Data centers in Lancaster County, Nebraska
Datacenter Source tracks 1 data center in Lancaster County, Nebraska. Facilities that disclose power add up to 170 MW online and 169 MW in the pipeline — floors, since 100% report a figure. 4 interconnection-queue requests were filed in the county in the last two years.
Follow
Get changes to Lancaster County, Nebraska
Or subscribe in a feed reader: RSS / Atom
Facilities
- Google Lincoln AI campus · LincolnOperating + expanding170 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.+169 MW pipeline EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Interconnection-queue requests filed here (last two years)
Requests to connect generation or large loads, as the ISO/RTO publishes them. Filing is an application, not a commitment to build.
- Sep 15, 2025 · SPP ERAS-2025-001 Gas generation — ERAS-2025-001 at 84th & Bluff 115kV Substation104 MW · IA FULLY EXECUTED/ON SCHEDULE ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.source
- Oct 30, 2024 · SPP GEN-2024-021 Gas generation — GEN-2024-021 at Olive Creek 345 kV Substation540 MW · DISIS STAGE ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.source
- Oct 30, 2024 · SPP GEN-2024-020 Gas generation — GEN-2024-020 at Olive Creek 345 kV Substation390 MW · DISIS STAGE ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.source
- Oct 30, 2024 · SPP GEN-2024-017 Gas generation — GEN-2024-017 at Olive Creek 345 kV Substation62 MW · DISIS STAGE ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.source
Local impact
Water, on-site generation and air permits, incentives, regulatory events and large-load tariffs, where a source documents them. Counts are of sourced records, not of the state's totals.
Evaporative (cooling towers): 1 site EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Not yet collected
Not yet collected for this state's utilities.
Not yet collected
Recent changes
- May 12, 2026 · Google Lincoln EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Buildings operational: 0 → 1
- May 12, 2026 · Google Lincoln EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Status: Under construction → Operating + expanding
- May 12, 2026 · Google Lincoln EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. New capacity online: Building 1 operational. This is based on the fact that is no more visible equipment or construction around the building, and based on previous imagery and when construction started on the last pieces of equipment (fan…