Bt Jungmann · BT Jungmann, LLCPower plant (Solar)42.8 km40 MW[6]
Orion I Solar Project · Ben Milam Solar 1 LLCPower plant (Solar)45.7 km200 MW[6]
North Fork Tx · Engie North AmericaPower plant (Batteries)49.6 km100 MW[6]
Largest queued generation in this countyFuelQueue statusMWSource
Riviera GasERCOT 29INR0206 · BKV-BPP Power GasIn study · proposed 2030-06637 MW[4]
Lavita BESSERCOT 26INR0465 · Lavita BESS, LLCStorageIn study · proposed 2028-07606 MW[4]
Bell County Morgan StorageERCOT 26INR0615 · DM-BCTRM, LLCStorageIn study · proposed 2029-12256 MW[4]
Bell County Leifester StorageERCOT 26INR0614 · DM-BCRCML, LLCStorageIn study · proposed 2029-09205 MW[4]
Goldeneye BESSERCOT 25INR0100 · Black Mountain Energy Storage IIStorageIA signed · proposed 2028-05202 MW[4]
Cosper SolarERCOT 25INR0281 · Gransolar Texas Twenty LLCSolarIA signed · proposed 2027-11148 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —
Planned capacity
300 MW[1]Likely

“Rowan Digital Infrastructure / Data Center Temple, TX ▪ 300 MW data center project.”

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

9
FieldValueSourceConfidenceAs ofStatus
DeveloperRowan Digital Infrastructure[1] Confirmed2026-09-11Shown
UtilityOncor Electric Delivery[1] Confirmed2026-09-11Shown
Planned capacity300 MW[1] Likely2026-09-11Shown
ISO / RTOERCOTELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.[2] derivedLikely—Shown
Balancing authorityERCO[3] derivedLikely—Shown
Generation queued in county2.34 GW[4] derivedConfirmed2026-09-01Shown
State avg. industrial price7.07¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price8.47¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km2.99 GW[6] derivedConfirmed202502Shown