Amazon Ridgeland

Operating + expandingAI campusCampusMadison County, Mississippi
80% profile completeness
34 claims from 12 sources
Current facility power
273 MW[1]
Likelyestimated
Planned capacity
1.01 GW[1]
Likelyestimated
Floor area
Not yet sourced
Buildings (planned)
Likelyderived
Capital cost / investment
$8.6B[1]
Likelyestimated
First operational
May 15, 2026[1]
Likelyderived

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Remaining capacity: H1 2027 – H2 2028
Medium confidencewindow, not a prediction
Project verification
Verified operating
Operation documented by satellite imagery.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Entergy · MISO
Substation: On-site substation

Power reality

Announced
1.01 GW[1]
Research estimate of planned capacity (no company figure found)
Interconnection request
No record
Contracted / approved
No record
Under construction
735 MW[1]
Building 5, Buildings 6–14 under construction (satellite-tracked phases)
Operational
273 MW[1]
Estimated from buildings observed operational
  • ⚠ No public interconnection record for this load — MISO does not publish large-load requests.
  • ⚠ No permit record linked to this site yet.
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.
How the time-to-power window was estimated
Evidence used
  • Current stage: Operational (furthest stage with documented evidence)[1]
  • Stated date: Next projected milestone: 2027-02-09 (modeled/speculative)[1]
  • Required: 1.01 GW
Assumptions
  • From “Under construction”, large loads have typically taken 0.5–2 more years to first power (editorial range; see Methodology).
  • The window is a range of plausible outcomes under these assumptions, not a forecast. It moves as new filings, queue updates or imagery arrive.
Window: H1 2027 – H2 2028

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionFeb 24, 2024
    Model estimate · Satellite imagery
    • Feb 24, 2024 · Reported status: under construction[1]
    • Feb 24, 2024 · Construction start[1]
    • Feb 24, 2024 · Land clearing begins[1]
    • May 15, 2026 · Reported status: expanding[1]
  3. EnergizationMay 15, 2026
    Satellite imagery
    • May 15, 2026 · Buildings 1-4 are operational, based on the buildings shells and backup generators and most of the landscaping looking complete. Building 5 roof is complete but still lacks cooling[1]
  4. OperationalMay 15, 2026
    Satellite imagery
    • May 15, 2026 · Buildings 1-4 are operational, based on the buildings shells and backup generators and most of the landscaping looking complete. Building 5 roof is complete but still lacks cooling[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Model estimate, Satellite imagery.

Grid path

  1. facility
    Amazon Ridgeland
  2. substation
    On-site substation[1][5]
    Satellite imageryLikely
    1 substation outline traced inside the campus on satellite imagery; OSM maps Unnamed substation 0.42 km away
  3. transmission
    230 kV line[5]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.47 km away). Not confirmed as the supply path.
  4. utility
    Entergy[1]
    DocumentedConfirmed
    Named in a source
  5. ISO / RTO
    MISO[3]
    Service territoryLikely
    Balancing authority: MISO
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

Mapped outline
Coordinates
32.41151, -90.19026
Address
1626 County Line Road Ridgeland, Mississippi[1]Likely
County
Madison County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Anthropic[1]Speculative
Power supply
Utility:

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
End user
Anthropic[1]Speculative
Utility
Entergy[1]Confirmed

Power (all fields)

Current facility power
273 MW[1]Likelyestimated

Estimated total facility power (IT plus cooling and overhead) at the latest observed milestone.

Current IT capacity
228 MW[1]Likelyestimated

Estimated IT load currently online, based on buildings observed operational.

Planned capacity
1.01 GW[1]Likelyestimated

Projected facility power at the last tracked milestone (2028-09-29); not necessarily full build-out.

Estimated annual consumption
1,674 GWh/yr[2]Speculativeestimated

273 MW × 8,760 h × 70% utilization.

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
MISO[3]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
MISO[4]Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Unnamed substation[5]Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.4 km[5]Likelyderived
Highest-voltage line nearby
230 kV[5]Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
7.66¢/kWh[7]Confirmed

Mississippi statewide average, July 2026.

State avg. commercial price
13.65¢/kWh[7]Confirmed

Mississippi statewide average, July 2026.

Generation within 50 km
753 MW[8]Confirmedderived

5 EIA-reported plants within 50 km.

Generation queued in county
877 MW[6]Confirmedderived

6 active generation interconnection requests in Madison County: Solar 407 MW, Storage 300 MW, Hybrid 170 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
230 kV line · Entergy MississippiTransmission line0.47 km230 kV[5]
Hinds Energy Facility · Entergy Mississippi LLCPower plant (Natural Gas)4.6 km473 MW[8]
Mississippi Baptist Medical Center · Mississippi Baptist MedicalPower plant (Natural Gas)11 km4 MW[8]
Lineage Ms · Madison Energy Holdings LLCPower plant (Solar)17.8 km1 MW[8]
Ragsdale Solar LLC · Ragsdale Solar, LLCPower plant (Solar)23 km100 MW[8]
Pearl River Solar Park LLC · Pearl River Solar Park, LLCPower plant (Solar)45.9 km175 MW[8]
Unnamed substationSubstation0.42 km—[5]
Unnamed substationSubstation1.41 km115 kV[5]
Largest queued generation in this countyFuelQueue statusMWSource
J4154 at Andes SubstationMISO J4154StorageIn study · proposed 2028-08200 MW[6]
J3049 at LAKEOVER EHV - MCADAMS EHV 500.0kVMISO J3049SolarIn study · proposed 2024-12188 MW[6]
J3764 at Andes Substation 230 kVMISO J3764HybridIn study · proposed 2028-03170 MW[6]
J3053 at LAKEOVER EHV - MCADAMS EHV 500.0kVMISO J3053SolarIn study · proposed 2024-12169 MW[6]
J3093 at LAKEOVER EHV - MCADAMS EHV 500.0kVMISO J3093StorageIn study · proposed 2024-12100 MW[6]
J1747 at J830 POIMISO J1747SolarUnder construction · proposed 2022-0250 MW[6]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    Feb 24, 2024[1]
  5. First operational
    May 15, 2026[1]
  6. Expected completion
    Sep 29, 2028[1]
    Projected
Planned capacity
1.01 GW[1]Likelyestimated

Projected facility power at the last tracked milestone (2028-09-29); not necessarily full build-out.

Buildings (planned)
5[1]Likelyderived

Count of building outlines traced on satellite imagery.

Buildings operational
4[1]Likelyestimated
PhaseStatusAdded MWCompleted / expectedSource
Buildings 1–4operational273 MWMay 15, 2026[1]
Building 5under construction68 MWFeb 9, 2027 (projected)[1]
Buildings 6–14under construction667 MWSep 29, 2028 (projected)[1]

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Capital cost / investment
$8.6B[1]Likelyestimated

Modeled total capital cost (2025 USD) of capacity currently operational, incl. compute hardware.

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

Compute

Project
Project Rainier[1]Speculative
Chip types
Trainium2, Trainium3[1]Confirmed
Compute (H100-equivalents)
171,300[1]Likelyestimated

What changed (last 3 years)

Follow this facility (RSS)
  • Buildings operational
    0Feb 24, 2024[1]→4May 15, 2026[1]
  • Status
    Under constructionFeb 24, 2024[1]→Operating + expandingMay 15, 2026[1]

Timeline

Construction start: Feb 24, 2024[1]
First operational: May 15, 2026[1]
  1. Feb 24, 2024[1]

    Land clearing begins

  2. Oct 4, 2025[1]

    Roof complete on Buildings 3

  3. May 15, 2026273 MW facility power· 4 buildings operational[1]

    Buildings 1-4 are operational, based on the buildings shells and backup generators and most of the landscaping looking complete. Building 5 roof is complete but still lacks cooling equipment.

  4. Feb 9, 2027Projected341 MW facility power· 5 buildings operational[1]

    Building 5 is operational (estimate).

  5. Sep 29, 2028Projected1.01 GW facility power· 14 buildings operational[1]

    Buildings 6-14 are operational (estimate). Buildings 1-4 took an estimated 2.25 years on this site. We assume Buildings 6-14 get underway by July 2026, and take the same time as Buildings 1-4. This is later than the expected completion by 2027.

Buildings on this campus

4

All claims (provenance audit)

34
FieldValueSourceConfidenceAs ofStatus
NameAmazon Ridgeland[1] Likely2026-05-15Shown
StatusUnder construction[1] derivedLikely2024-02-24Superseded / alternative
StatusUnder construction[1] derivedLikely2025-10-04Superseded / alternative
StatusOperating + expanding[1] derivedLikely2026-05-15Shown
Facility typeAI campus[1] derivedLikely2026-05-15Shown
ProjectProject Rainier[1] Speculative2026-05-15Shown
Address1626 County Line Road Ridgeland, Mississippi[1] Likely2026-05-15Shown
OwnerAmazon Web ServicesOwner: Amazon[1] Confirmed2026-05-15Shown
End usersAnthropicUsers: Anthropic[1] Speculative2026-05-15Shown
UtilityEntergyEnergy companies: Entergy[1] Confirmed2026-05-15Shown
Current facility power273 MW[1] estimatedLikely2026-05-15Shown
Current IT capacity228 MW[1] estimatedLikely2026-05-15Shown
Planned capacity1.01 GW[1] estimatedLikely2026-05-15Shown
Estimated annual consumption1,674 GWh/yr[2] estimatedSpeculative2026-09-29Shown
ISO / RTOMISOMIDCONTINENT INDEPENDENT TRANSMISSION SYSTEM OPERATOR, INC..[3] derivedLikely—Shown
Balancing authorityMISO[4] derivedLikely—Shown
Nearest mapped substationUnnamed substationway/1541194577[5] derivedLikely2026-09-28Shown
Distance to substation0.4 km[5] derivedLikely2026-09-28Shown
Highest-voltage line nearby230 kV[5] derivedLikely2026-09-28Shown
Generation queued in county877 MW[6] derivedConfirmed2026-09-27Shown
State avg. industrial price7.66¢/kWh[7] Confirmed2026-07Shown
State avg. commercial price13.65¢/kWh[7] Confirmed2026-07Shown
Generation within 50 km753 MW[8] derivedConfirmed202502Shown
Buildings (planned)5[1] derivedLikely2026-05-15Shown
Buildings operational4[1] estimatedLikely2026-05-15Shown
Buildings operational0[1] estimatedLikely2024-02-24Superseded / alternative
Buildings operational0[1] estimatedLikely2025-10-04Superseded / alternative
Capital cost / investment$8.6B[1] estimatedLikely2026-05-15Shown
Compute (H100-equivalents)171,300[1] estimatedLikely2026-05-15Shown
Chip typesTrainium2[1] Confirmed2026-05-15Shown
Chip typesTrainium3[1] Confirmed2026-05-15Shown
Construction startFeb 24, 2024[1] derivedLikely2026-05-15Shown
First operationalMay 15, 2026[1] derivedLikely2026-05-15Shown
Expected completionSep 29, 2028[1] estimatedSpeculative2026-05-15Shown