DC
/

T5 Charlotte Campus

OperatingUnclassifiedBuildingKings Mountain, Cleveland County, North Carolina
20% profile completeness
14 claims from 5 sources
Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Floor area
Not yet sourced
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Duke Energy · None (non-RTO region)
Substation: Unnamed substation (100 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalSep 27, 2026
    Community map
    • Sep 27, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    T5 Charlotte Campus
  2. substation
    Unnamed substation (100 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.48 km away. Proximity does not establish that it serves the site.
  3. transmission
    100 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.2 km away). Not confirmed as the supply path.
  4. utility
    Duke Energy[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    None (non-RTO region)[3]
    Service territoryLikely
    Balancing authority: DUK
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

Mapped outline
Coordinates
35.25057, -81.39456
Address
131 Riverside Court, Kings Mountain, NC 28086[1]Likely
County
Cleveland County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply
Utility:
Duke Energy[2]Unverified

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Utility
Duke Energy[2]Unverified

Most likely retail provider among 4 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Rutherford Elec Member Corp, Broad River Electric Coop, INC, City of Kings Mountain - (Nc).

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
None (non-RTO region)[3]Likelyderived

Outside all ISO/RTO footprints; balancing authority shown separately.

Balancing authority
DUK[2]Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Unnamed substation (100 kV)[1]Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.5 km[1]Likelyderived
Highest-voltage line nearby
100 kV[1]Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
8.37¢/kWh[4]Confirmed

North Carolina statewide average, July 2026.

State avg. commercial price
10.73¢/kWh[4]Confirmed

North Carolina statewide average, July 2026.

Generation within 50 km
11.26 GW[5]Confirmedderived

85 EIA-reported plants within 50 km.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
100 kV lineTransmission line0.2 km100 kV[1]
Hilltop - Shelby 100kV · Duke EnergyTransmission line0.76 km100 kV[1]
Kings Mountain Energy Center · Carolina Power Partners, LLCPower plant (Natural Gas)6.1 km486 MW[5]
Cleveland Cnty Generating Facility · Southern Power CoPower plant (Natural Gas)9.1 km738 MW[5]
Mill Creek (Sc) · Duke Energy Carolinas, LLCPower plant (Natural Gas)10.6 km563 MW[5]
Broad River Energy Center · Broad River Energy LLCPower plant (Natural Gas)25.2 km867 MW[5]
James E. Rogers Energy Complex · Duke Energy Carolinas, LLCPower plant (Natural Gas)33.3 km1.39 GW[5]
Catawba · Duke Energy Carolinas, LLCPower plant (Nuclear)36.9 km2.31 GW[5]
Lincoln Combustion · Duke Energy Carolinas, LLCPower plant (Natural Gas)38.4 km1.53 GW[5]
Mcguire · Duke Energy Carolinas, LLCPower plant (Nuclear)45.3 km2.32 GW[5]
Unnamed substationSubstation0.48 km100 kV[1]
Unnamed substationSubstation1.11 km100 kV[1]
Unnamed substationSubstation1.49 km100 kV[1]
Unnamed substationSubstation1.9 km100 kV[1]
Unnamed substationSubstation2.65 km44 kV[1]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Site area
8.7 acres[1]Likelyderived

Area of the mapped OSM site outline.

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

14
FieldValueSourceConfidenceAs ofStatus
NameT5 Charlotte Campusway/715098032 name=T5 Charlotte Campus[1] Likely2026-09-27Shown
StatusOperating[1] derivedUnverified2026-09-27Shown
Websitehttps://t5datacenters.com/locations/t5-charlotte/[1] Likely2026-09-27Shown
Address131 Riverside Court, Kings Mountain, NC 28086[1] Likely2026-09-27Shown
UtilityDuke Energyterritory 5416: DUKE ENERGY CAROLINAS, LLC (INVESTOR OWNED, DUKE ENERGY CORP)[2] derivedUnverified2022Shown
ISO / RTONone (non-RTO region)[3] derivedLikely—Shown
Balancing authorityDUK[2] derivedLikely—Shown
Nearest mapped substationUnnamed substation (100 kV)way/715098037[1] derivedLikely2026-09-28Shown
Distance to substation0.5 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby100 kV[1] derivedLikely2026-09-28Shown
State avg. industrial price8.37¢/kWh[4] Confirmed2026-07Shown
State avg. commercial price10.73¢/kWh[4] Confirmed2026-07Shown
Generation within 50 km11.26 GW[5] derivedConfirmed202502Shown
Site area8.7 acres[1] derivedLikely2026-09-27Shown