Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned. Average industrial electricity price: 8.92¢/kWh (EIA).
AI data center capacity over time
Facility power at satellite-tracked AI campuses (Epoch AI timelines), quarterly
Construction pipeline by expected completion
MW from phases with a projected completion date
No dated pipeline yet.
Power reality
Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.
- Announced—
- Interconnection requests—
- Contracted / approved—
- Under construction—
- Operational428 MW
Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.
No large gaps in this scope.
Markets
Click through to drill down
| Name | Facilities | Online | Pipeline | |
|---|---|---|---|---|
| Portland / Hillsboro | 42 | 243 MW | — | |
| Columbia River (The Dalles–Boardman) | 76 | 185 MW | — |
Largest operators & owners
Online + pipeline MW at linked facilities
- Meta243 MW + 0 MW · 8 sites
- Google185 MW + 0 MW · 5 sites
- Amazon Web Services— · 67 sites
- Flexential— · 7 sites
- QTS Data Centers— · 7 sites
- STACK Infrastructure— · 6 sites
- Apple— · 4 sites
- Rowan Digital Infrastructure— · 4 sites
- Digital Fortress— · 3 sites
- Digital Realty— · 3 sites
- Data Center West, Inc.— · 2 sites
- NTT Global Data Centers— · 2 sites
Largest customers & end users
Tenants and workload owners, where sourced
- Meta243 MW + 0 MW · 1 sites
Utility exposure
Most likely retail utility by location (approximate)
- Portland General Electric243 MW + 0 MW · 40 sites
- Northern Wasco County Pud185 MW + 0 MW · 5 sites
- PacifiCorp— · 40 sites
- Umatilla Electric Coop Assn— · 30 sites
- Bonneville Power Administration— · 16 sites
- Salem Electric - (Or)— · 2 sites
- City of Eugene - (Or)— · 1 sites
- City of Forest Grove— · 1 sites
Grid operators (ISO / RTO)
By facility location
- None (non-RTO region)428 MW + 0 MW · 136 sites
Largest facilities
By online + pipeline MW
| Facility | Status | Online | Pipeline |
|---|---|---|---|
| Meta-QTS Hillsboro 2 | Operating | 243 MW | — |
| Google The Dalles | Operating | 185 MW | — |
Facilities by status
- Operating135
- Under construction1