Data centers near Dickens County, TX

Tracked data centers within 10, 25 or 50 miles of an address, ZIP code, city or county, with operators, tenants, power, the likely utility and recent changes, each linked to its sources. Addresses are geocoded on our server and are not stored or kept in the link.

Radius:10 mi25 mi50 miLocation from the U.S. Census Gazetteer (centroid).

2 tracked facilities within 25 miles. 1 disclose power, 200 MW online (a floor: most sites don't disclose). Statewide, 12% of Texas facilities have a power figure.

ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. filing, deed, permit or grid recordAnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. company or press claimEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. satellite, model or map inferenceHow levels are assignedDownload CSVJSONAPI docs
Loading map…
  1. Operating + expandingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.AI campus· Afton, Dickens County, TX
    Operator
    Galaxy Digital Inc.
    Tenants / users
    OpenAI, CoreWeave
    Power online
    200 MW AnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record.
    Pipeline
    800 MW planned EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
    Likely utility
    South Plains Electric Coop INC · ISO/RTO: ERCOT
    • Aug 30, 2026EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 0 → 1
    • Aug 30, 2026EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Under construction → Operating + expanding
    • Aug 30, 2026EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 1 operational at full capacity. This is based on "Phase I", which is expected to be operational by the end of the first half of 2026. We added two months of overhead to account for remaining construction and/…
  2. OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Unclassified· Dickens County, TX
    Operator
    —
    Tenants / users
    —
    Power online
    —
    Pipeline
    —
    Likely utility
    South Plains Electric Coop INC · ISO/RTO: ERCOT