AWS New Albany

Operating + expandingAI campusCampusLicking County, Ohio
70% profile completeness
52 claims from 13 sources
Current facility power
255 MW[1]
Likelyestimated
Planned capacity
405 MW[1]
Likelyestimated
Floor area
Not yet sourced
Buildings (planned)
14[1]
Likelyderived
Capital cost / investment
$8.1B[1]
Likelyestimated
First operational
Dec 1, 2024[1]
Likelyderived

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Remaining capacity: H1 2027 – H2 2028
Medium confidencewindow, not a prediction
Project verification
Verified operating
Operation documented by satellite imagery and government record.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
American Electric Power · PJM
Substation: On-site substation (likely Horizon Substation)

Power reality

Announced
405 MW[1]
Research estimate of planned capacity (no company figure found)
Interconnection request
No record
Contracted / approved
No record
Under construction
150 MW[1]
Buildings 10–14 under construction (satellite-tracked phases)
Operational
255 MW[1]
Estimated from buildings observed operational
  • ⚠ No public interconnection record for this load — PJM does not publish large-load requests.
  • ⚠ No permit record linked to this site yet.
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.
How the time-to-power window was estimated
Evidence used
  • Current stage: Operational (furthest stage with documented evidence)[1][2]
  • Stated date: Next projected milestone: 2027-07-01 (modeled/speculative)[1]
  • Required: 405 MW
Assumptions
  • From “Under construction”, large loads have typically taken 0.5–2 more years to first power (editorial range; see Methodology).
  • The window is a range of plausible outcomes under these assumptions, not a forecast. It moves as new filings, queue updates or imagery arrive.
Window: H1 2027 – H2 2028

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredFeb 13, 2025
    Government record
    • Feb 13, 2025 · Land acquisition / deed recorded[2]
    • Feb 13, 2025 · Deed/transfer recorded for parcel 095-111648-00.000 (no sale price disclosed).[2]
    • Apr 9, 2025 · Deed/transfer recorded for parcel 095-111756-00.024 (no sale price disclosed).[2]
    • Mar 9, 2026 · Deed/transfer recorded for parcel 095-111408-00.000 (no sale price disclosed).[2]
    • Sep 27, 2026 · Owner of record in county parcel data[2]
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionJul 1, 2022
    Model estimate · Satellite imagery
    • Jul 1, 2022 · Reported status: under construction[1]
    • Jul 1, 2022 · Construction start[1]
    • Jul 1, 2022 · Land clearing begins for Buildings 5-9 (eastern campus).[1]
    • Dec 1, 2024 · Reported status: expanding[1]
  3. EnergizationDec 1, 2024
    Satellite imagery
    • Dec 1, 2024 · Buildings 5-9 (eastern campus) operational. [New Albany’s Dec. 2024 report](https://newalbanyohio.org/wp-content/uploads/2025/01/CD-2024-12.pdf) lists AWS partial occupancy for 5 b[1]
    • Mar 12, 2026 · Middle campus Buildings 10, 12, 13, and 14 appear complete/likely operational. Building 11 is still installing backup generators, so it is not counted as operational. Based on sate[1]
  4. OperationalDec 1, 2024
    Satellite imagery · Government record
    • Dec 1, 2024 · Buildings 5-9 (eastern campus) operational. [New Albany’s Dec. 2024 report](https://newalbanyohio.org/wp-content/uploads/2025/01/CD-2024-12.pdf) lists AWS partial occupancy for 5 b[1]
    • Mar 12, 2026 · Middle campus Buildings 10, 12, 13, and 14 appear complete/likely operational. Building 11 is still installing backup generators, so it is not counted as operational. Based on sate[1]
    • Sep 27, 2026 · County land use: 342: Light Manufacturing - 21-30% Office[2]
    • Sep 27, 2026 · County land use: 305: Research/Chemical Labs[2]
    • Sep 27, 2026 · County land use: 300: Industrial Vacant Land[2]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Government record, Model estimate, Satellite imagery.

Grid path

  1. facility
    AWS New Albany
  2. substation
    On-site substation (likely Horizon Substation)[1][6]
    Satellite imageryLikely
    4 substation outlines traced inside the campus on satellite imagery; OSM maps Horizon Substation 0.35 km away
  3. transmission
    Conesville - Corridor 345kV transmission line[6]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.37 km away). Not confirmed as the supply path.
  4. utility
    American Electric Power[3]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    PJM[5]
    Service territoryLikely
    Balancing authority: PJM
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

Mapped outline
Coordinates
40.10491, -82.74348
Address
13360 Miller Rd NW[1]Likely
County
Licking County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
  2. 2. Owner / developer
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply
Utility:

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Property owner of record
Utility

Most likely retail provider among 3 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Ohio Edison CO, Licking Rural Electric INC.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
255 MW[1]Likelyestimated

Estimated total facility power (IT plus cooling and overhead) at the latest observed milestone.

Current IT capacity
213 MW[1]Likelyestimated

Estimated IT load currently online, based on buildings observed operational.

Planned capacity
405 MW[1]Likelyestimated

Projected facility power at the last tracked milestone (2027-07-01); not necessarily full build-out.

Estimated annual consumption
1,564 GWh/yr[4]Speculativeestimated

255 MW × 8,760 h × 70% utilization.

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
PJM[5]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
PJM[3]Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Horizon Substation (138 kV)[6]Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.4 km[6]Likelyderived
Highest-voltage line nearby
345 kV[6]Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
10.95¢/kWh[8]Confirmed

Ohio statewide average, July 2026.

State avg. commercial price
14.06¢/kWh[8]Confirmed

Ohio statewide average, July 2026.

Generation within 50 km
21 MW[9]Confirmedderived

8 EIA-reported plants within 50 km.

Generation queued in county
2.52 GW[7]Confirmedderived

14 active generation interconnection requests in Licking County: Solar 1,773 MW, Storage 750 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
Conesville - Corridor 345kV transmission line · American Electric PowerTransmission line0.37 km345 kV[6]
138 kV lineTransmission line0.38 km138 kV[6]
Jug Street - Corridor · American Electric PowerTransmission line0.45 km345 kV[6]
Jug Street - Corridor 345kV transmission line · American Electric PowerTransmission line0.52 km345 kV[6]
345 kV line · American Electric PowerTransmission line1.05 km345 kV[6]
Jug Street - Kirk 345kV transmission line · American Electric PowerTransmission line1.12 km345 kV[6]
Denison Solar Array · AEP Onsite Partners, LLCPower plant (Solar)19.5 km2 MW[9]
Dodge Park Engine No 1 · City of Columbus - (OH)Power plant (Petroleum)28.6 km2 MW[9]
St-1/1a Engine No 1 · City of Columbus - (OH)Power plant (Petroleum)28.9 km1 MW[9]
3100 Valleyview Drive · Madison Energy Investments LLCPower plant (Solar)29.4 km1 MW[9]
Renick Run Pumping Station 03-04 · City of Columbus - (OH)Power plant (Petroleum)30.1 km2 MW[9]
Ps St-8 Engine No 1 · City of Columbus - (OH)Power plant (Petroleum)30.5 km2 MW[9]
O'Shaughnessy Hydro · City of Columbus - (OH)Power plant (Hydroelectric)33 km5 MW[9]
Suburban Landfill Gas Recovery · WM Renewable Energy LLCPower plant (Biomass)47.5 km6 MW[9]
Horizon Substation · American Electric PowerSubstation0.35 km138 kV[6]
Badger Substation · American Electric PowerSubstation0.8 km138 kV[6]
Unnamed substationSubstation0.86 km138 kV[6]
Jug Street Substation · AEP OhioSubstation1.11 km345 kV[6]
Smith's Mill Substation · Energy CooperativeSubstation1.16 km138 kV[6]
Unnamed substationSubstation1.75 km138 kV[6]
Largest queued generation in this countyFuelQueue statusMWSource
Centerburg 138 kVPJM AI2-088SolarIn study · proposed 2025-12413 MW[7]
Centerburg 138 kVPJM AG1-034SolarIn study · proposed 2023-10363 MW[7]
Centerburg 138 kVPJM AH1-036StorageIn study · proposed 2024-07278 MW[7]
Centerburg 138 kVPJM AG1-024SolarIn study · proposed 2023-10235 MW[7]
Flint GridPJM AF1-062StorageIA signed · proposed 2026-11200 MW[7]
Jug Street 138 kVPJM AI2-226StorageIn study · proposed 2022-08200 MW[7]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    Feb 13, 2025[2]
  3. Permitting
    —
  4. Construction start
    Jul 1, 2022[1]
  5. First operational
    Dec 1, 2024[1]
  6. Expected completion
    Jul 1, 2027[1]
    Projected
Planned capacity
405 MW[1]Likelyestimated

Projected facility power at the last tracked milestone (2027-07-01); not necessarily full build-out.

Buildings (planned)
14[1]Likelyderived

Count of building outlines traced on satellite imagery.

Buildings operational
9[1]Likelyestimated
PhaseStatusAdded MWCompleted / expectedSource
Buildings 1–5operational136 MWDec 1, 2024[1]
Buildings 6–9operational119 MWMar 12, 2026[1]
Buildings 10–14under construction150 MWJul 1, 2027 (projected)[1]

Real estate

Official assessments
Assessor's value for a tax year
  • $17.5M[2]
    Market value · tax year current (2026) · parcel 095-111756-00.024
  • $3.2M[2]
    Market value — land · tax year current (2026) · parcel 095-111756-00.024
  • $14.3M[2]
    Market value — improvements · tax year current (2026) · parcel 095-111756-00.024
  • $20.4M[2]
    Market value · tax year current (2026) · parcel 095-111648-00.000
  • $20.4M[2]
    Market value — land · tax year current (2026) · parcel 095-111648-00.000
  • $65.7M[2]
    Market value · tax year current (2026) · parcel 095-111408-00.000
Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

ParcelRecord ownerAcresZoning / useBuilding sq ftSource
095-111756-00.024
Licking County, OH
CIVF VII - OH1M01 LLC
1 BEACON ST STE 2800 , BOSTON, MA
15.87342: Light Manufacturing - 21-30% Office—[2]
095-111648-00.000
Licking County, OH
AMAZON DATA SERVICES INC
PO BOX 80416 , SEATTLE, WA
67.68305: Research/Chemical Labs—[2]
095-111408-00.000
Licking County, OH
AMAZON DATA SERVICES INC
PO BOX 80416 , SEATTLE, WA
199.81300: Industrial Vacant Land—[2]
Site area
283.4 acres[2]Confirmed

Sum of county land area across parcels.

Land use
342: Light Manufacturing - 21-30% Office[2]Confirmed
Capital cost / investment
$8.1B[1]Likelyestimated

Modeled total capital cost (2025 USD) of capacity currently operational, incl. compute hardware.

Annual property tax
Not yet sourced
Nearby comparable transactions

Size

Parcel / land records
095-111756-00.024 (Licking County),095-111648-00.000 (Licking County),095-111408-00.000 (Licking County)[2]Confirmed
Floor area
Not yet sourced

Compute

Chip types
Trainium2, H100, H200, B200[1]Confirmed
Compute (H100-equivalents)
201,100[1]Likelyestimated

What changed (last 3 years)

Follow this facility (RSS)
  • Current IT capacity
    113 MWDec 1, 2024[1]→213 MWMar 12, 2026[1]
  • Current facility power
    136 MWDec 1, 2024[1]→255 MWMar 12, 2026[1]
  • Buildings operational
    0Jul 1, 2022[1]→5Dec 1, 2024[1]→9Mar 12, 2026[1]
  • Status
    Under constructionJul 1, 2022[1]→Operating + expandingDec 1, 2024[1]
  • Assessed value (official)
    $105.4M2026[2]→$103.7M2026[2]

Timeline

Construction start: Jul 1, 2022[1]
First operational: Dec 1, 2024[1]
  1. Jul 1, 2022[1]

    Land clearing begins for Buildings 5-9 (eastern campus).

  2. Dec 1, 2024136 MW facility power· 5 buildings operational[1]

    Buildings 5-9 (eastern campus) operational. New Albany’s Dec. 2024 report lists AWS partial occupancy for 5 buildings at the eastern campus. Note that we're only including roughly 44% of all the New Albany campuses IT Power as being dedicated to leading AI chips, based on all the types of compute instances listed. The full IT power is much higher than 113 MW.

  3. Mar 12, 2026255 MW facility power· 9 buildings operational[1]

    Middle campus Buildings 10, 12, 13, and 14 appear complete/likely operational. Building 11 is still installing backup generators, so it is not counted as operational. Based on satellite imagery, northern campus Buildings 1-3 appear in late construction, with all roofs complete but nearby generator/cooling equipment still being installed for buildings 2-3. Building 4 is still early in construction. Eastern campus Buildings 5-9 appear complete and operational as expected. Note that we're only including roughly 44% of all the New Albany campuses IT Power as being dedicated to leading AI chips, based on all the types of compute instances listed.

  4. May 18, 2026255 MW facility power· 9 buildings operational[1]

    Satellite imagery shows Building 1 in the northern campus still appears structurally finished, with no visible change from the prior two months, but we're still not counting it operational due to visible construction work around the perimeter. Buildings 2-3 still have nearby generators/cooling equipment being installed, and Building 4 is only roughly 80% roofed. Eastern campus Buildings 5-9 remain operational. Middle campus Buildings 10, 12, 13, and 14 remain operational; Building 11 is still installing backup generators and is not counted.

  5. Jul 1, 2027Projected405 MW facility power· 14 buildings operational[1]

    Expected operational date for the remaining tracked buildings (11, and 1-4) across the three campuses. This estimate is based on the previous buildings taking roughly 1.5 years from steel framing to complete operational status. Note that we're only including roughly 44% of all the New Albany campuses IT Power as being dedicated to leading AI chips, based on all the types of compute instances listed.

  6. Apr 9, 2025[2]

    Deed/transfer recorded for parcel 095-111756-00.024 (no sale price disclosed).

  7. Feb 13, 2025[2]

    Deed/transfer recorded for parcel 095-111648-00.000 (no sale price disclosed).

  8. Mar 9, 2026[2]

    Deed/transfer recorded for parcel 095-111408-00.000 (no sale price disclosed).

Buildings on this campus

13

All claims (provenance audit)

52
FieldValueSourceConfidenceAs ofStatus
NameAWS New Albany[1] Likely2026-05-18Shown
StatusUnder construction[1] derivedLikely2022-07-01Superseded / alternative
StatusOperating + expanding[1] derivedLikely2024-12-01Superseded / alternative
StatusOperating + expanding[1] derivedLikely2026-03-12Superseded / alternative
StatusOperating + expanding[1] derivedLikely2026-05-18Shown
Facility typeAI campus[1] derivedLikely2026-05-18Shown
Address13360 Miller Rd NW[1] Likely2026-05-18Shown
Property owner of recordCivf Vii - Oh1m01 LLCParcel 095-111756-00.024: CIVF VII - OH1M01 LLC[2] Confirmed2026-09-27Shown
Property owner of recordAmazon Web ServicesParcel 095-111648-00.000: AMAZON DATA SERVICES INC[2] Confirmed2026-09-27Shown
Property owner of recordAmazon Web ServicesParcel 095-111408-00.000: AMAZON DATA SERVICES INC[2] Confirmed2026-09-27Shown
OwnerAmazon Web ServicesOwner: Amazon[1] Confirmed2026-05-18Shown
UtilityAmerican Electric Powerterritory 14006: OHIO POWER CO (INVESTOR OWNED, AMERICAN ELECTRIC POWER CO)[3] derivedUnverified2022Shown
Current facility power255 MW[1] estimatedLikely2026-05-18Shown
Current facility power136 MW[1] estimatedLikely2024-12-01Superseded / alternative
Current facility power255 MW[1] estimatedLikely2026-03-12Superseded / alternative
Current IT capacity213 MW[1] estimatedLikely2026-05-18Shown
Current IT capacity113 MW[1] estimatedLikely2024-12-01Superseded / alternative
Current IT capacity213 MW[1] estimatedLikely2026-03-12Superseded / alternative
Planned capacity405 MW[1] estimatedLikely2026-05-18Shown
Estimated annual consumption1,564 GWh/yr[4] estimatedSpeculative2026-09-29Shown
ISO / RTOPJMPJM INTERCONNECTION, LLC[5] derivedLikely—Shown
Balancing authorityPJM[3] derivedLikely—Shown
Nearest mapped substationHorizon Substation (138 kV)way/1428181256[6] derivedLikely2026-09-28Shown
Distance to substation0.4 km[6] derivedLikely2026-09-28Shown
Highest-voltage line nearby345 kV[6] derivedLikely2026-09-28Shown
Generation queued in county2.52 GW[7] derivedConfirmed2026-09-27Shown
State avg. industrial price10.95¢/kWh[8] Confirmed2026-07Shown
State avg. commercial price14.06¢/kWh[8] Confirmed2026-07Shown
Generation within 50 km21 MW[9] derivedConfirmed202502Shown
Buildings (planned)14[1] derivedLikely2026-05-18Shown
Buildings operational9[1] estimatedLikely2026-05-18Shown
Buildings operational0[1] estimatedLikely2022-07-01Superseded / alternative
Buildings operational5[1] estimatedLikely2024-12-01Superseded / alternative
Buildings operational9[1] estimatedLikely2026-03-12Superseded / alternative
Site area283.4 acres[2] Confirmed2026-09-27Shown
Capital cost / investment$8.1B[1] estimatedLikely2026-05-18Shown
Parcel / land records095-111756-00.024 (Licking County)[2] Confirmed2026-09-27Shown
Parcel / land records095-111648-00.000 (Licking County)[2] Confirmed2026-09-27Shown
Parcel / land records095-111408-00.000 (Licking County)[2] Confirmed2026-09-27Shown
Assessed value (official)$103.7M[2] Confirmed2026Shown
Land use342: Light Manufacturing - 21-30% Office[2] Confirmed2026-09-27Shown
Land use305: Research/Chemical Labs[2] Confirmed2026-09-27Superseded / alternative
Land use300: Industrial Vacant Land[2] Confirmed2026-09-27Superseded / alternative
Compute (H100-equivalents)201,100[1] estimatedLikely2026-05-18Shown
Chip typesTrainium2[1] Confirmed2026-05-18Shown
Chip typesH100[1] Confirmed2026-05-18Shown
Chip typesH200[1] Confirmed2026-05-18Shown
Chip typesB200[1] Confirmed2026-05-18Shown
Land acquiredFeb 13, 2025[2] derivedConfirmed2026-09-27Shown
Construction startJul 1, 2022[1] derivedLikely2026-05-18Shown
First operationalDec 1, 2024[1] derivedLikely2026-05-18Shown
Expected completionJul 1, 2027[1] estimatedSpeculative2026-05-18Shown