DC
/

Data centers near Whitfield County, GA

Tracked data centers within 10, 25 or 50 miles of an address, ZIP code, city or county, with operators, tenants, power, the likely utility and recent changes, each linked to its sources. Addresses are geocoded on our server and are not stored or kept in the link.

Radius:10 mi25 mi50 miLocation from the U.S. Census Gazetteer (centroid).

5 tracked facilities within 50 miles. 1 disclose power, 40 MW online (a floor: most sites don't disclose). Statewide, 7% of Georgia facilities have a power figure.

ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. filing, deed, permit or grid recordAnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. company or press claimEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. satellite, model or map inferenceHow levels are assignedDownload CSVJSONAPI docs
Loading map…
  1. OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.AI campus· Whitfield County, GA
    Operator
    CoreWeave
    Tenants / users
    OpenAI
    Power online
    40 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
    Pipeline
    —
    Likely utility
    Georgia Power · ISO/RTO: None (non-RTO region)
    • Feb 20, 2026EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 0 → 1
    • Feb 20, 2026EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Under construction → Operating
    • Feb 20, 2026EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 1 is operational, given it was announced completed 4 months ago and looks completed in satellite imagery. All cooling/mechanical rows are installed, with no obvious active building construction visible.
  2. OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Unclassified· Hamilton County, TN
    Operator
    —
    Tenants / users
    —
    Power online
    —
    Pipeline
    —
    Likely utility
    City of Chattanooga - (Tn) · ISO/RTO: None (non-RTO region)
  3. Google44.7 mi
    OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Hyperscale· Jackson County, AL
    Operator
    Google
    Tenants / users
    —
    Power online
    —
    Pipeline
    —
    Likely utility
    North Alabama Electric Coop · ISO/RTO: None (non-RTO region)
  4. Google44.8 mi
    OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Hyperscale· Jackson County, AL
    Operator
    Google
    Tenants / users
    —
    Power online
    —
    Pipeline
    —
    Likely utility
    North Alabama Electric Coop · ISO/RTO: None (non-RTO region)
  5. OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Hyperscale· Jackson County, AL
    Operator
    Google
    Tenants / users
    —
    Power online
    —
    Pipeline
    —
    Likely utility
    North Alabama Electric Coop · ISO/RTO: None (non-RTO region)