Amazon Ridgeland
POWER & GRID
Time-to-power · verification · interconnectionPower reality
- ⚠ No public interconnection record for this load — MISO does not publish large-load requests.
- ⚠ No permit record linked to this site yet.
How the time-to-power window was estimated
- From “Under construction”, large loads have typically taken 0.5–2 more years to first power (editorial range; see Methodology).
- The window is a range of plausible outcomes under these assumptions, not a forecast. It moves as new filings, queue updates or imagery arrive.
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- EnergizationMay 15, 2026
Satellite imagery
- May 15, 2026 · Buildings 1-4 are operational, based on the buildings shells and backup generators and most of the landscaping looking complete. Building 5 roof is complete but still lacks cooling[1]
- OperationalMay 15, 2026
Satellite imagery
- May 15, 2026 · Buildings 1-4 are operational, based on the buildings shells and backup generators and most of the landscaping looking complete. Building 5 roof is complete but still lacks cooling[1]
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Model estimate, Satellite imagery.
Grid path
- →facilityAmazon Ridgeland
- →substationSatellite imageryLikely1 substation outline traced inside the campus on satellite imagery; OSM maps Unnamed substation 0.42 km away
- →transmission230 kV line[5]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.47 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 32.41151, -90.19026
- Address
- County
- Madison County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developer
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workload
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
Power (all fields)
- Current facility power
Estimated total facility power (IT plus cooling and overhead) at the latest observed milestone.
- Current IT capacity
Estimated IT load currently online, based on buildings observed operational.
- Planned capacity
Projected facility power at the last tracked milestone (2028-09-29); not necessarily full build-out.
- Estimated annual consumption
273 MW × 8,760 h × 70% utilization.
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Mississippi statewide average, July 2026.
- State avg. commercial price
Mississippi statewide average, July 2026.
- Generation within 50 km
5 EIA-reported plants within 50 km.
- Generation queued in county
6 active generation interconnection requests in Madison County: Solar 407 MW, Storage 300 MW, Hybrid 170 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 230 kV line · Entergy Mississippi | Transmission line | 0.47 km | 230 kV | [5] |
| Hinds Energy Facility · Entergy Mississippi LLC | Power plant (Natural Gas) | 4.6 km | 473 MW | [8] |
| Mississippi Baptist Medical Center · Mississippi Baptist Medical | Power plant (Natural Gas) | 11 km | 4 MW | [8] |
| Lineage Ms · Madison Energy Holdings LLC | Power plant (Solar) | 17.8 km | 1 MW | [8] |
| Ragsdale Solar LLC · Ragsdale Solar, LLC | Power plant (Solar) | 23 km | 100 MW | [8] |
| Pearl River Solar Park LLC · Pearl River Solar Park, LLC | Power plant (Solar) | 45.9 km | 175 MW | [8] |
| Unnamed substation | Substation | 0.42 km | — | [5] |
| Unnamed substation | Substation | 1.41 km | 115 kV | [5] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| J4154 at Andes SubstationMISO J4154 | Storage | In study · proposed 2028-08 | 200 MW | [6] |
| J3049 at LAKEOVER EHV - MCADAMS EHV 500.0kVMISO J3049 | Solar | In study · proposed 2024-12 | 188 MW | [6] |
| J3764 at Andes Substation 230 kVMISO J3764 | Hybrid | In study · proposed 2028-03 | 170 MW | [6] |
| J3053 at LAKEOVER EHV - MCADAMS EHV 500.0kVMISO J3053 | Solar | In study · proposed 2024-12 | 169 MW | [6] |
| J3093 at LAKEOVER EHV - MCADAMS EHV 500.0kVMISO J3093 | Storage | In study · proposed 2024-12 | 100 MW | [6] |
| J1747 at J830 POIMISO J1747 | Solar | Under construction · proposed 2022-02 | 50 MW | [6] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction startFeb 24, 2024[1]
- First operationalMay 15, 2026[1]
- Expected completionSep 29, 2028[1]Projected
- Planned capacity
Projected facility power at the last tracked milestone (2028-09-29); not necessarily full build-out.
- Buildings (planned)
Count of building outlines traced on satellite imagery.
- Buildings operational
Real estate
None sourced yet
None sourced yet
None sourced yet
- Capital cost / investment
Modeled total capital cost (2025 USD) of capacity currently operational, incl. compute hardware.
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Floor area
- Not yet sourced
Compute
What changed (last 3 years)
Follow this facility (RSS)Timeline
- Feb 24, 2024[1]
Land clearing begins
- Oct 4, 2025[1]
Roof complete on Buildings 3
Buildings 1-4 are operational, based on the buildings shells and backup generators and most of the landscaping looking complete. Building 5 roof is complete but still lacks cooling equipment.
Building 5 is operational (estimate).
Buildings 6-14 are operational (estimate). Buildings 1-4 took an estimated 2.25 years on this site. We assume Buildings 6-14 get underway by July 2026, and take the same time as Buildings 1-4. This is later than the expected completion by 2027.
Buildings on this campus
4- Amazon Web ServicesOperating · 217,900 sq ft footprint
- Amazon Web ServicesOperating · 218,500 sq ft footprint
- Amazon Web ServicesOperating · 215,500 sq ft footprint
- Amazon Web ServicesOperating · 214,700 sq ft footprint
All claims (provenance audit)
34| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Amazon Ridgeland | [1] | Likely | 2026-05-15 | Shown |
| Status | Under construction | [1] derived | Likely | 2024-02-24 | Superseded / alternative |
| Status | Under construction | [1] derived | Likely | 2025-10-04 | Superseded / alternative |
| Status | Operating + expanding | [1] derived | Likely | 2026-05-15 | Shown |
| Facility type | AI campus | [1] derived | Likely | 2026-05-15 | Shown |
| Project | Project Rainier | [1] | Speculative | 2026-05-15 | Shown |
| Address | 1626 County Line Road Ridgeland, Mississippi | [1] | Likely | 2026-05-15 | Shown |
| Owner | Amazon Web ServicesOwner: Amazon | [1] | Confirmed | 2026-05-15 | Shown |
| End users | AnthropicUsers: Anthropic | [1] | Speculative | 2026-05-15 | Shown |
| Utility | EntergyEnergy companies: Entergy | [1] | Confirmed | 2026-05-15 | Shown |
| Current facility power | 273 MW | [1] estimated | Likely | 2026-05-15 | Shown |
| Current IT capacity | 228 MW | [1] estimated | Likely | 2026-05-15 | Shown |
| Planned capacity | 1.01 GW | [1] estimated | Likely | 2026-05-15 | Shown |
| Estimated annual consumption | 1,674 GWh/yr | [2] estimated | Speculative | 2026-09-29 | Shown |
| ISO / RTO | MISOMIDCONTINENT INDEPENDENT TRANSMISSION SYSTEM OPERATOR, INC.. | [3] derived | Likely | — | Shown |
| Balancing authority | MISO | [4] derived | Likely | — | Shown |
| Nearest mapped substation | Unnamed substationway/1541194577 | [5] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.4 km | [5] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 230 kV | [5] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 877 MW | [6] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 7.66¢/kWh | [7] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 13.65¢/kWh | [7] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 753 MW | [8] derived | Confirmed | 202502 | Shown |
| Buildings (planned) | 5 | [1] derived | Likely | 2026-05-15 | Shown |
| Buildings operational | 4 | [1] estimated | Likely | 2026-05-15 | Shown |
| Buildings operational | 0 | [1] estimated | Likely | 2024-02-24 | Superseded / alternative |
| Buildings operational | 0 | [1] estimated | Likely | 2025-10-04 | Superseded / alternative |
| Capital cost / investment | $8.6B | [1] estimated | Likely | 2026-05-15 | Shown |
| Compute (H100-equivalents) | 171,300 | [1] estimated | Likely | 2026-05-15 | Shown |
| Chip types | Trainium2 | [1] | Confirmed | 2026-05-15 | Shown |
| Chip types | Trainium3 | [1] | Confirmed | 2026-05-15 | Shown |
| Construction start | Feb 24, 2024 | [1] derived | Likely | 2026-05-15 | Shown |
| First operational | May 15, 2026 | [1] derived | Likely | 2026-05-15 | Shown |
| Expected completion | Sep 29, 2028 | [1] estimated | Speculative | 2026-05-15 | Shown |