DC
/

Unnamed data center

OperatingUnclassifiedBuildingPlatte County, Missouri
10% profile completeness
11 claims from 5 sources
Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Building footprint
59,200 sq ft[1]
Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Evergy Missouri West · SPP
Substation: North Congress Substation (161 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalSep 27, 2026
    Community map
    • Sep 27, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    Unnamed data center
  2. substation
    North Congress Substation (161 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.77 km away. Proximity does not establish that it serves the site.
  3. transmission
    Ferrelview-Roanridge (161 kV)[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.7 km away). Not confirmed as the supply path.
  4. utility
    Evergy Missouri West[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    SPP[3]
    Service territoryLikely
    Balancing authority: SWPP
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

Mapped outline
Coordinates
39.29051, -94.67579
County
Platte County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Utility

Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Platte-Clay Electric Coop, INC.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
SPP[3]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
SWPP[2]Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
North Congress Substation (161 kV)[1]Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.8 km[1]Likelyderived
Highest-voltage line nearby
161 kV[1]Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
9.87¢/kWh[4]Confirmed

Missouri statewide average, July 2026.

State avg. commercial price
12.64¢/kWh[4]Confirmed

Missouri statewide average, July 2026.

Generation within 50 km
3.8 GW[5]Confirmedderived

16 EIA-reported plants within 50 km.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
Ferrelview-Roanridge · EvergyTransmission line0.7 km161 kV[1]
161 kV lineTransmission line0.74 km161 kV[1]
Nearman Creek · City of Kansas City - (KS)Power plant (Coal)13.7 km315 MW[5]
Quindaro · City of Kansas City - (KS)Power plant (Natural Gas)16 km251 MW[5]
Northeast (Mo) · Evergy MetroPower plant (Petroleum)21.1 km396 MW[5]
Kaw · City of Kansas City - (KS)Power plant (Natural Gas)22.8 km140 MW[5]
Hawthorn · Evergy MetroPower plant (Coal)24.6 km955 MW[5]
Iatan · Evergy MetroPower plant (Coal)31.4 km1.6 GW[5]
Station H · City of Independence - (MO)Power plant (Natural Gas)32.6 km39 MW[5]
Station I · City of Independence - (MO)Power plant (Petroleum)35.7 km38 MW[5]
North Congress Substation · EvergySubstation0.77 km161 kV[1]
American Air Substation · EvergySubstation1.69 km161 kV[1]
Ferrelview Substation · EvergySubstation2.54 km161 kV[1]
Roanridge Substation · EvergySubstation2.86 km161 kV[1]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Building footprint
59,200 sq ft[1]Likelyderived

Computed from the mapped OSM building outline.

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

11
FieldValueSourceConfidenceAs ofStatus
StatusOperating[1] derivedUnverified2026-09-27Shown
UtilityEvergy Missouri Westterritory 12698: EVERGY MISSOURI WEST (INVESTOR OWNED, GREAT PLAINS ENERGY)[2] derivedUnverified2022Shown
ISO / RTOSPPSOUTHWEST POWER POOL[3] derivedLikely—Shown
Balancing authoritySWPP[2] derivedLikely—Shown
Nearest mapped substationNorth Congress Substation (161 kV)way/424590652[1] derivedLikely2026-09-28Shown
Distance to substation0.8 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby161 kV[1] derivedLikely2026-09-28Shown
State avg. industrial price9.87¢/kWh[4] Confirmed2026-07Shown
State avg. commercial price12.64¢/kWh[4] Confirmed2026-07Shown
Generation within 50 km3.8 GW[5] derivedConfirmed202502Shown
Building footprint59,200 sq ft[1] derivedLikely2026-09-27Shown