Unnamed data center
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityUnnamed data center
- →substationKnob Creek Switching Station (345 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 1.37 km away. Proximity does not establish that it serves the site.
- →transmission345 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.18 km away). Not confirmed as the supply path.
- →utilityPedernales Electric Coop, INC[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
| Queue | Relationship | Stage | MW req. | MW appr. | Queued | Expected in service | POI / TO | Source · as of |
|---|---|---|---|---|---|---|---|---|
ERCOT 23INR0248 Limewood Storage · Limewood Bell Renewables LLC · Storage | Generation at a nearby substation Unverified Queue POI “3420 Temple Pecan Creek 138kV” names Temple Switching Station, a substation mapped 2.56 km from the site (OSM). Sharing a POI does not mean this generation serves the facility. | Interconnection agreement executed SS Completed, FIS Started, IA | 50 | — | — | Dec 29, 2028 | 3420 Temple Pecan Creek 138kV | [4] Sep 1, 2026 |
ERCOT 23INR0249 Limewood Solar · Limewood Bell Renewables, LLC · Solar | Generation at a nearby substation Unverified Queue POI “3420 Temple Pecan Creek 138kV” names Temple Switching Station, a substation mapped 2.56 km from the site (OSM). Sharing a POI does not mean this generation serves the facility. | In service SS Completed, FIS Completed, IA | 204.6 | — | — | In service Aug 10, 2026 | 3420 Temple Pecan Creek 138kV | [4] Sep 1, 2026 |
ERCOT 26INR0465 Lavita BESS · Lavita BESS, LLC · Storage | Generation at a nearby substation Unverified Queue POI “Tap 345kV Temple Pecan Creek (3412) - Temple Switch (3414) 345kV ckt 2” names Temple Switching Station, a substation mapped 2.56 km from the site (OSM). Sharing a POI does not mean this generation serves the facility. | System impact study SS Completed, FIS Started, No IA | 606 | — | — | Jul 1, 2028 | Tap 345kV Temple Pecan Creek (3412) - Temple Switch (3414) 345kV ckt 2 | [4] Sep 1, 2026 |
ERCOT 29INR0206 Riviera Gas · BKV-BPP Power · Gas | Generation at a nearby substation Unverified Queue POI “Tap #3414 Temple Switch - #3780 Tower Switch 345kV DCKT Line” names Temple Switching Station, a substation mapped 2.56 km from the site (OSM). Sharing a POI does not mean this generation serves the facility. | System impact study SS Completed, FIS Started, No IA | 636.9 | — | — | Jun 14, 2030 | Tap #3414 Temple Switch - #3780 Tower Switch 345kV DCKT Line | [4] Sep 1, 2026 |
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 31.05748, -97.29841
- County
- Bell County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Most likely retail provider among 5 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Heart of Texas Electric Coop, Bartlett Electric Coop, INC, Oncor Electric Delivery Company LLC, City of Bartlett - (Tx).
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Texas statewide average, July 2026.
- State avg. commercial price
Texas statewide average, July 2026.
- Generation within 50 km
20 EIA-reported plants within 50 km.
- Generation queued in county
9 active generation interconnection requests in Bell County: Storage 1,439 MW, Gas 637 MW, Solar 264 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 345 kV line | Transmission line | 0.18 km | 345 kV | [1] |
| 69 kV line | Transmission line | 0.19 km | 69 kV | [1] |
| 138 kV line | Transmission line | 0.21 km | 138 kV | [1] |
| Temple Power Station · Temple Generation Holdings LLC | Power plant (Natural Gas) | 1.8 km | 1.58 GW | [6] |
| Five Wells Solar Center - Hybrid · Five Wells Solar Center, LLC | Power plant (Solar) | 7.5 km | 579 MW | [6] |
| Big Elm Solar · Big Elm Solar, LLC | Power plant (Solar) | 12.1 km | 200 MW | [6] |
| Orion III Solar Project · Ben Milam Solar 3 LLC | Power plant (Solar) | 19.8 km | 250 MW | [6] |
| Orion I Solar Project · Ben Milam Solar 1 LLC | Power plant (Solar) | 29.1 km | 200 MW | [6] |
| Orion II Solar Project · Ben Milam Solar 2 LLC | Power plant (Solar) | 34.8 km | 250 MW | [6] |
| Bpl Crown Solar LLC · BPL Crown Solar LLC | Power plant (Solar) | 38.1 km | 100 MW | [6] |
| Bpl Sol Solar LLC · BPL Sol Solar LLC | Power plant (Solar) | 38.1 km | 100 MW | [6] |
| Knob Creek Switching Station · Oncor | Substation | 1.37 km | 345 kV | [1] |
| Panda Temple 1 Substation · Panda Power | Substation | 1.59 km | 345 kV | [1] |
| Panda Temple 2 Substation · Panda Power | Substation | 1.73 km | 345 kV | [1] |
| Temple Switching Station · Oncor | Substation | 2.56 km | 345 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Riviera GasERCOT 29INR0206 · BKV-BPP Power | Gas | In study · proposed 2030-06 | 637 MW | [4] |
| Lavita BESSERCOT 26INR0465 · Lavita BESS, LLC | Storage | In study · proposed 2028-07 | 606 MW | [4] |
| Bell County Morgan StorageERCOT 26INR0615 · DM-BCTRM, LLC | Storage | In study · proposed 2029-12 | 256 MW | [4] |
| Bell County Leifester StorageERCOT 26INR0614 · DM-BCRCML, LLC | Storage | In study · proposed 2029-09 | 205 MW | [4] |
| Goldeneye BESSERCOT 25INR0100 · Black Mountain Energy Storage II | Storage | IA signed · proposed 2028-05 | 202 MW | [4] |
| Cosper SolarERCOT 25INR0281 · Gransolar Texas Twenty LLC | Solar | IA signed · proposed 2027-11 | 148 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
12| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Utility | Pedernales Electric Coop, INCterritory 14626: PEDERNALES ELECTRIC COOP, INC (COOPERATIVE, PEDERNALES ELECTRIC | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | ERCOTELECTRIC RELIABILITY COUNCIL OF TEXAS, INC. | [3] derived | Likely | — | Shown |
| Balancing authority | ERCO | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Knob Creek Switching Station (345 kV)way/462426907 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 1.4 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 345 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 2.34 GW | [4] derived | Confirmed | 2026-09-01 | Shown |
| State avg. industrial price | 7.07¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 8.47¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 3.34 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 145,300 sq ft | [1] derived | Likely | 2026-09-27 | Shown |