Salt Lake City
Market boundary: facilities within 55 km of the metro center (editorial definition).
Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned.
Construction pipeline by expected completion
MW from phases with a projected completion date
Power reality
Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.
- Announced411 MW
- Interconnection requests—
- Contracted / approved—
- Under construction411 MW
- Operational179 MW
Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.
No large gaps in this scope.
Largest operators & owners
Online + pipeline MW at linked facilities
- Meta179 MW + 0 MW · 6 sites
- Flexential— · 5 sites
- DataBank— · 5 sites
Largest customers & end users
Tenants and workload owners, where sourced
- Meta179 MW + 0 MW · 1 sites
Utility exposure
Most likely retail utility by location (approximate)
- PacifiCorp179 MW + 411 MW · 21 sites
Grid operators (ISO / RTO)
By facility location
- None (non-RTO region)179 MW + 411 MW · 21 sites
Largest facilities
By online + pipeline MW
| Facility | Status | Online | Pipeline |
|---|---|---|---|
| QTS Eagle Mountain | Under construction | — | 411 MW |
| Meta Eagle Mountain | Operating | 179 MW | — |
Facilities by status
- Operating20
- Under construction1
Campuses & sites (11)
Campus pages list their buildings
- QTS Eagle Mountain · 411 MW pipeline
- Meta Eagle Mountain179 MW online
- eBaybuilding
- Ebaybuilding
- FiberState Datacenterbuilding
- Flexential Salt Lake City - Downtownbuilding
- Flexential Salt Lake City - Fair Parkbuilding
- Flexential Salt Lake City - Lindonsite
- Flexential Salt Lake City - Millcreekbuilding
- Flexential Salt Lake City - South Valleybuilding
- Verizonbuilding