DC
/

SkyBox Plano

UnknownUnclassifiedCampusPlano, Collin County, Texas
10% profile completeness
9 claims from 6 sources
Current facility power
Not yet sourced
Planned capacity
100 MW[1]
Likely
Floor area
Not yet sourced
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
H2 2028 – H2 2032
Low confidencewindow, not a prediction
Project verification
Announced only
Only announcements or press coverage found.
Current stage
Announced
Furthest stage with documented evidence
Utility · ISO
Oncor Electric Delivery · ERCOT
Substation: Not identified

Power reality

Announced
100 MW[1]
Reported by Edison Electric Institute
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
  • ⚠ No grid, construction or operating record yet backs the 100 MW announced.
  • ⚠ No public interconnection record for this load — ERCOT does not publish large-load requests.
  • ⚠ No recorded land acquisition found.
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.
How the time-to-power window was estimated
Evidence used
  • Current stage: Announced (furthest stage with documented evidence)[1]
  • No public grid record: No interconnection request or utility contract found; adds uncertainty to the upper bound.
  • Required: 100 MW
Assumptions
  • From “Announced”, large loads have typically taken 2–5 more years to first power (editorial range; see Methodology).
  • The window is a range of plausible outcomes under these assumptions, not a forecast. It moves as new filings, queue updates or imagery arrive.
Window: H2 2028 – H2 2032

Project verification

Development
  1. AnnouncedSep 11, 2026
    Utility filing / announcement
    • Sep 11, 2026 · Planned capacity reported: 100 MW[1]
  2. Land acquired
  3. Planning / zoning
  4. Permitting
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under construction
  3. Energization
  4. Operational

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Utility filing / announcement.

Grid path

  1. facility
    SkyBox Plano
  2. substation
    Not identified
    UnknownUnverified
    No substation mapped within 3 km and none named in filings.
  3. transmission
    Not identified
    UnknownUnverified
    No transmission line mapped within 2 km.
  4. utility
    Oncor Electric Delivery[1]
    DocumentedConfirmed
    Named in a source
  5. ISO / RTO
    ERCOT[2]
    Service territoryLikely
    Balancing authority: ERCO
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

County-level (approximate)

Location is approximate (county-level (approximate)); the marker does not identify the exact site.

Coordinates
33.18827, -96.57262
County
Collin County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Developer

“SkyBox / Data Center Plano, TX”

Utility

“SkyBox / Data Center Plano, TX” Listed by EEI under this member utility.

No tenants or end users identified in our sources yet.

Power (all fields)

Planned capacity
100 MW[1]Likely

“SkyBox / Data Center Plano, TX ▪ 100 MW data center project”

Current facility power
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
ERCOT[2]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
ERCO[3]Likelyderived

Control area of the containing utility territory.

State avg. industrial price
7.07¢/kWh[5]Confirmed

Texas statewide average, July 2026.

State avg. commercial price
8.47¢/kWh[5]Confirmed

Texas statewide average, July 2026.

Generation within 50 km
4.22 GW[6]Confirmedderived

33 EIA-reported plants within 50 km.

Generation queued in county
975 MW[4]Confirmedderived

5 active generation interconnection requests in Collin County: Storage 975 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
Ray Olinger · City of Garland - (TX)Power plant (Natural Gas)17.4 km395 MW[6]
Wigeon Whistle Battery Storage Plant · Wigeon Whistle BESS LLCPower plant (Batteries)26.7 km120 MW[6]
Lake Hubbard · Luminant Generation Company LLCPower plant (Natural Gas)39.3 km915 MW[6]
Powerlane Plant · City of Greenville - (TX)Power plant (Petroleum)41.6 km107 MW[6]
Rayburn Energy Station LLC · Rayburn Energy Station LLCPower plant (Natural Gas)44 km685 MW[6]
Forney Energy Center · LaFrontera Holdings LLCPower plant (Natural Gas)48.6 km1.77 GW[6]
State Farm Insur Support Center Central · State Farm Mutual Auto Ins CoPower plant (Petroleum)49 km11 MW[6]
Spencer · City of Garland - (TX)Power plant (Natural Gas)49.7 km122 MW[6]
Largest queued generation in this countyFuelQueue statusMWSource
Drake BESSERCOT 25INR0101 · Mallard Energy Storage LLCStorageIA signed · proposed 2027-01257 MW[4]
Little Ridge StorageERCOT 25INR0238 · TX BESS B LLCStorageIn study · proposed 2027-09252 MW[4]
Purple Sage BESS 1ERCOT 25INR0391 · Purple Sage, LLCStorageIA signed · proposed 2028-02156 MW[4]
Purple Sage BESS 2ERCOT 25INR0392 · Purple Sage, LLCStorageIA signed · proposed 2028-02156 MW[4]
Bufflehead BESSERCOT 24INR0274 · Boxcar Energy Storage, LLCStorageIA signed · proposed 2027-02154 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —
Planned capacity
100 MW[1]Likely

“SkyBox / Data Center Plano, TX ▪ 100 MW data center project”

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

9
FieldValueSourceConfidenceAs ofStatus
DeveloperSkyBox Datacenters[1] Confirmed2026-09-11Shown
UtilityOncor Electric Delivery[1] Confirmed2026-09-11Shown
Planned capacity100 MW[1] Likely2026-09-11Shown
ISO / RTOERCOTELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.[2] derivedLikely—Shown
Balancing authorityERCO[3] derivedLikely—Shown
Generation queued in county975 MW[4] derivedConfirmed2026-09-01Shown
State avg. industrial price7.07¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price8.47¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km4.22 GW[6] derivedConfirmed202502Shown