Unnamed data center
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Government record, Community map.
Grid path
- →facilityUnnamed data center
- →substationUnnamed substation (138 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.31 km away. Proximity does not establish that it serves the site.
- →transmission138 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.07 km away). Not confirmed as the supply path.
- →utilityAmerican Electric Power[3]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 40.11576, -83.00263
- County
- Franklin County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of record
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Property owner of record
- Utility
Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: City of Columbus - (Oh).
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Ohio statewide average, July 2026.
- State avg. commercial price
Ohio statewide average, July 2026.
- Generation within 50 km
13 EIA-reported plants within 50 km.
- Generation queued in county
8 active generation interconnection requests in Franklin County: Solar 845 MW, Storage 810 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 138 kV line | Transmission line | 0.07 km | 138 kV | [1] |
| O'Shaughnessy Hydro · City of Columbus - (OH) | Power plant (Hydroelectric) | 11.3 km | 5 MW | [7] |
| Renick Run Pumping Station 03-04 · City of Columbus - (OH) | Power plant (Petroleum) | 20.7 km | 2 MW | [7] |
| Igs Cmh4, LLC · Greenbacker Renewable Energy Corporation | Power plant (Solar) | 33 km | 4 MW | [7] |
| Madison Fields Solar Project, LLC · Madison Fields Solar Project, LLC | Power plant (Solar) | 39.7 km | 180 MW | [7] |
| Big Plain Solar, LLC · Leeward Asset Management, LLC | Power plant (Solar) | 40.1 km | 196 MW | [7] |
| Denison Solar Array · AEP Onsite Partners, LLC | Power plant (Solar) | 41.5 km | 2 MW | [7] |
| Darby Power, LLC · Darby Power, LLC | Power plant (Natural Gas) | 47.1 km | 480 MW | [7] |
| Fox Squirrel Solar · EDF Renewable Asset Holdings, Inc. | Power plant (Solar) | 48.8 km | 577 MW | [7] |
| Unnamed substation | Substation | 0.31 km | 138 kV | [1] |
| Busch Substation | Substation | 1.19 km | 69 kV | [1] |
| Worthington Industries | Substation | 1.22 km | 69 kV | [1] |
| Huntley Substation · AEP Ohio | Substation | 1.32 km | 138 kV | [1] |
| Diamond Innovations Substation | Substation | 2.15 km | 138 kV | [1] |
| Lazelle Substation | Substation | 2.46 km | 69 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Beatty 345 kVPJM AG2-376 | Storage | In study · proposed 2024-11 | 400 MW | [5] |
| Cole 345 kVPJM AH1-318 | Storage | In study · proposed 2025-12 | 310 MW | [5] |
| Cole Road 345 kVPJM AI2-171 | Solar | In study · proposed 2023-12 | 310 MW | [5] |
| Cole 345 kVPJM AF1-275 | Solar | In study · proposed 2022-12 | 250 MW | [5] |
| Pleasant Prairie SolarPJM AE2-214 | Solar | IA signed · proposed 2026-12 | 200 MW | [5] |
| Hayden 345 kVPJM AH1-270 | Solar | In study · proposed 2023-12 | 85 MW | [5] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquiredJun 21, 2016[2]
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
| Parcel | Record owner | Acres | Zoning / use | Building sq ft | Source |
|---|---|---|---|---|---|
| 610-210593 Franklin County, OH | COMMUNICATIONS REALTY INVESTMENTS COLUMBUS JV LLC 1601 19TH ST STE 650 DENVER CO 80202-3068 | 7.59 | data center | 206,724 | [2] |
- Site area
Sum of county land area across parcels.
- Land use
- Annual property tax
- Not yet sourced
- DartPoints Dublin · 11.4 km · parcel 273-001702$15.3M · Oct 29, 2020 [2]
- TJX Corporate Techno · 16.4 km · parcel 222-004441$2.1M · Jul 23, 2010 [2]
- Amazon Web Services · 16.5 km · parcel 050-011455$226,596 · Oct 18, 2022 [2]
- Compugen New Albany · 16.5 km · parcel 222-004644$2.2M · Oct 1, 2014 [2]
- Amazon Web Services · 16.8 km · parcel 275-000010$20,000 · Nov 17, 2016 [2]
- Compugen New Albany · 16.9 km · parcel 222-001940$6.8M · Feb 6, 2023 [2]
Size
What changed (last 3 years)
Follow this facility (RSS)Timeline
- Jun 21, 2016[2]
Deed/transfer recorded for parcel 610-210593 (no sale price disclosed).
All claims (provenance audit)
19| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Property owner of record | Communications Realty Investments Columbus Jv LLCParcel 610-210593: COMMUNICATIONS REALTY INVESTMENTS COLUMBUS JV LLC | [2] | Confirmed | 2026-09-27 | Shown |
| Utility | American Electric Powerterritory 14006: OHIO POWER CO (INVESTOR OWNED, AMERICAN ELECTRIC POWER CO) | [3] derived | Unverified | 2022 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [4] derived | Likely | — | Shown |
| Balancing authority | PJM | [3] derived | Likely | — | Shown |
| Nearest mapped substation | Unnamed substation (138 kV)way/1556419765 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.3 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 138 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 1.66 GW | [5] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 10.95¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 14.06¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 1.45 GW | [7] derived | Confirmed | 202502 | Shown |
| Floor area | 206,700 sq ft | [2] | Confirmed | 2026-09-27 | Shown |
| Building footprint | 56,300 sq ft | [1] derived | Likely | 2026-09-27 | Shown |
| Site area | 7.6 acres | [2] | Confirmed | 2026-09-27 | Shown |
| Parcel / land records | 610-210593 (Franklin County) | [2] | Confirmed | 2026-09-27 | Shown |
| Assessed value (official) | $42.1M | [2] | Confirmed | 2026 | Shown |
| Land use | data center | [2] | Confirmed | 2026-09-27 | Shown |
| Land acquired | Jun 21, 2016 | [2] derived | Confirmed | 2026-09-27 | Shown |