Meta Eagle Mountain
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- EnergizationDec 7, 2025
Satellite imagery
- Dec 7, 2025 · Buildings 1 and 2 both estimated to be operational 90 days after testing was underway in September.[1]
- OperationalDec 7, 2025
Satellite imagery
- Dec 7, 2025 · Buildings 1 and 2 both estimated to be operational 90 days after testing was underway in September.[1]
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Model estimate, Satellite imagery.
Grid path
- →facilityMeta Eagle Mountain
- →substationSatellite imageryLikely2 substation outlines traced inside the campus on satellite imagery; OSM maps Unnamed substation 0.24 km away
- →transmission345 kV line[5]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.23 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 40.26781, -112.01951
- Address
- County
- Utah County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developer
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workload
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
Power (all fields)
- Current facility power
Estimated total facility power (IT plus cooling and overhead) at the latest observed milestone.
- Current IT capacity
Estimated IT load currently online, based on buildings observed operational.
- Estimated annual consumption
179 MW × 8,760 h × 70% utilization.
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Outside all ISO/RTO footprints; balancing authority shown separately.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Utah statewide average, July 2026.
- State avg. commercial price
Utah statewide average, July 2026.
- Generation within 50 km
21 EIA-reported plants within 50 km.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 345 kV line | Transmission line | 0.23 km | 345 kV | [5] |
| Lake Side Power Plant · PacifiCorp | Power plant (Natural Gas) | 23.6 km | 1.18 GW | [7] |
| Byu Central Heating Plant · Brigham Young University (BYU) | Power plant (Natural Gas) | 31.8 km | 14 MW | [7] |
| Nebo Power Station · Utah Associated Mun Power Sys | Power plant (Natural Gas) | 33.7 km | 130 MW | [7] |
| Whitehead · City of Springville - (UT) | Power plant (Natural Gas) | 35.2 km | 24 MW | [7] |
| Spanish Fork Wind Park 2 LLC · Spanish Fork Wind Park 2, LLC | Power plant (Wind) | 43.1 km | 19 MW | [7] |
| West Valley Generation Project · Utah Municipal Power Agency | Power plant (Natural Gas) | 44.4 km | 185 MW | [7] |
| Murray Turbine · City of Murray - (UT) | Power plant (Natural Gas) | 46 km | 36 MW | [7] |
| Clover Creek Solar Community Solar · AES Distributed Energy | Power plant (Solar) | 48.8 km | 80 MW | [7] |
| Unnamed substation | Substation | 0.24 km | 345 kV | [5] |
| PacifiCorp substation · PacifiCorp | Substation | 0.76 km | 345 kV | [5] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction startOct 1, 2023[1]
- First operationalDec 7, 2025[1]
- Expected completion—
- Buildings (planned)
Count of building outlines traced on satellite imagery.
- Buildings operational
| Phase | Status | Added MW | Completed / expected | Source |
|---|---|---|---|---|
| Buildings 1–2 | operational | 179 MW | Dec 7, 2025 | [1] |
Real estate
None sourced yet
None sourced yet
None sourced yet
- Capital cost / investment
Modeled total capital cost (2025 USD) of capacity currently operational, incl. compute hardware.
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Floor area
- Not yet sourced
Compute
What changed (last 3 years)
Follow this facility (RSS)Timeline
- Oct 1, 2023[1]
Land clearing begins.
- Sep 8, 2025[1]
We believe Buildings 1 and 2 are still undergoing testing due to construction equipment and unfinished land surrounding the data center sites, as well as color motion artifacts on a small number of the cooling fans.
Buildings 1 and 2 both estimated to be operational 90 days after testing was underway in September.
Satellite image shows strong evidence that Buildings 1 and 2 are operational: colored motion artifacts on many cooling fans, plus cars parked at the building entrances.
Buildings on this campus
5All claims (provenance audit)
35| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Meta Eagle Mountain | [1] | Likely | 2026-05-02 | Shown |
| Status | Under construction | [1] derived | Likely | 2023-10-01 | Superseded / alternative |
| Status | Under construction | [1] derived | Likely | 2025-09-08 | Superseded / alternative |
| Status | Operating + expanding | [1] derived | Likely | 2025-12-07 | Superseded / alternative |
| Status | Operating | [1] derived | Likely | 2026-05-02 | Shown |
| Facility type | AI campus | [1] derived | Likely | 2026-05-02 | Shown |
| Address | 1275 N Community Cir, Eagle Mountain, UT 84005 | [1] | Likely | 2026-05-02 | Shown |
| Owner | MetaOwner: Meta | [1] | Confirmed | 2026-05-02 | Shown |
| End users | MetaUsers: Meta | [1] | Confirmed | 2026-05-02 | Shown |
| Utility | PacifiCorpterritory 14354: PACIFICORP (INVESTOR OWNED, PACIFICORP) | [2] derived | Likely | 2022 | Shown |
| Energy partners | WilliamsEnergy companies: Williams | [1] | Confirmed | 2026-05-02 | Shown |
| Construction | MortensonConstruction companies: Mortenson | [1] | Confirmed | 2026-05-02 | Shown |
| Current facility power | 179 MW | [1] estimated | Likely | 2026-05-02 | Shown |
| Current facility power | 179 MW | [1] estimated | Likely | 2025-12-07 | Superseded / alternative |
| Current IT capacity | 133 MW | [1] estimated | Likely | 2026-05-02 | Shown |
| Current IT capacity | 133 MW | [1] estimated | Likely | 2025-12-07 | Superseded / alternative |
| Estimated annual consumption | 1,098 GWh/yr | [3] estimated | Speculative | 2026-09-29 | Shown |
| ISO / RTO | None (non-RTO region) | [4] derived | Likely | — | Shown |
| Balancing authority | PACW, PACE | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Unnamed substation (345 kV)way/1473440687 | [5] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.2 km | [5] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 345 kV | [5] derived | Likely | 2026-09-28 | Shown |
| State avg. industrial price | 9.10¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 10.85¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 1.72 GW | [7] derived | Confirmed | 202502 | Shown |
| Buildings (planned) | 2 | [1] derived | Likely | 2026-05-02 | Shown |
| Buildings operational | 2 | [1] estimated | Likely | 2026-05-02 | Shown |
| Buildings operational | 0 | [1] estimated | Likely | 2023-10-01 | Superseded / alternative |
| Buildings operational | 0 | [1] estimated | Likely | 2025-09-08 | Superseded / alternative |
| Buildings operational | 2 | [1] estimated | Likely | 2025-12-07 | Superseded / alternative |
| Capital cost / investment | $5B | [1] estimated | Likely | 2026-05-02 | Shown |
| Compute (H100-equivalents) | 151,400 | [1] estimated | Likely | 2026-05-02 | Shown |
| Chip types | B300 | [1] | Confirmed | 2026-05-02 | Shown |
| Construction start | Oct 1, 2023 | [1] derived | Likely | 2026-05-02 | Shown |
| First operational | Dec 7, 2025 | [1] derived | Likely | 2026-05-02 | Shown |