Columbia River (The Dalles–Boardman)
Market boundary: facilities within 100 km of the metro center (editorial definition).
Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned.
Construction pipeline by expected completion
MW from phases with a projected completion date
No dated pipeline yet.
Power reality
Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.
- Announced—
- Interconnection requests—
- Contracted / approved—
- Under construction—
- Operational185 MW
Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.
No large gaps in this scope.
Largest operators & owners
Online + pipeline MW at linked facilities
- Google185 MW + 0 MW · 5 sites
- Amazon Web Services— · 67 sites
- Rowan Digital Infrastructure— · 4 sites
Largest customers & end users
Tenants and workload owners, where sourced
None identified.
Utility exposure
Most likely retail utility by location (approximate)
- Northern Wasco County Pud185 MW + 0 MW · 5 sites
- PacifiCorp— · 36 sites
- Umatilla Electric Coop Assn— · 30 sites
- Bonneville Power Administration— · 5 sites
Grid operators (ISO / RTO)
By facility location
- None (non-RTO region)185 MW + 0 MW · 76 sites
Largest facilities
By online + pipeline MW
| Facility | Status | Online | Pipeline |
|---|---|---|---|
| Google The Dalles | Operating | 185 MW | — |
Facilities by status
- Operating76
Campuses & sites (3)
Campus pages list their buildings
- Google The Dalles185 MW online
- Amazon Web Services data centerbuilding
- Google Taylor Lake Data Centerbuilding