POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityAmazon Web Services
- →substationUnnamed substation[1]Proximity onlyUnverifiedNearest mapped substation, 0.39 km away. Proximity does not establish that it serves the site.
- →transmission230 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.53 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 32.41197, -90.18796
- County
- Madison County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Operator
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Mississippi statewide average, July 2026.
- State avg. commercial price
Mississippi statewide average, July 2026.
- Generation within 50 km
5 EIA-reported plants within 50 km.
- Generation queued in county
6 active generation interconnection requests in Madison County: Solar 407 MW, Storage 300 MW, Hybrid 170 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 230 kV line · Entergy Mississippi | Transmission line | 0.53 km | 230 kV | [1] |
| Hinds Energy Facility · Entergy Mississippi LLC | Power plant (Natural Gas) | 4.7 km | 473 MW | [6] |
| Mississippi Baptist Medical Center · Mississippi Baptist Medical | Power plant (Natural Gas) | 11 km | 4 MW | [6] |
| Lineage Ms · Madison Energy Holdings LLC | Power plant (Solar) | 17.8 km | 1 MW | [6] |
| Ragsdale Solar LLC · Ragsdale Solar, LLC | Power plant (Solar) | 22.8 km | 100 MW | [6] |
| Pearl River Solar Park LLC · Pearl River Solar Park, LLC | Power plant (Solar) | 45.6 km | 175 MW | [6] |
| Unnamed substation | Substation | 0.39 km | — | [1] |
| Unnamed substation | Substation | 1.63 km | 115 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| J4154 at Andes SubstationMISO J4154 | Storage | In study · proposed 2028-08 | 200 MW | [4] |
| J3049 at LAKEOVER EHV - MCADAMS EHV 500.0kVMISO J3049 | Solar | In study · proposed 2024-12 | 188 MW | [4] |
| J3764 at Andes Substation 230 kVMISO J3764 | Hybrid | In study · proposed 2028-03 | 170 MW | [4] |
| J3053 at LAKEOVER EHV - MCADAMS EHV 500.0kVMISO J3053 | Solar | In study · proposed 2024-12 | 169 MW | [4] |
| J3093 at LAKEOVER EHV - MCADAMS EHV 500.0kVMISO J3093 | Storage | In study · proposed 2024-12 | 100 MW | [4] |
| J1747 at J830 POIMISO J1747 | Solar | Under construction · proposed 2022-02 | 50 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
Other buildings on this campus
4- Amazon RidgelandOperating + expanding
- Amazon Web ServicesOperating · 218,500 sq ft footprint
- Amazon Web ServicesOperating · 215,500 sq ft footprint
- Amazon Web ServicesOperating · 214,700 sq ft footprint
All claims (provenance audit)
15| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Amazon Web Servicesway/1510517631 name=Amazon Web Services | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Facility type | Hyperscale | [1] derived | Unverified | 2026-09-27 | Shown |
| Operator | Amazon Web Servicesoperator=Amazon Web Services | [1] | Likely | 2026-09-27 | Shown |
| Utility | Entergyterritory 12685: ENTERGY MISSISSIPPI LLC (INVESTOR OWNED, ENTERGY CORP) | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | MISOMIDCONTINENT INDEPENDENT TRANSMISSION SYSTEM OPERATOR, INC.. | [3] derived | Likely | — | Shown |
| Balancing authority | MISO | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Unnamed substationway/1541194577 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.4 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 230 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 877 MW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 7.66¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 13.65¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 753 MW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 217,900 sq ft | [1] derived | Likely | 2026-09-27 | Shown |