Linked facilities
1
States
1
Reported power online
—
Reported planned capacity
300 MW
Power totals sum only facilities with a reported or estimated figure, across all roles (a company can be tenant at one site and owner at another).
Loading map…
US footprint by state
- Texas1 sites
Relationship graph
Derived from the ownership → operation → tenancy → workload chain at each shared facility, plus company-to-company relationships extracted from cited documents. Speculative links are excluded.
Serves workloads of
- Anthropic1 site · ConfirmedAnthropic Barber Lake
Powered by
- Taylor Electric Coop INC - (Tx)1 site · UnverifiedAnthropic Barber Lake
| Facility | Role | Location | Status | Power |
|---|---|---|---|---|
| Anthropic Barber Lake | Owner | TX | Under construction | 300 MW planned |