Austin & Central Texas

Market boundary: facilities within 75 km of the metro center (editorial definition).

Facilities
19
3 campuses
Power online
198 MW
1 sites reporting
Under construction
1.23 GW
planned MW at active sites
Planned
—
0 planned sites (MW not disclosed)
AI campuses
2
198 MW online · 1.23 GW pipeline
AI compute
0.17M
H100-equivalents (est.)
Capital (reported + est.)
$5.8B

Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned.

Construction pipeline by expected completion

MW from phases with a projected completion date

2026
2028

Power reality

Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.

  • Announced1.73 GW
  • Interconnection requests—
  • Contracted / approved—
  • Under construction33 MW
  • Operational198 MW

1.5 GW announced at 2 sites has no grid, construction or operating record yet.

Pending MW by time to power

Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.

Largest gaps: announced vs documented
Verified operating: 1Under construction: 1Announced only: 1Unverified: 16

Interconnection queues

Active requests to connect to the grid (ERCOT). Requests are applications, not commitments — most never get built.

Generation seeking interconnection10.6 GW · 39 requests
Storage 4.78 GWGas 3.22 GWSolar 2.6 GW

Largest operators & owners

Online + pipeline MW at linked facilities

Online Under construction + planned

Largest customers & end users

Tenants and workload owners, where sourced

Online Under construction + planned
  • OpenAI0 MW + 1.2 GW · 1 sites
  • Meta198 MW + 33 MW · 1 sites

Utility exposure

Most likely retail utility by location (approximate)

Online Under construction + planned

Grid operators (ISO / RTO)

By facility location

Online Under construction + planned
  • ERCOT198 MW + 1.23 GW · 19 sites

Largest facilities

By online + pipeline MW

FacilityStatusOnlinePipeline
OpenAI Stargate MilamUnder construction—1.2 GW
Meta TempleOperating + expanding198 MW33 MW

Facilities by status

  • Operating16
  • Operating + expanding1
  • Under construction1
  • Unknown1

Campuses & sites (17)

Campus pages list their buildings