Data centers in Whitfield County, Georgia
Datacenter Source tracks 1 data center in Whitfield County, Georgia. Facilities that disclose power add up to 40 MW online and 0 MW in the pipeline — floors, since 100% report a figure.
Follow
Get changes to Whitfield County, Georgia
Or subscribe in a feed reader: RSS / Atom
Facilities
1
Power online (floor)
40 MW
EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.100%
Pipeline (floor)
—
With a power figure
100%
0% with confirmed evidence
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. filing, deed, permit or grid recordAnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. company or press claimEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. satellite, model or map inferenceHow levels are assignedCounty facilities:Download CSVJSONAPI docs
Facilities
- CoreWeave Dalton 1 & 2 AI campusOperating40 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Interconnection-queue requests filed here (last two years)
Requests to connect generation or large loads, as the ISO/RTO publishes them. Filing is an application, not a commitment to build.
No dated queue filings for this county in the files we ingest (some ISOs don't publish a county or filing date).
Local impact
Water, on-site generation and air permits, incentives, regulatory events and large-load tariffs, where a source documents them. Counts are of sourced records, not of the state's totals.
Water & cooling
Not yet collected
On-site generation & air permits
Not yet collected
Incentives
Not yet collected
Utility & rates: large-load tariffs
- Georgia Power: Rules for serving large-load customers through customized contracts ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Georgia Public Service Commission · Jan 2025 · source
Regulatory events
Not yet collected
Recent changes
- Feb 20, 2026 · CoreWeave Dalton 1 & 2 EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Buildings operational: 0 → 1
- Feb 20, 2026 · CoreWeave Dalton 1 & 2 EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Status: Under construction → Operating
- Feb 20, 2026 · CoreWeave Dalton 1 & 2 EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. New capacity online: Building 1 is operational, given it was announced completed 4 months ago and looks completed in satellite imagery. All cooling/mechanical rows are installed, with no obvious active building construction visible.
- Jun 3, 2024 · CoreWeave Dalton 1 & 2 EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Construction started: According to a few sources, Core Scientific announced that they're rebuilding their existing Dalton 1 (and we're assuming 2) datacenter to run AI using CoreWeave's GPUs, of which contract was first signed on this date…