Data centers near Abilene, TX
Tracked data centers within 10, 25 or 50 miles of an address, ZIP code, city or county, with operators, tenants, power, the likely utility and recent changes, each linked to its sources. Addresses are geocoded on our server and are not stored or kept in the link.
2 tracked facilities within 10 miles. 2 disclose power, 590 MW online (a floor: most sites don't disclose). Statewide, 11% of Texas facilities have a power figure.
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. filing, deed, permit or grid recordAnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. company or press claimEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. satellite, model or map inferenceHow levels are assignedDownload CSVJSONAPI docs
Loading map…
- Crusoe Abilene Expansion3.7 miUnder constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.AI campus· Abilene, Taylor County, TX
- Operator
- Microsoft
- Tenants / users
- Microsoft
- Power online
- —
- Pipeline
- 941 MW planned EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Likely utility
- Taylor Electric Coop INC - (Tx) · ISO/RTO: ERCOT
- Nov 2, 2025EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Construction started: Land clearing begins for Buildings 1-2.
- OpenAI Stargate Abilene4.2 miOperating + expandingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.AI campus· Abilene, Taylor County, TX
- Operator
- Crusoe
- Tenants / users
- OpenAI, Oracle
- Power online
- 590 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Pipeline
- 1.18 GW planned EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Likely utility
- American Electric Power · ISO/RTO: ERCOT
- May 23, 2026EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current IT capacity: 211 MW → 421 MW
- May 23, 2026EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current facility power: 295 MW → 590 MW
- May 23, 2026EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 2 → 4