Charlotte & Western Carolinas
Market boundary: facilities within 90 km of the metro center (editorial definition).
Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned.
Construction pipeline by expected completion
MW from phases with a projected completion date
No dated pipeline yet.
Power reality
Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.
- Announced—
- Interconnection requests—
- Contracted / approved—
- Under construction—
- Operational—
Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.
No large gaps in this scope.
Largest operators & owners
Online + pipeline MW at linked facilities
- Meta— · 4 sites
- Flexential— · 2 sites
- DartPoints— · 1 sites
- TierPoint— · 1 sites
Largest customers & end users
Tenants and workload owners, where sourced
None identified.
Utility exposure
Most likely retail utility by location (approximate)
- Duke Energy— · 17 sites
Grid operators (ISO / RTO)
By facility location
- None (non-RTO region)— · 17 sites
Largest facilities
By online + pipeline MW
| Facility | Status | Online | Pipeline |
|---|
Facilities by status
- Operating17
Campuses & sites (13)
Campus pages list their buildings
- DartPoints Spartanburgbuilding
- Flexential Charlotte - Northbuilding
- Flexential Charlotte - Southbuilding
- SEGRAbuilding
- Spectrum Charlotte National Data Centerbuilding
- T5 Charlotte Campusbuilding
- TierPoint - Charlotte Data Centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding