What changed — Oregon

RSS / Atom feed for this view

Capacity, status, permit, grid-request and construction changes over the last three years, each with its source. A change means the same source reported a new value later; two sources disagreeing is not a change. Subscribe to the feed in any RSS reader to follow a facility, state or company.

Clear
  1. Apr 29, 2026
    Google The Dalles · OR
    • Current IT capacity: 77 MW → 154 MW
    • Current facility power: 93 MW → 185 MW
    • Buildings operational: 1 → 2
    • Status: Operating + expanding → Operating
    • New capacity online: Building 2 is estimated to be operational, based on all external equipment being installed, and ordinary cars parked by the building.
    Source: Epoch AI
  2. Apr 17, 2026
    Meta-QTS Hillsboro 2 · OR
    • Status: Operating + expanding → Operating
    Source: Epoch AI
  3. Mar 7, 2025
    Google The Dalles · OR
    • Buildings operational: 0 → 1
    • Status: Under construction → Operating + expanding
    • New capacity online: Building 1 is estimated to be operational, based on all external equipment being installed.
    Source: Epoch AI
  4. Nov 8, 2024
    Meta-QTS Hillsboro 2 · OR
    • Current IT capacity: 45 MW → 180 MW
    • Current facility power: 61 MW → 243 MW
    • Buildings operational: 1 → 4
    • New capacity online: We believe Buildings 2, 3, and 4 are operational due to the absence of construction vehicles and completed parking lots/concrete around the facilities. There is also a vehicle presence in the parking lot similar to th…
    Source: Epoch AI