DC
/

Data centers near Monroe County, MI

Tracked data centers within 10, 25 or 50 miles of an address, ZIP code, city or county, with operators, tenants, power, the likely utility and recent changes, each linked to its sources. Addresses are geocoded on our server and are not stored or kept in the link.

Radius:10 mi25 mi50 miLocation from the U.S. Census Gazetteer (centroid).

3 tracked facilities within 25 miles. 1 disclose power (a floor: most sites don't disclose). Statewide, 8% of Michigan facilities have a power figure.

ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. filing, deed, permit or grid recordAnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. company or press claimEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. satellite, model or map inferenceHow levels are assignedDownload CSVJSONAPI docs
Loading map…
  1. OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Unclassified· Monroe County, MI
    Operator
    —
    Tenants / users
    —
    Power online
    —
    Pipeline
    —
    Likely utility
    Consumers Energy CO · ISO/RTO: MISO
  2. OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Unclassified· Wayne County, MI
    Operator
    US Signal
    Tenants / users
    —
    Power online
    —
    Pipeline
    —
    Likely utility
    DTE Electric · ISO/RTO: MISO
  3. Under constructionEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.AI campus· Washtenaw County, MI
    Operator
    Related Digital
    Tenants / users
    OpenAI
    Power online
    —
    Pipeline
    1.4 GW planned ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.
    Likely utility
    DTE Electric · ISO/RTO: MISO
    • Dec 4, 2025EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Construction started: Land clearing begins for the entire site