Data centers in Washington County, Oregon
Datacenter Source tracks 37 data centers in Washington County, Oregon. Facilities that disclose power add up to 243 MW online and 0 MW in the pipeline — floors, since 14% report a figure.
Follow
Get changes to Washington County, Oregon
Or subscribe in a feed reader: RSS / Atom
Facilities
- Meta-QTS Hillsboro 2 AI campus · HillsboroOperating243 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Adobe Data Center Unclassified · HillsboroOperating
- Aligned DC - PDX-01 Colocation · HillsboroOperating
- Crane DC - Portland Unclassified · Forest GroveOperating
- Data Center UnclassifiedOperating
- Digital Fortress - Portland 2 Colocation · BeavertonOperating
- Digital Fortress - Portland 3 Colocation · BeavertonOperating
- Digital Realty PDX10 Data Center Colocation · HillsboroOperating
- Digital Realty PDX11 Data Center Colocation · HillsboroOperating
- Digital Realty PDX11 Data Center Colocation · HillsboroOperating
- EdgeConneX - Portland Colocation · HillsboroOperating
- Flexential Portland - Hillsboro 1 Colocation · HillsboroOperating
- Flexential Portland - Hillsboro 1 Colocation · HillsboroOperating
- Flexential Portland - Hillsboro 2 Colocation · HillsboroOperating
- Flexential Portland - Hillsboro 3 Colocation · HillsboroOperating
- Flexential Portland - Hillsboro 4 Colocation · HillsboroOperating
- Flexential Portland - Hillsboro 4 Expansion Colocation · HillsboroOperating
- Flexential Portland - Hillsboro 5 Colocation · HillsboroOperating
- NTT RagingWire DC - Hillsboro Colocation · HillsboroOperating
- NTT RagingWire DC - Hillsboro Colocation · HillsboroOperating
- Oracle Unclassified · HillsboroOperating
- OVHcloud - Hillsboro Unclassified · HillsboroOperating
- QTS Data Center - Hillsboro 1 Colocation · HillsboroOperating
- QTS Data Center - Hillsboro 2 Colocation · HillsboroOperating
- QTS Data Center - Hillsboro 2 Colocation · HillsboroOperating
- QTS Data Center - Hillsboro 2 Colocation · HillsboroOperating
- QTS Data Center - Hillsboro 2 Colocation · HillsboroOperating
- QTS Data Center - Hillsboro 3 Colocation · HillsboroOperating
- QTS Data Center - Hillsboro 3 Colocation · HillsboroOperating
- Stack Infrastructure - POR01 Colocation · HillsboroOperating
- Stack Infrastructure - POR02 Colocation · HillsboroOperating
- Stack Infrastructure - POR03 Colocation · HillsboroOperating
- Stack Infrastructure - POR03 Colocation · HillsboroOperating
- Stack Infrastructure - POR03 Colocation · HillsboroOperating
- Stack Infrastructure - POR03 Colocation · HillsboroUnder construction
- TGN Hillsboro Enterprise · HillsboroOperating
- Verizon Hillsboro (Tanasbourne) Data Center Enterprise · HillsboroOperating
Interconnection-queue requests filed here (last two years)
Requests to connect generation or large loads, as the ISO/RTO publishes them. Filing is an application, not a commitment to build.
No dated queue filings for this county in the files we ingest (some ISOs don't publish a county or filing date).
Local impact
Water, on-site generation and air permits, incentives, regulatory events and large-load tariffs, where a source documents them. Counts are of sourced records, not of the state's totals.
Not yet collected
18 sites with documented on-site generation (MW not reported)
Not yet collected
Not yet collected for this state's utilities.
Not yet collected
Recent changes
- Apr 17, 2026 · Meta-QTS Hillsboro 2 EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Status: Operating + expanding → Operating
- Nov 8, 2024 · Meta-QTS Hillsboro 2 EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Current IT capacity: 45 MW → 180 MW
- Nov 8, 2024 · Meta-QTS Hillsboro 2 EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Current facility power: 61 MW → 243 MW
- Nov 8, 2024 · Meta-QTS Hillsboro 2 EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Buildings operational: 1 → 4
- Nov 8, 2024 · Meta-QTS Hillsboro 2 EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. New capacity online: We believe Buildings 2, 3, and 4 are operational due to the absence of construction vehicles and completed parking lots/concrete around the facilities. There is also a vehicle presence in the parking lot similar to th…