DC
/

SkyBox Lancaster

UnknownUnclassifiedCampusLancaster, Dallas County, Texas
10% profile completeness
12 claims from 7 sources
Current facility power
Not yet sourced
Planned capacity
300 MW[1]
Likely
Floor area
Not yet sourced
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
H2 2028 – H2 2032
Low confidencewindow, not a prediction
Project verification
Announced only
Only announcements or press coverage found.
Current stage
Announced
Furthest stage with documented evidence
Utility · ISO
Oncor Electric Delivery · ERCOT
Substation: Wall Street Substation (138 kV) (nearest, unverified)

Power reality

Announced
300 MW[1]
Reported by Edison Electric Institute
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
  • ⚠ No grid, construction or operating record yet backs the 300 MW announced.
  • ⚠ No public interconnection record for this load — ERCOT does not publish large-load requests.
  • ⚠ No recorded land acquisition found.
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.
How the time-to-power window was estimated
Evidence used
  • Current stage: Announced (furthest stage with documented evidence)[1]
  • No public grid record: No interconnection request or utility contract found; adds uncertainty to the upper bound.
  • Required: 300 MW
Assumptions
  • From “Announced”, large loads have typically taken 2–5 more years to first power (editorial range; see Methodology).
  • The window is a range of plausible outcomes under these assumptions, not a forecast. It moves as new filings, queue updates or imagery arrive.
Window: H2 2028 – H2 2032

Project verification

Development
  1. AnnouncedSep 11, 2026
    Utility filing / announcement
    • Sep 11, 2026 · Planned capacity reported: 300 MW[1]
  2. Land acquired
  3. Planning / zoning
  4. Permitting
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under construction
  3. Energization
  4. Operational

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Utility filing / announcement.

Grid path

  1. facility
    SkyBox Lancaster
  2. substation
    Wall Street Substation (138 kV)[4]
    Proximity onlyUnverified
    Nearest mapped substation, 0.83 km away. Proximity does not establish that it serves the site.
  3. transmission
    138 kV line[4]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.8 km away). Not confirmed as the supply path.
  4. utility
    Oncor Electric Delivery[1]
    DocumentedConfirmed
    Named in a source
  5. ISO / RTO
    ERCOT[2]
    Service territoryLikely
    Balancing authority: ERCO
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

County-level (approximate)

Location is approximate (county-level (approximate)); the marker does not identify the exact site.

Coordinates
32.76664, -96.77783
County
Dallas County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Developer

“SkyBox / Data Center Lancaster, TX”

Utility

“SkyBox / Data Center Lancaster, TX” Listed by EEI under this member utility.

No tenants or end users identified in our sources yet.

Power (all fields)

Planned capacity
300 MW[1]Likely

“SkyBox / Data Center Lancaster, TX ▪ 300 MW data center campus”

Current facility power
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
ERCOT[2]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
ERCO[3]Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Wall Street Substation (138 kV)[4]Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.8 km[4]Likelyderived
Highest-voltage line nearby
138 kV[4]Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
7.07¢/kWh[6]Confirmed

Texas statewide average, July 2026.

State avg. commercial price
8.47¢/kWh[6]Confirmed

Texas statewide average, July 2026.

Generation within 50 km
7.24 GW[7]Confirmedderived

45 EIA-reported plants within 50 km.

Generation queued in county
867 MW[5]Confirmedderived

9 active generation interconnection requests in Dallas County: Storage 817 MW, Other 50 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
138 kV lineTransmission line0.8 km138 kV[4]
Mountain Creek · Mountain Creek Power, LLCPower plant (Natural Gas)15.5 km808 MW[7]
Lake Hubbard · Luminant Generation Company LLCPower plant (Natural Gas)23 km915 MW[7]
Forney Energy Center · LaFrontera Holdings LLCPower plant (Natural Gas)26.8 km1.77 GW[7]
Handley · Constellation Power, IncPower plant (Natural Gas)41.5 km1.25 GW[7]
Lily Solar Hybrid · Lily Solar, LLCPower plant (Solar)41.7 km196 MW[7]
Ray Olinger · City of Garland - (TX)Power plant (Natural Gas)45.2 km395 MW[7]
Midlothian Energy Facility · Midlothian Energy LLCPower plant (Natural Gas)45.5 km1.62 GW[7]
Wigeon Whistle Battery Storage Plant · Wigeon Whistle BESS LLCPower plant (Batteries)49 km120 MW[7]
Wall Street SubstationSubstation0.83 km138 kV[4]
Industrial Boulevard Substation · OncorSubstation1.35 km138 kV[4]
Unnamed substationSubstation1.42 km138 kV[4]
Unnamed substationSubstation2.12 km—[4]
Unnamed substationSubstation2.55 km138 kV[4]
Largest queued generation in this countyFuelQueue statusMWSource
watermelon 1 energy storageERCOT 27INR0457 · Tempus power management LLCStorageIn study · proposed 2029-03102 MW[5]
watermelon 2 energy storageERCOT 27INR0458 · Tempus power management LLCStorageIn study · proposed 2029-03102 MW[5]
watermelon 3 energy storageERCOT 27INR0459 · Tempus power management LLCStorageIn study · proposed 2029-03102 MW[5]
watermelon 4 energy storageERCOT 27INR0460 · Tempus power management LLCStorageIn study · proposed 2029-03102 MW[5]
watermelon 5 energy storageERCOT 28INR0255 · Tempus power management LLCStorageIn study · proposed 2029-03102 MW[5]
watermelon 6 energy storageERCOT 28INR0256 · Tempus power management LLCStorageIn study · proposed 2029-03102 MW[5]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —
Planned capacity
300 MW[1]Likely

“SkyBox / Data Center Lancaster, TX ▪ 300 MW data center campus”

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

12
FieldValueSourceConfidenceAs ofStatus
DeveloperSkyBox Datacenters[1] Confirmed2026-09-11Shown
UtilityOncor Electric Delivery[1] Confirmed2026-09-11Shown
Planned capacity300 MW[1] Likely2026-09-11Shown
ISO / RTOERCOTELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.[2] derivedLikely—Shown
Balancing authorityERCO[3] derivedLikely—Shown
Nearest mapped substationWall Street Substation (138 kV)way/340631521[4] derivedLikely2026-09-28Shown
Distance to substation0.8 km[4] derivedLikely2026-09-28Shown
Highest-voltage line nearby138 kV[4] derivedLikely2026-09-28Shown
Generation queued in county867 MW[5] derivedConfirmed2026-09-01Shown
State avg. industrial price7.07¢/kWh[6] Confirmed2026-07Shown
State avg. commercial price8.47¢/kWh[6] Confirmed2026-07Shown
Generation within 50 km7.24 GW[7] derivedConfirmed202502Shown