Switch Las Vegas 16
Switch Las Vegas 16 is an operating colocation in Nevada. Operated or owned by Switch. Power capacity has not been disclosed or collected yet. Verification: unverified. 6 cited sources.
Part of Switch — Clark County, NV campus
Follow
Get changes to Switch Las Vegas 16
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “Switch Las Vegas 16.” /facilities/switch-las-vegas-16-clark-county-nv. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_switch_las_vegas_16_clark_county_nv_2026,
title = {{Switch Las Vegas 16}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/switch-las-vegas-16-clark-county-nv}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilitySwitch Las Vegas 16 (NAP16)
- →substationUnnamed substation (138 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 1.09 km away. Proximity does not establish that it serves the site.
- →transmission230 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.58 km away). Not confirmed as the supply path.
- →utilitySouthern California Edison[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling
Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source
On-site generation & air permits
Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events
Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source
Utility & rates
Not yet collected: we haven't found a source for a large-load tariff or commission docket for Southern California Edison. Know one? Add a source
Location & imagery
Mapped outline- Coordinates
- 36.06592, -115.21860
- County
- Clark County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Most likely retail provider among 4 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Nevada Power CO, Wapa-- Western Area Power Administration, Colorado River Comm of Nevada.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
- None (non-RTO region)[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Outside all ISO/RTO footprints; balancing authority shown separately.
- Balancing authority
- CISO[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Control area of the containing utility territory.
- Nearest mapped substation
- Unnamed substation (138 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- 1.1 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
- Highest-voltage line nearby
- 230 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
- 10.04¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Nevada statewide average, July 2026.
- State avg. commercial price
- 9.72¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Nevada statewide average, July 2026.
- Generation within 50 km
- 10.51 GW[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
51 EIA-reported plants within 50 km.
- Generation queued in county
- 5.4 GW[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived
16 active generation interconnection requests in Clark County: Solar + storage 4,470 MW, Storage 927 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 138 kV line | Transmission line | 0.57 km | 138 kV | [1] |
| 230 kV line | Transmission line | 0.58 km | 230 kV | [1] |
| Clark (Nve) · Nevada Power Co | Power plant (Natural Gas) | 15.3 km | 1.14 GW | [6] |
| Desert Star Energy Center · Desert Star Energy Center SDG&E | Power plant (Natural Gas) | 36.8 km | 450 MW | [6] |
| Hoover Dam (Az) · U S Bureau of Reclamation | Power plant (Hydroelectric) | 43.6 km | 1.04 GW | [6] |
| Hoover Dam (Nv) · U S Bureau of Reclamation | Power plant (Hydroelectric) | 43.6 km | 1.04 GW | [6] |
| Chuck Lenzie Generating Station · Nevada Power Co | Power plant (Natural Gas) | 44.2 km | 1.24 GW | [6] |
| Silverhawk · Nevada Power Co | Power plant (Natural Gas) | 44.5 km | 1.06 GW | [6] |
| Apex Generating Station · Apex Generating Station | Power plant (Natural Gas) | 45.3 km | 524 MW | [6] |
| Harry Allen · Nevada Power Co | Power plant (Natural Gas) | 49.5 km | 654 MW | [6] |
| Unnamed substation | Substation | 1.09 km | 138 kV | [1] |
| Unnamed substation | Substation | 1.26 km | 138 kV | [1] |
| Unnamed substation | Substation | 2.67 km | 138 kV | [1] |
| Unnamed substation | Substation | 2.79 km | 230 kV | [1] |
| Unnamed substation | Substation | 2.89 km | 138 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| ARIDA 2 SOLAR FARMCAISO 1647 | Solar + storage | In study · proposed 2029-05 | 700 MW | [4] |
| MOSEYCAISO 2148 | Solar + storage | IA signed · proposed 2029-06 | 500 MW | [4] |
| ARIDA 3 SOLAR FARMCAISO 1795 | Solar + storage | In study · proposed 2030-07 | 450 MW | [4] |
| BONANZA PEAK SOLAR FARMCAISO 1655 | Solar + storage | IA signed · proposed 2027-12 | 400 MW | [4] |
| PURPLE SAGE ENERGY CENTERCAISO 1800 | Solar + storage | IA signed · proposed 2028-05 | 400 MW | [4] |
| ARIDA SOLAR FARMCAISO 1522 | Solar + storage | In study · proposed 2027-09 | 370 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
- 62,800 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
Other buildings on this campus
7- Switch12Operating · 379,300 sq ft footprint
- Switch Las Vegas 7Operating · 325,400 sq ft footprint
- Switch Las Vegas 8Operating · 265,000 sq ft footprint
- Switch Las Vegas 9Operating · 286,800 sq ft footprint
- Switch Las Vegas 11Operating · 230,700 sq ft footprint
- Switch Las Vegas 15Operating · 242,300 sq ft footprint
- Switch Las Vegas 14Operating · 224,500 sq ft footprint
All claims (provenance audit)
15| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Switch Las Vegas 16way/1558897570 name=Switch Las Vegas 16 | [1] | Likely | 2026-10-12 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-10-12 | Shown |
| Facility type | Colocation | [1] derived | Unverified | 2026-10-12 | Shown |
| Operator | Switchoperator=Switch | [1] | Likely | 2026-10-12 | Shown |
| Utility | Southern California Edisonterritory 17609: SOUTHERN CALIFORNIA EDISON CO (INVESTOR OWNED, SOUTHERN CALIFOR | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | None (non-RTO region) | [3] derived | Likely | — | Shown |
| Balancing authority | CISO | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Unnamed substation (138 kV)way/700964338 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 1.1 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 230 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 5.4 GW | [4] derived | Confirmed | 2026-10-12 | Shown |
| State avg. industrial price | 10.04¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 9.72¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 10.51 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 62,800 sq ft | [1] derived | Likely | 2026-10-12 | Shown |