STACK NVA06
STACK NVA06 is an under construction colocation in Virginia. Operated or owned by STACK Infrastructure. Current power: 24 MW (estimated). Verification: under construction. 6 cited sources.
Part of STACK Infrastructure — Loudoun County, VA campus
Follow
Get changes to STACK NVA06
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “STACK NVA06.” /facilities/stack-nva06-loudoun-county-va-2. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_stack_nva06_loudoun_county_va_2_2026,
title = {{STACK NVA06}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/stack-nva06-loudoun-county-va-2}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
- ⚠ No public interconnection record for this load.
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Permit / site plan, Community map.
Grid path
- →facilitySTACK NVA06
- →substationUnnamed substation (230 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 1.78 km away. Proximity does not establish that it serves the site.
- →transmission230 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (1.86 km away). Not confirmed as the supply path.
- utilityNot identifiedUnknownUnverified
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling
Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source
On-site generation & air permits
Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events
Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source
Utility & rates
Not yet collected: we haven't found a source for a large-load tariff or commission docket for the serving utility. Know one? Add a source
Location & imagery
Mapped outline- Coordinates
- 39.07991, -77.56484
- County
- Loudoun County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of record
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Property owner of record
- Operator
No tenants or end users identified in our sources yet.
Power (all fields)
- Current IT capacity
- 24 MW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likely
- Estimated annual consumption
- 191 GWh/yr[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Speculativeestimated
31 MW (IT 24 MW × 1.3) × 8,760 h × 70% utilization.
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- Nearest mapped substation
- Unnamed substation (230 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- 1.8 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
- Highest-voltage line nearby
- 230 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
- 10.07¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Virginia statewide average, July 2026.
- State avg. commercial price
- 11.68¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Virginia statewide average, July 2026.
- Generation within 50 km
- 1.39 GW[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
33 EIA-reported plants within 50 km.
- Generation queued in county
- 1.04 GW[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived
11 active generation interconnection requests in Loudoun County: Storage 940 MW, Solar 100 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 230 kV line | Transmission line | 1.86 km | 230 kV | [1] |
| Potomac Energy Center, LLC · Potomac Energy Center LLC | Power plant (Natural Gas) | 3 km | 766 MW | [6] |
| Montgomery County Resource Recovery · Covanta Montgomery, Inc. | Power plant (Biomass) | 16.4 km | 54 MW | [6] |
| Dickerson Power · Dickerson Power, LLC | Power plant (Natural Gas) | 16.8 km | 299 MW | [6] |
| Blake Solar Plant · Horus West Virginia 1, LLC | Power plant (Solar) | 30.9 km | 80 MW | [6] |
| Fort Detrick Solar PV · Montevue Lane Solar, LLC | Power plant (Solar) | 41.2 km | 22 MW | [6] |
| Nih Cogeneration Facility · National Institutes of Health | Power plant (Natural Gas) | 41.6 km | 28 MW | [6] |
| Energix Nokesville, LLC · Energix Nokesville, LLC | Power plant (Solar) | 45.4 km | 20 MW | [6] |
| Covanta Alexandria/Arlington Energy · Covanta Alexandria/Arlington | Power plant (Biomass) | 48.8 km | 29 MW | [6] |
| Unnamed substation | Substation | 1.78 km | 230 kV | [1] |
| Altair Switching Station | Substation | 1.86 km | 230 kV | [1] |
| Cochran Mill Delivery Point | Substation | 2.72 km | 230 kV | [1] |
| Goose Creek Substation · Dominion Energy | Substation | 2.91 km | 500 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Loudoun 230 kVPJM AG2-285 | Storage | In study · proposed 2023-12 | 150 MW | [4] |
| Beaumeade 230 kVPJM AG2-287 | Storage | In study · proposed 2023-12 | 150 MW | [4] |
| New Road StoragePJM AE2-019 | Storage | IA signed · proposed 2026-12 | 120 MW | [4] |
| Dulles SolarPJM AF1-147 | Solar | IA signed · proposed 2023-12 | 100 MW | [4] |
| Roundtable 230 kVPJM AG2-307 | Storage | In study · proposed 2023-12 | 100 MW | [4] |
| Shelhorn 230 kVPJM AG2-323 | Storage | In study · proposed 2023-12 | 100 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
- Permit / case numbers
- BLDC-2024-011260, BLDC-2024-032400[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
Real estate
None sourced yet
None sourced yet
None sourced yet
| Parcel | Record owner | Acres | Zoning / use | Building sq ft | Source |
|---|---|---|---|---|---|
| 234371847000 Loudoun County, VA | SI NVA06B LLC Project: Compass Creek | 33.18 | TOWNS · Data Center | 621,036 built/under construction | [2] |
- Site area
- 33.2 acres[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
Legal acreage of the parcel(s).
- Zoning
- TOWNS[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
- Land use
- Data Center[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
- Annual property tax
- Not yet sourced
Size
- Floor area
- 621,000 sq ft[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
Building area on the county's data-center parcel inventory (from building permits).
- Building footprint
- 119,200 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Computed from the mapped OSM building outline.
- Parcel / land records
- MCPI 234371847000 (Loudoun County)[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
What changed (last 3 years)
Follow this facility (RSS)- StatusUnder constructionOct 5, 2026[2]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→OperatingOct 12, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Timeline
No dated events sourced yet.
Other buildings on this campus
1- STACK NVA06Under construction · 201,000 sq ft footprint
All claims (provenance audit)
24| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | STACK NVA06way/1566629297 name=STACK NVA06 | [1] | Likely | 2026-10-12 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-10-12 | Superseded / alternative |
| Status | Under construction | [2] derived | Confirmed | 2026-10-12 | Shown |
| Facility type | Colocation | [1] derived | Unverified | 2026-10-12 | Shown |
| Website | https://www.stackinfra.com/locations/americas/northern-virginia/nva06/ | [1] | Likely | 2026-10-12 | Shown |
| Property owner of record | Si Nva06b LLCMCPI 234371847000: SI NVA06B LLC | [2] | Confirmed | 2026-10-12 | Shown |
| Operator | STACK Infrastructureoperator=Stack Infrastructure | [1] | Likely | 2026-10-12 | Shown |
| Current IT capacity | 24 MWit_power=24 MW | [1] | Likely | 2026-10-12 | Shown |
| Estimated annual consumption | 191 GWh/yr | [3] estimated | Speculative | 2026-10-12 | Shown |
| Nearest mapped substation | Unnamed substation (230 kV)way/1292897238 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 1.8 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 230 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 1.04 GW | [4] derived | Confirmed | 2026-10-12 | Shown |
| State avg. industrial price | 10.07¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 11.68¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 1.39 GW | [6] derived | Confirmed | 202502 | Shown |
| Permit / case numbers | BLDC-2024-011260 | [2] | Confirmed | 2026-10-12 | Shown |
| Permit / case numbers | BLDC-2024-032400 | [2] | Confirmed | 2026-10-12 | Shown |
| Floor area | 621,000 sq ft | [2] | Confirmed | 2026-10-12 | Shown |
| Building footprint | 119,200 sq ft | [1] derived | Likely | 2026-10-12 | Shown |
| Site area | 33.2 acres | [2] | Confirmed | 2026-10-12 | Shown |
| Parcel / land records | MCPI 234371847000 (Loudoun County) | [2] | Confirmed | 2026-10-12 | Shown |
| Zoning | TOWNS | [2] | Confirmed | 2026-10-12 | Shown |
| Land use | Data Center | [2] | Confirmed | 2026-10-12 | Shown |