DC
/

Unnamed data center

OperatingUnclassifiedBuildingCass County, Michigan
10% profile completeness
12 claims from 7 sources
Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Building footprint
598,500 sq ft[1]
Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Midwest Energy Cooperative · PJM
Substation: Unnamed substation (34.5 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalSep 27, 2026
    Community map
    • Sep 27, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    Unnamed data center
  2. substation
    Unnamed substation (34.5 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.17 km away. Proximity does not establish that it serves the site.
  3. transmission
    138 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.14 km away). Not confirmed as the supply path.
  4. utility
    Midwest Energy Cooperative[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    PJM[3]
    Service territoryLikely
    Balancing authority: PJM
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

Mapped outline
Coordinates
41.99311, -86.09876
County
Cass County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Utility

Most likely retail provider among 3 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Wolverine Power Supply Coop, City of Dowagiac.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
PJM[3]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
PJM[2]Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Unnamed substation (34.5 kV)[1]Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.2 km[1]Likelyderived
Highest-voltage line nearby
138 kV[1]Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
9.81¢/kWh[5]Confirmed

Michigan statewide average, July 2026.

State avg. commercial price
16.46¢/kWh[5]Confirmed

Michigan statewide average, July 2026.

Generation within 50 km
5.82 GW[6]Confirmedderived

25 EIA-reported plants within 50 km.

Generation queued in county
1.81 GW[4]Confirmedderived

12 active generation interconnection requests in Cass County: Solar 1,439 MW, Solar + storage 220 MW, Storage 150 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
138 kV lineTransmission line0.14 km138 kV[1]
69 kV lineTransmission line0.58 km69 kV[1]
Indeck Niles Energy Center · Indeck Niles, LLCPower plant (Natural Gas)17.8 km1.08 GW[6]
St. Joseph Solar · Indiana Michigan Power CoPower plant (Solar)29.1 km20 MW[6]
University of Notre Dame · University of Notre DamePower plant (Natural Gas)33.6 km39 MW[6]
Donald C Cook · Indiana Michigan Power CoPower plant (Nuclear)38.6 km2.18 GW[6]
New Covert Generating Facility · Consumers Energy Co - (MI)Power plant (Natural Gas)40 km1.59 GW[6]
Honeysuckle Solar Farm · Lightsource Renewable Energy Asset Management, LLCPower plant (Solar)42.9 km150 MW[6]
St Joseph Energy Center · St Joseph Energy Center LLCPower plant (Natural Gas)45.4 km715 MW[6]
Olivepv · Indiana Michigan Power CoPower plant (Solar)46 km5 MW[6]
Unnamed substationSubstation0.17 km34.5 kV[1]
Unnamed substationSubstation0.3 km34.5 kV[1]
Unnamed substationSubstation0.71 km34.5 kV[1]
Colby Substation · American Electric PowerSubstation0.78 km138 kV[1]
Poplar St. Substation · City of Dowagiac Eletric Dept.Substation1.75 km34.5 kV[1]
Largest queued generation in this countyFuelQueue statusMWSource
J4102 at WEEDS LAKE - HIPLE 345.0kVMISO J4102SolarIn study · proposed 2029-08539 MW[7]
Stinger 138 kVPJM AF2-396 - moved to TC1Solar + storageIn study · proposed 2023-12200 MW[4]
Wingstem Solar Energy FarmPJM AE1-170SolarSuspended · proposed 2025-12150 MW[4]
Kenzie Creek-Stone Lake 69 kVPJM AF2-083SolarIn study · proposed 2022-10150 MW[4]
Kenzie Creek-Colby 138 kVPJM AH1-309SolarIn study · proposed 2023-12150 MW[4]
Granger - Ontwa 138 kVPJM AI1-166StorageIn study · proposed 2028-12150 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Building footprint
598,500 sq ft[1]Likelyderived

Computed from the mapped OSM building outline.

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

12
FieldValueSourceConfidenceAs ofStatus
StatusOperating[1] derivedUnverified2026-09-27Shown
UtilityMidwest Energy Cooperativeterritory 12377: MIDWEST ENERGY COOPERATIVE (COOPERATIVE, MIDWEST ENERGY COOPERA[2] derivedUnverified2022Shown
ISO / RTOPJMPJM INTERCONNECTION, LLC[3] derivedLikely—Shown
Balancing authorityPJM[2] derivedLikely—Shown
Nearest mapped substationUnnamed substation (34.5 kV)way/1242534297[1] derivedLikely2026-09-28Shown
Distance to substation0.2 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby138 kV[1] derivedLikely2026-09-28Shown
Generation queued in county1.81 GW[4] derivedConfirmed2026-09-27Shown
State avg. industrial price9.81¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price16.46¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km5.82 GW[6] derivedConfirmed202502Shown
Building footprint598,500 sq ft[1] derivedLikely2026-09-27Shown