Data centers in Ellis County, Texas
Datacenter Source tracks 17 data centers in Ellis County, Texas. Facilities that disclose power add up to 216 MW online and 92 MW in the pipeline — floors, since 12% report a figure.
Follow
Get changes to Ellis County, Texas
Or subscribe in a feed reader: RSS / Atom
Facilities
- Google Red Oak AI campus · Red OakOperating + expanding93 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.+92 MW pipeline EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Google Midlothian AI campus · MidlothianOperating123 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Compass Data Center Unclassified · Red OakOperating
- Compass Data Center UnclassifiedOperating
- Compass Data Center UnclassifiedOperating
- Compass Data Center UnclassifiedOperating
- Compass Data Center UnclassifiedOperating
- Compass Data Center UnclassifiedOperating
- Compass Data Center UnclassifiedOperating
- Compass Data Center UnclassifiedOperating
- Compass Data Center UnclassifiedOperating
- Compass Data Center UnclassifiedOperating
- Compass Data Center UnclassifiedOperating
- Google HyperscaleOperating
- Google HyperscaleOperating
- Google HyperscaleOperating
- Google HyperscaleOperating
Interconnection-queue requests filed here (last two years)
Requests to connect generation or large loads, as the ISO/RTO publishes them. Filing is an application, not a commitment to build.
No dated queue filings for this county in the files we ingest (some ISOs don't publish a county or filing date).
Local impact
Water, on-site generation and air permits, incentives, regulatory events and large-load tariffs, where a source documents them. Counts are of sourced records, not of the state's totals.
Evaporative (cooling towers): 1 site EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Air-cooled (chillers / dry coolers): 1 site EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
3 sites with documented on-site generation (MW not reported)
Not yet collected
Not yet collected for this state's utilities.
Not yet collected
Recent changes
- Jul 1, 2026 · Google Midlothian EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Current IT capacity: 69 MW → 103 MW
- Jul 1, 2026 · Google Midlothian EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Current facility power: 82 MW → 123 MW
- Jul 1, 2026 · Google Midlothian EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Status: Operating + expanding → Operating
- Apr 19, 2026 · Google Midlothian EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Buildings operational: 0 → 1
- Apr 19, 2026 · Google Midlothian EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Status: Under construction → Operating + expanding
- Apr 19, 2026 · Google Midlothian EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. New capacity online: Building 1 is probably mostly operational despite some cooling towers yet to be installed. In the original building permit Google only expected to build 6 new cooling towers, but they've extended the row further. This…
- Aug 25, 2025 · Google Red Oak EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Buildings operational: 0 → 1
- Aug 25, 2025 · Google Red Oak EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Status: Under construction → Operating + expanding
- Aug 25, 2025 · Google Red Oak EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. New capacity online: Building 1 is operational, based on a Google Earth image showing a completed building shell and equipment, and the large construction car park being emptied. Building 2 shell looks mostly completed.
- Nov 28, 2023 · Google Midlothian EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Construction started: Visible land clearing around the area for Building 1