Unnamed data center — 4227 Lafayette Center Drive
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Government record, Community map.
Grid path
- →facilityUnnamed data center — 4227 Lafayette Center Drive
- →substationPoland Road Substation (230 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 1.73 km away. Proximity does not establish that it serves the site.
- →transmission230 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (1.39 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 38.90818, -77.47520
- Address
- County
- Fairfax County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Virginia statewide average, July 2026.
- State avg. commercial price
Virginia statewide average, July 2026.
- Generation within 50 km
62 EIA-reported plants within 50 km.
- Generation queued in county
3 active generation interconnection requests in Fairfax County: Storage 250 MW, Other 98 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 230 kV line | Transmission line | 1.39 km | 230 kV | [1] |
| 2137;2183 · Dominion Energy | Transmission line | 1.79 km | 230 kV | [1] |
| Potomac Energy Center, LLC · Potomac Energy Center LLC | Power plant (Natural Gas) | 17.7 km | 766 MW | [6] |
| Covanta Fairfax Energy · Covanta Fairfax Inc | Power plant (Biomass) | 31.2 km | 98 MW | [6] |
| Montgomery County Resource Recovery · Covanta Montgomery, Inc. | Power plant (Biomass) | 32.6 km | 54 MW | [6] |
| Dickerson Power · Dickerson Power, LLC | Power plant (Natural Gas) | 33.5 km | 299 MW | [6] |
| Possum Point · Virginia Electric & Power Co | Power plant (Natural Gas) | 44.6 km | 645 MW | [6] |
| Central Utility Plant At White Oak · GSA Metropolitan Service Center | Power plant (Natural Gas) | 45 km | 54 MW | [6] |
| Remington · Virginia Electric & Power Co | Power plant (Natural Gas) | 47.9 km | 604 MW | [6] |
| Marsh Run Generation Facility · Old Dominion Electric Coop | Power plant (Natural Gas) | 49.3 km | 481 MW | [6] |
| Poland Road Substation · Virginia Electric and Power Company | Substation | 1.73 km | 230 kV | [1] |
| Aviator Substation | Substation | 1.93 km | 230 kV | [1] |
| Takeoff Substation | Substation | 2.42 km | — | [1] |
| Walney Substation | Substation | 2.79 km | 230 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Clifton 230 kVPJM AG2-286 | Storage | In study · proposed 2023-12 | 150 MW | [4] |
| Reston 230 kVPJM AG2-326 | Storage | In study · proposed 2023-12 | 100 MW | [4] |
| Occoquan 230kVPJM AH1-197 | Other | In study · proposed 2021-08 | 98 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquiredMar 18, 1999[7]
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
- $2.3M[7]Recorded sale (valid and verified sale) · Oct 2, 2012 · parcel 0332 04 0007A5
None sourced yet
| Parcel | Record owner | Acres | Zoning / use | Building sq ft | Source |
|---|---|---|---|---|---|
| 0332 04 0007A5 Fairfax County, VA | — | — | Land use code 421 | — | [7] |
- Land use
- Annual property tax
- Not yet sourced
- Digital Realty IAD30 · 0.3 km · parcel 0332 01 0010D$12.8M · Jun 14, 2000 [7]
- Digital Realty IAD30 · 0.3 km · parcel 0332 01 0010D$37M · May 31, 2006 [7]
- Digital Realty IAD30 · 0.3 km · parcel 0332 01 0010D$43M · Oct 4, 2023 [7]
- Digital Realty IAD30 · 0.3 km · parcel 0332 01 0010D$38.4M · Jul 16, 2010 [7]
- Digital Realty IAD30 · 0.3 km · parcel 0332 01 0010D$1.4M · Apr 8, 1998 [7]
- Digital Realty IAD30 · 0.3 km · parcel 0332 01 0010D$766,908 · Mar 31, 1997 [7]
Size
What changed (last 3 years)
Follow this facility (RSS)Timeline
All claims (provenance audit)
19| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Address | 4227 Lafayette Center Drive, 20151 | [1] | Likely | 2026-09-27 | Shown |
| Utility | Dominion Energyterritory 19876: VIRGINIA ELECTRIC & POWER CO (INVESTOR OWNED, DOMINION RESOURCE | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [3] derived | Likely | — | Shown |
| Balancing authority | PJM | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Poland Road Substation (230 kV)way/686326402 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 1.7 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 230 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 348 MW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 10.07¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 11.68¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 3.29 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 18,400 sq ft | [1] derived | Likely | 2026-09-27 | Shown |
| Parcel / land records | 0332 04 0007A5 (Fairfax County) | [7] | Confirmed | 2026-09-27 | Shown |
| Assessed value (official) | $2.1M | [7] | Confirmed | 2026 | Shown |
| Last recorded sale price | $2.3M | [7] | Confirmed | 2012-10-02 | Shown |
| Last recorded sale date | Oct 2, 2012 | [7] | Confirmed | 2012-10-02 | Shown |
| Land use | Land use code 421 | [7] | Confirmed | 2026-09-27 | Shown |
| Land acquired | Mar 18, 1999 | [7] derived | Confirmed | 2026-09-27 | Shown |