DC
/

Amazon Web Services

OperatingHyperscaleBuildingLicking County, Ohio

Part of AWS New Albany

20% profile completeness
21 claims from 7 sources
Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Building footprint
213,800 sq ft[1]
Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Energized — operating
High confidence
Project verification
Verified operating
Operation documented by government record.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
American Electric Power · PJM
Substation: Unnamed substation (138 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredDec 21, 2023
    Government record
    • Dec 21, 2023 · Land acquisition / deed recorded[2]
    • Dec 21, 2023 · Deed/transfer recorded for parcel 095-111618-04.000 (no sale price disclosed).[2]
    • Sep 27, 2026 · Owner of record in county parcel data[2]
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalSep 27, 2026
    Community map · Government record
    • Sep 27, 2026 · Reported status: operating[1]
    • Sep 27, 2026 · County land use: 305: Research/Chemical Labs[2]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Government record, Community map.

Grid path

  1. facility
    Amazon Web Services
  2. substation
    Unnamed substation (138 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.3 km away. Proximity does not establish that it serves the site.
  3. transmission
    Jug Street - Corridor 345kV transmission line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.1 km away). Not confirmed as the supply path.
  4. utility
    American Electric Power[3]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    PJM[4]
    Service territoryLikely
    Balancing authority: PJM
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

Mapped outline
Coordinates
40.10243, -82.75011
County
Licking County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply
Utility:

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Property owner of record
Utility

Most likely retail provider among 3 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Ohio Edison CO, Licking Rural Electric INC.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
PJM[4]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
PJM[3]Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Unnamed substation (138 kV)[1]Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.3 km[1]Likelyderived
Highest-voltage line nearby
345 kV[1]Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
10.95¢/kWh[6]Confirmed

Ohio statewide average, July 2026.

State avg. commercial price
14.06¢/kWh[6]Confirmed

Ohio statewide average, July 2026.

Generation within 50 km
21 MW[7]Confirmedderived

8 EIA-reported plants within 50 km.

Generation queued in county
2.52 GW[5]Confirmedderived

14 active generation interconnection requests in Licking County: Solar 1,773 MW, Storage 750 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
Jug Street - Corridor 345kV transmission line · American Electric PowerTransmission line0.1 km345 kV[1]
138 kV lineTransmission line0.1 km138 kV[1]
Jug Street - Corridor · American Electric PowerTransmission line0.11 km345 kV[1]
345 kV line · American Electric PowerTransmission line0.7 km345 kV[1]
Jug Street - Kirk 345kV transmission line · American Electric PowerTransmission line0.73 km345 kV[1]
Conesville - Corridor 345kV transmission line · American Electric PowerTransmission line0.99 km345 kV[1]
Denison Solar Array · AEP Onsite Partners, LLCPower plant (Solar)20 km2 MW[7]
Dodge Park Engine No 1 · City of Columbus - (OH)Power plant (Petroleum)28 km2 MW[7]
St-1/1a Engine No 1 · City of Columbus - (OH)Power plant (Petroleum)28.3 km1 MW[7]
3100 Valleyview Drive · Madison Energy Investments LLCPower plant (Solar)28.7 km1 MW[7]
Renick Run Pumping Station 03-04 · City of Columbus - (OH)Power plant (Petroleum)29.5 km2 MW[7]
Ps St-8 Engine No 1 · City of Columbus - (OH)Power plant (Petroleum)29.9 km2 MW[7]
O'Shaughnessy Hydro · City of Columbus - (OH)Power plant (Hydroelectric)32.5 km5 MW[7]
Suburban Landfill Gas Recovery · WM Renewable Energy LLCPower plant (Biomass)47.9 km6 MW[7]
Unnamed substationSubstation0.3 km138 kV[1]
Badger Substation · American Electric PowerSubstation0.3 km138 kV[1]
Horizon Substation · American Electric PowerSubstation0.33 km138 kV[1]
Smith's Mill Substation · Energy CooperativeSubstation0.75 km138 kV[1]
Jug Street Substation · AEP OhioSubstation0.78 km345 kV[1]
Unnamed substationSubstation2.08 km138 kV[1]
Largest queued generation in this countyFuelQueue statusMWSource
Centerburg 138 kVPJM AI2-088SolarIn study · proposed 2025-12413 MW[5]
Centerburg 138 kVPJM AG1-034SolarIn study · proposed 2023-10363 MW[5]
Centerburg 138 kVPJM AH1-036StorageIn study · proposed 2024-07278 MW[5]
Centerburg 138 kVPJM AG1-024SolarIn study · proposed 2023-10235 MW[5]
Flint GridPJM AF1-062StorageIA signed · proposed 2026-11200 MW[5]
Jug Street 138 kVPJM AI2-226StorageIn study · proposed 2022-08200 MW[5]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    Dec 21, 2023[2]
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year
  • $170.6M[2]
    Market value · tax year current (2026) · parcel 095-111618-04.000
  • $21.3M[2]
    Market value — land · tax year current (2026) · parcel 095-111618-04.000
  • $149.3M[2]
    Market value — improvements · tax year current (2026) · parcel 095-111618-04.000
Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

ParcelRecord ownerAcresZoning / useBuilding sq ftSource
095-111618-04.000
Licking County, OH
AMAZON DATA SERVICES INC
PO BOX 80416 , SEATTLE, WA
106.41305: Research/Chemical Labs—[2]
Site area
106.4 acres[2]Confirmed

Sum of county land area across parcels.

Land use
305: Research/Chemical Labs[2]Confirmed
Annual property tax
Not yet sourced
Nearby comparable transactions

Size

Building footprint
213,800 sq ft[1]Likelyderived

Computed from the mapped OSM building outline.

Parcel / land records
095-111618-04.000 (Licking County)[2]Confirmed
Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

  1. Dec 21, 2023[2]

    Deed/transfer recorded for parcel 095-111618-04.000 (no sale price disclosed).

Other buildings on this campus

13

All claims (provenance audit)

21
FieldValueSourceConfidenceAs ofStatus
NameAmazon Web Servicesway/1386016627 name=Amazon Web Services[1] Likely2026-09-27Shown
StatusOperating[1] derivedUnverified2026-09-27Shown
Facility typeHyperscale[1] derivedUnverified2026-09-27Shown
Property owner of recordAmazon Web ServicesParcel 095-111618-04.000: AMAZON DATA SERVICES INC[2] Confirmed2026-09-27Shown
OperatorAmazon Web Servicesoperator=Amazon Web Services[1] Likely2026-09-27Shown
UtilityAmerican Electric Powerterritory 14006: OHIO POWER CO (INVESTOR OWNED, AMERICAN ELECTRIC POWER CO)[3] derivedUnverified2022Shown
ISO / RTOPJMPJM INTERCONNECTION, LLC[4] derivedLikely—Shown
Balancing authorityPJM[3] derivedLikely—Shown
Nearest mapped substationUnnamed substation (138 kV)way/1428178581[1] derivedLikely2026-09-28Shown
Distance to substation0.3 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby345 kV[1] derivedLikely2026-09-28Shown
Generation queued in county2.52 GW[5] derivedConfirmed2026-09-27Shown
State avg. industrial price10.95¢/kWh[6] Confirmed2026-07Shown
State avg. commercial price14.06¢/kWh[6] Confirmed2026-07Shown
Generation within 50 km21 MW[7] derivedConfirmed202502Shown
Building footprint213,800 sq ft[1] derivedLikely2026-09-27Shown
Site area106.4 acres[2] Confirmed2026-09-27Shown
Parcel / land records095-111618-04.000 (Licking County)[2] Confirmed2026-09-27Shown
Assessed value (official)$170.6M[2] Confirmed2026Shown
Land use305: Research/Chemical Labs[2] Confirmed2026-09-27Shown
Land acquiredDec 21, 2023[2] derivedConfirmed2026-09-27Shown