Vantage VA15
Vantage VA15 is an under construction colocation in Sterling, Virginia. Operated or owned by Vantage Data Centers. Power capacity has not been disclosed or collected yet. Verification: under construction. 5 cited sources.
Part of Vantage Data Centers — Sterling, VA campus
Follow
Get changes to Vantage VA15
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “Vantage VA15.” /facilities/vantage-va15-sterling-va. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_vantage_va15_sterling_va_2026,
title = {{Vantage VA15}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/vantage-va15-sterling-va}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
- ⚠ No public interconnection record for this load.
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Permit / site plan, Community map.
Grid path
- →facilityVantage VA15
- →substationUnnamed substation[1]Proximity onlyUnverifiedNearest mapped substation, 0.2 km away. Proximity does not establish that it serves the site.
- →transmissionPacific Loop (230 kV)[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.04 km away). Not confirmed as the supply path.
- utilityNot identifiedUnknownUnverified
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling
Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source
On-site generation & air permits
Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events
Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source
Utility & rates
Not yet collected: we haven't found a source for a large-load tariff or commission docket for the serving utility. Know one? Add a source
Location & imagery
Mapped outline- Coordinates
- 39.00086, -77.43665
- Address
- 45210 Vantage Data Plaza, Sterling, VA 20166[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likely
- County
- Loudoun County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Operator
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- Nearest mapped substation
- Unnamed substation[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- 0.2 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
- Highest-voltage line nearby
- 230 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
- 10.07¢/kWh[4]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Virginia statewide average, July 2026.
- State avg. commercial price
- 11.68¢/kWh[4]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Virginia statewide average, July 2026.
- Generation within 50 km
- 1.65 GW[5]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
64 EIA-reported plants within 50 km.
- Generation queued in county
- 1.04 GW[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived
11 active generation interconnection requests in Loudoun County: Storage 940 MW, Solar 100 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Pacific Loop · Virginia Electric & Power Company | Transmission line | 0.04 km | 230 kV | [1] |
| 2137 · Virginia Electric & Power Company | Transmission line | 0.57 km | 230 kV | [1] |
| 2081;2150 · Dominion Energy | Transmission line | 0.88 km | 230 kV | [1] |
| 2081 | Transmission line | 1.36 km | 230 kV | [1] |
| 2150 · Dominion Energy | Transmission line | 1.36 km | 230 kV | [1] |
| 2079 · Dominion Energy | Transmission line | 1.55 km | 230 kV | [1] |
| Potomac Energy Center, LLC · Potomac Energy Center LLC | Power plant (Natural Gas) | 11.3 km | 766 MW | [5] |
| Montgomery County Resource Recovery · Covanta Montgomery, Inc. | Power plant (Biomass) | 22.3 km | 54 MW | [5] |
| Dickerson Power · Dickerson Power, LLC | Power plant (Natural Gas) | 23.3 km | 299 MW | [5] |
| Nih Cogeneration Facility · National Institutes of Health | Power plant (Natural Gas) | 29.6 km | 28 MW | [5] |
| Covanta Alexandria/Arlington Energy · Covanta Alexandria/Arlington | Power plant (Biomass) | 34.7 km | 29 MW | [5] |
| Covanta Fairfax Energy · Covanta Fairfax Inc | Power plant (Biomass) | 38 km | 98 MW | [5] |
| Central Utility Plant At White Oak · GSA Metropolitan Service Center | Power plant (Natural Gas) | 39.5 km | 54 MW | [5] |
| Blake Solar Plant · Horus West Virginia 1, LLC | Power plant (Solar) | 45 km | 80 MW | [5] |
| Unnamed substation | Substation | 0.2 km | — | [1] |
| Pacific Substation · Dominion Energy | Substation | 0.56 km | 230 kV | [1] |
| Ocean Court Substation | Substation | 0.67 km | 230 kV | [1] |
| Global Plaza Substation · Dominion Energy | Substation | 0.86 km | 230 kV | [1] |
| Unnamed substation | Substation | 1.06 km | — | [1] |
| Sterling Park Substation · Dominion Energy | Substation | 1.53 km | 230 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Loudoun 230 kVPJM AG2-285 | Storage | In study · proposed 2023-12 | 150 MW | [3] |
| Beaumeade 230 kVPJM AG2-287 | Storage | In study · proposed 2023-12 | 150 MW | [3] |
| New Road StoragePJM AE2-019 | Storage | IA signed · proposed 2026-12 | 120 MW | [3] |
| Dulles SolarPJM AF1-147 | Solar | IA signed · proposed 2023-12 | 100 MW | [3] |
| Roundtable 230 kVPJM AG2-307 | Storage | In study · proposed 2023-12 | 100 MW | [3] |
| Shelhorn 230 kVPJM AG2-323 | Storage | In study · proposed 2023-12 | 100 MW | [3] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
- Permit / case numbers
- BLDC-2024-010722[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
Real estate
None sourced yet
None sourced yet
None sourced yet
| Parcel | Record owner | Acres | Zoning / use | Building sq ft | Source |
|---|---|---|---|---|---|
| 044292829000 Loudoun County, VA | — | 4.78 | OP (ZRTD-2017-0010) · Data Center | 182,782 under construction | [2] |
- Site area
- 4.8 acres[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
Legal acreage of the parcel(s).
- Zoning
- OP[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
- Land use
- Data Center[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
- Annual property tax
- Not yet sourced
Size
- Floor area
- 182,800 sq ft[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
Building area on the county's data-center parcel inventory (from building permits).
- Building footprint
- 32,400 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Computed from the mapped OSM building outline.
- Parcel / land records
- MCPI 044292829000 (Loudoun County)[2]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.Confirmed
What changed (last 3 years)
Follow this facility (RSS)- StatusUnder constructionOct 5, 2026[2]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.→OperatingOct 12, 2026[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Timeline
No dated events sourced yet.
Other buildings on this campus
6- Vantage VA11Operating · 127,800 sq ft footprint
- Vantage VA12Operating · 115,800 sq ft footprint
- Vantage VA13Operating · 123,100 sq ft footprint
- Vantage VA2Operating · 187,800 sq ft footprint
- Vantage VA14Operating · 122,200 sq ft footprint
- Vantage VA16Under construction · 64,100 sq ft footprint
All claims (provenance audit)
20| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Vantage VA15way/1489625232 name=Vantage VA15 | [1] | Likely | 2026-10-12 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-10-12 | Superseded / alternative |
| Status | Under construction | [2] derived | Confirmed | 2026-10-12 | Shown |
| Facility type | Colocation | [1] derived | Unverified | 2026-10-12 | Shown |
| Address | 45210 Vantage Data Plaza, Sterling, VA 20166 | [1] | Likely | 2026-10-12 | Shown |
| Operator | Vantage Data Centersoperator=Vantage Data Centers | [1] | Likely | 2026-10-12 | Shown |
| Nearest mapped substation | Unnamed substationway/1317924409 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.2 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 230 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 1.04 GW | [3] derived | Confirmed | 2026-10-12 | Shown |
| State avg. industrial price | 10.07¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 11.68¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 1.65 GW | [5] derived | Confirmed | 202502 | Shown |
| Permit / case numbers | BLDC-2024-010722 | [2] | Confirmed | 2026-10-12 | Shown |
| Floor area | 182,800 sq ft | [2] | Confirmed | 2026-10-12 | Shown |
| Building footprint | 32,400 sq ft | [1] derived | Likely | 2026-10-12 | Shown |
| Site area | 4.8 acres | [2] | Confirmed | 2026-10-12 | Shown |
| Parcel / land records | MCPI 044292829000 (Loudoun County) | [2] | Confirmed | 2026-10-12 | Shown |
| Zoning | OP | [2] | Confirmed | 2026-10-12 | Shown |
| Land use | Data Center | [2] | Confirmed | 2026-10-12 | Shown |