Data centers in Shelby County, Tennessee
Datacenter Source tracks 4 data centers in Shelby County, Tennessee. Facilities that disclose power add up to 1.7 GW online and 789 MW in the pipeline — floors, since 50% report a figure.
Follow
Get changes to Shelby County, Tennessee
Or subscribe in a feed reader: RSS / Atom
Facilities
- Colossus 2 AI campus · MemphisOperating + expanding1.28 GW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.+789 MW pipeline EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Colossus 1 AI campus · MemphisOperating425 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- xAI Colossus AI campus · MemphisOperating
- xAI Macrohard Colossus 2 AI campus · MemphisOperating
Interconnection-queue requests filed here (last two years)
Requests to connect generation or large loads, as the ISO/RTO publishes them. Filing is an application, not a commitment to build.
No dated queue filings for this county in the files we ingest (some ISOs don't publish a county or filing date).
Local impact
Water, on-site generation and air permits, incentives, regulatory events and large-load tariffs, where a source documents them. Counts are of sourced records, not of the state's totals.
Air-cooled (chillers / dry coolers): 2 sites EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Evaporative (cooling towers): 1 site EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
3 sites with documented on-site generation (MW not reported)
Not yet collected
Not yet collected for this state's utilities.
Not yet collected
Recent changes
- Jun 15, 2026 · Colossus 2 EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Current IT capacity: 490 MW → 946 MW
- Jun 15, 2026 · Colossus 2 EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Current facility power: 661 MW → 1.28 GW
- Jun 15, 2026 · Colossus 2 EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Buildings operational: 1 → 2
- Jun 15, 2026 · Colossus 2 EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. New capacity online: The site is estimated to have at least ~830 MW of GPU server power, with at least "at least 220,000 additional GB300 processors and over 400 additional megawatts of compute power", corresponding to the "next phase of …
- Jun 15, 2026 · Colossus 1 EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Status: Operating + expanding → Operating
- Apr 6, 2026 · Colossus 2 EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Current IT capacity: 239 MW → 490 MW
- Apr 6, 2026 · Colossus 2 EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Current facility power: 323 MW → 661 MW
- Feb 11, 2026 · Colossus 1 EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Current facility power: 442 MW → 425 MW
- Nov 7, 2025 · Colossus 1 EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Current IT capacity: 268 MW → 340 MW
- Nov 7, 2025 · Colossus 1 EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Current facility power: 348 MW → 442 MW
- Oct 19, 2025 · Colossus 2 EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Buildings operational: 0 → 1
- Oct 19, 2025 · Colossus 2 EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Status: Under construction → Operating + expanding