Kansas City
Market boundary: facilities within 50 km of the metro center (editorial definition).
Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned.
Construction pipeline by expected completion
MW from phases with a projected completion date
No dated pipeline yet.
Power reality
Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.
- Announced—
- Interconnection requests—
- Contracted / approved—
- Under construction—
- Operational126 MW
Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.
No large gaps in this scope.
Interconnection queues
Active requests to connect to the grid (SPP). Requests are applications, not commitments — most never get built.
Largest operators & owners
Online + pipeline MW at linked facilities
- Google126 MW + 0 MW · 1 sites
- Patmos Hosting, Inc.— · 1 sites
- TierPoint— · 1 sites
- Meta— · 1 sites
Largest customers & end users
Tenants and workload owners, where sourced
None identified.
Utility exposure
Most likely retail utility by location (approximate)
- Evergy Missouri West126 MW + 0 MW · 9 sites
- Evergy Metro— · 5 sites
- Union Electric CO - (Mo)— · 2 sites
Grid operators (ISO / RTO)
By facility location
- SPP126 MW + 0 MW · 14 sites
- MISO— · 2 sites
Largest facilities
By online + pipeline MW
| Facility | Status | Online | Pipeline |
|---|---|---|---|
| Google Kansas City East | Operating | 126 MW | — |
Facilities by status
- Operating16
Campuses & sites (16)
Campus pages list their buildings
- Google Kansas City East126 MW online
- Black Rock Financial Managementbuilding
- Data Center Lenexabuilding
- Meta Data Centerbuilding
- Netrality Data Centerssite
- Patmos Hosting, Inc. data center — 1601 McGee Streetbuilding
- TierPoint data centerbuilding
- U.S. Bank National Data Process Centerbuilding
- Unnamed data centersite
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data centerbuilding
- Unnamed data center — 10801 North Amity Avenuebuilding
- Unnamed data center — 15725 College Boulevardbuilding
- Unnamed data center — 23800 West Valley Parkwaybuilding