OperatingEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.ColocationBuildingClark County, Nevada

Switch Las Vegas 16 is an operating colocation in Nevada. Operated or owned by Switch. Power capacity has not been disclosed or collected yet. Verification: unverified. 6 cited sources.

Part of Switch — Clark County, NV campus

20% profile completeness
15 claims from 6 sources
Last verified against sources: Oct 12, 2026
Newest dated evidence: Oct 12, 2026
Follow

Get changes to Switch Las Vegas 16

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “Switch Las Vegas 16.” /facilities/switch-las-vegas-16-clark-county-nv. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_switch_las_vegas_16_clark_county_nv_2026,
  title = {{Switch Las Vegas 16}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/facilities/switch-las-vegas-16-clark-county-nv}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Building footprint
62,800 sq ft[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Southern California Edison · None (non-RTO region)
Substation: Unnamed substation (138 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalOct 12, 2026
    Community map
    • Oct 12, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    Switch Las Vegas 16 (NAP16)
  2. substation
    Unnamed substation (138 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 1.09 km away. Proximity does not establish that it serves the site.
  3. transmission
    230 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.58 km away). Not confirmed as the supply path.
  4. utility
    Southern California Edison[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    None (non-RTO region)[3]
    Service territoryLikely
    Balancing authority: CISO
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

LOCAL IMPACT

Water · generation · incentives · regulation · rates

Water & cooling

Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source

On-site generation & air permits

Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source

Incentives

Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source

Regulatory events

Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source

Utility & rates

Not yet collected: we haven't found a source for a large-load tariff or commission docket for Southern California Edison. Know one? Add a source

Location & imagery

Mapped outline
Coordinates
36.06592, -115.21860
County
Clark County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
    Switch[1]Likely
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Operator
Switch[1]Likely
Utility

Most likely retail provider among 4 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Nevada Power CO, Wapa-- Western Area Power Administration, Colorado River Comm of Nevada.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
None (non-RTO region)[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Outside all ISO/RTO footprints; balancing authority shown separately.

Balancing authority
CISO[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Unnamed substation (138 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
1.1 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage line nearby
230 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
10.04¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Nevada statewide average, July 2026.

State avg. commercial price
9.72¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Nevada statewide average, July 2026.

Generation within 50 km
10.51 GW[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived

51 EIA-reported plants within 50 km.

Generation queued in county
5.4 GW[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived

16 active generation interconnection requests in Clark County: Solar + storage 4,470 MW, Storage 927 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
138 kV lineTransmission line0.57 km138 kV[1]
230 kV lineTransmission line0.58 km230 kV[1]
Clark (Nve) · Nevada Power CoPower plant (Natural Gas)15.3 km1.14 GW[6]
Desert Star Energy Center · Desert Star Energy Center SDG&EPower plant (Natural Gas)36.8 km450 MW[6]
Hoover Dam (Az) · U S Bureau of ReclamationPower plant (Hydroelectric)43.6 km1.04 GW[6]
Hoover Dam (Nv) · U S Bureau of ReclamationPower plant (Hydroelectric)43.6 km1.04 GW[6]
Chuck Lenzie Generating Station · Nevada Power CoPower plant (Natural Gas)44.2 km1.24 GW[6]
Silverhawk · Nevada Power CoPower plant (Natural Gas)44.5 km1.06 GW[6]
Apex Generating Station · Apex Generating StationPower plant (Natural Gas)45.3 km524 MW[6]
Harry Allen · Nevada Power CoPower plant (Natural Gas)49.5 km654 MW[6]
Unnamed substationSubstation1.09 km138 kV[1]
Unnamed substationSubstation1.26 km138 kV[1]
Unnamed substationSubstation2.67 km138 kV[1]
Unnamed substationSubstation2.79 km230 kV[1]
Unnamed substationSubstation2.89 km138 kV[1]
Largest queued generation in this countyFuelQueue statusMWSource
ARIDA 2 SOLAR FARMCAISO 1647Solar + storageIn study · proposed 2029-05700 MW[4]
MOSEYCAISO 2148Solar + storageIA signed · proposed 2029-06500 MW[4]
ARIDA 3 SOLAR FARMCAISO 1795Solar + storageIn study · proposed 2030-07450 MW[4]
BONANZA PEAK SOLAR FARMCAISO 1655Solar + storageIA signed · proposed 2027-12400 MW[4]
PURPLE SAGE ENERGY CENTERCAISO 1800Solar + storageIA signed · proposed 2028-05400 MW[4]
ARIDA SOLAR FARMCAISO 1522Solar + storageIn study · proposed 2027-09370 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Building footprint
62,800 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived

Computed from the mapped OSM building outline.

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

Other buildings on this campus

7

All claims (provenance audit)

15
FieldValueSourceConfidenceAs ofStatus
NameSwitch Las Vegas 16way/1558897570 name=Switch Las Vegas 16[1] Likely2026-10-12Shown
StatusOperating[1] derivedUnverified2026-10-12Shown
Facility typeColocation[1] derivedUnverified2026-10-12Shown
OperatorSwitchoperator=Switch[1] Likely2026-10-12Shown
UtilitySouthern California Edisonterritory 17609: SOUTHERN CALIFORNIA EDISON CO (INVESTOR OWNED, SOUTHERN CALIFOR[2] derivedUnverified2022Shown
ISO / RTONone (non-RTO region)[3] derivedLikely—Shown
Balancing authorityCISO[2] derivedLikely—Shown
Nearest mapped substationUnnamed substation (138 kV)way/700964338[1] derivedLikely2026-09-28Shown
Distance to substation1.1 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby230 kV[1] derivedLikely2026-09-28Shown
Generation queued in county5.4 GW[4] derivedConfirmed2026-10-12Shown
State avg. industrial price10.04¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price9.72¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km10.51 GW[6] derivedConfirmed202502Shown
Building footprint62,800 sq ft[1] derivedLikely2026-10-12Shown