POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Government record, Community map.
Grid path
- →facilityAmazon Web Services
- →substationUnnamed substation (138 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.21 km away. Proximity does not establish that it serves the site.
- →transmissionJug Street - Corridor 345kV transmission line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.25 km away). Not confirmed as the supply path.
- →utilityAmerican Electric Power[3]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 40.10170, -82.75190
- County
- Licking County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of record
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Property owner of record
- Operator
- Utility
Most likely retail provider among 3 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Ohio Edison CO, Licking Rural Electric INC.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Ohio statewide average, July 2026.
- State avg. commercial price
Ohio statewide average, July 2026.
- Generation within 50 km
8 EIA-reported plants within 50 km.
- Generation queued in county
14 active generation interconnection requests in Licking County: Solar 1,773 MW, Storage 750 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 138 kV line | Transmission line | 0.21 km | 138 kV | [1] |
| Jug Street - Corridor 345kV transmission line · American Electric Power | Transmission line | 0.25 km | 345 kV | [1] |
| Jug Street - Corridor · American Electric Power | Transmission line | 0.28 km | 345 kV | [1] |
| 345 kV line · American Electric Power | Transmission line | 0.66 km | 345 kV | [1] |
| Jug Street - Kirk 345kV transmission line · American Electric Power | Transmission line | 0.68 km | 345 kV | [1] |
| Conesville - Corridor 345kV transmission line · American Electric Power | Transmission line | 1.16 km | 345 kV | [1] |
| Denison Solar Array · AEP Onsite Partners, LLC | Power plant (Solar) | 20.1 km | 2 MW | [7] |
| Dodge Park Engine No 1 · City of Columbus - (OH) | Power plant (Petroleum) | 27.8 km | 2 MW | [7] |
| St-1/1a Engine No 1 · City of Columbus - (OH) | Power plant (Petroleum) | 28.1 km | 1 MW | [7] |
| 3100 Valleyview Drive · Madison Energy Investments LLC | Power plant (Solar) | 28.6 km | 1 MW | [7] |
| Renick Run Pumping Station 03-04 · City of Columbus - (OH) | Power plant (Petroleum) | 29.3 km | 2 MW | [7] |
| Ps St-8 Engine No 1 · City of Columbus - (OH) | Power plant (Petroleum) | 29.7 km | 2 MW | [7] |
| O'Shaughnessy Hydro · City of Columbus - (OH) | Power plant (Hydroelectric) | 32.4 km | 5 MW | [7] |
| Suburban Landfill Gas Recovery · WM Renewable Energy LLC | Power plant (Biomass) | 48 km | 6 MW | [7] |
| Unnamed substation | Substation | 0.21 km | 138 kV | [1] |
| Badger Substation · American Electric Power | Substation | 0.27 km | 138 kV | [1] |
| Horizon Substation · American Electric Power | Substation | 0.49 km | 138 kV | [1] |
| Smith's Mill Substation · Energy Cooperative | Substation | 0.69 km | 138 kV | [1] |
| Jug Street Substation · AEP Ohio | Substation | 0.75 km | 345 kV | [1] |
| Unnamed substation | Substation | 2.19 km | 138 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Centerburg 138 kVPJM AI2-088 | Solar | In study · proposed 2025-12 | 413 MW | [5] |
| Centerburg 138 kVPJM AG1-034 | Solar | In study · proposed 2023-10 | 363 MW | [5] |
| Centerburg 138 kVPJM AH1-036 | Storage | In study · proposed 2024-07 | 278 MW | [5] |
| Centerburg 138 kVPJM AG1-024 | Solar | In study · proposed 2023-10 | 235 MW | [5] |
| Flint GridPJM AF1-062 | Storage | IA signed · proposed 2026-11 | 200 MW | [5] |
| Jug Street 138 kVPJM AI2-226 | Storage | In study · proposed 2022-08 | 200 MW | [5] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquiredDec 21, 2023[2]
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
| Parcel | Record owner | Acres | Zoning / use | Building sq ft | Source |
|---|---|---|---|---|---|
| 095-111618-04.000 Licking County, OH | AMAZON DATA SERVICES INC PO BOX 80416 , SEATTLE, WA | 106.41 | 305: Research/Chemical Labs | — | [2] |
- Site area
Sum of county land area across parcels.
- Land use
- Annual property tax
- Not yet sourced
- Amazon Web Services CMH50 · 0.8 km · parcel 095-111744-00.000$12.8M · Jul 23, 2015 [2]
- NAO 1/NAO 2 · 3.7 km · parcel 094-107100-00.001$36.4M · Aug 10, 2017 [2]
- LCO 1 · 4.5 km · parcel 094-106782-00.000$34.3M · May 23, 2019 [2]
Size
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
- Dec 21, 2023[2]
Deed/transfer recorded for parcel 095-111618-04.000 (no sale price disclosed).
Other buildings on this campus
13- AWS New AlbanyOperating + expanding
- Amazon Web Services CMH50Operating · 161,900 sq ft footprint
- Amazon Web Services CMH53Operating · 154,200 sq ft footprint
- Amazon Web Services CMH56Operating · 154,900 sq ft footprint
- Amazon Web Services CMH59Operating · 161,300 sq ft footprint
- Amazon Web Services CMH62Operating · 136,500 sq ft footprint
- Amazon Web ServicesOperating · 214,600 sq ft footprint
- Amazon Web ServicesOperating · 214,500 sq ft footprint
- Amazon Web ServicesOperating · 14,200 sq ft footprint
- Amazon Web ServicesOperating · 213,800 sq ft footprint
- Amazon Web ServicesOperating · 213,400 sq ft footprint
- Amazon Web ServicesOperating · 72,500 sq ft footprint
- Amazon Web ServicesOperating · 211,700 sq ft footprint
All claims (provenance audit)
21| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Amazon Web Servicesway/1386016628 name=Amazon Web Services | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Facility type | Hyperscale | [1] derived | Unverified | 2026-09-27 | Shown |
| Property owner of record | Amazon Web ServicesParcel 095-111618-04.000: AMAZON DATA SERVICES INC | [2] | Confirmed | 2026-09-27 | Shown |
| Operator | Amazon Web Servicesoperator=Amazon Web Services | [1] | Likely | 2026-09-27 | Shown |
| Utility | American Electric Powerterritory 14006: OHIO POWER CO (INVESTOR OWNED, AMERICAN ELECTRIC POWER CO) | [3] derived | Unverified | 2022 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [4] derived | Likely | — | Shown |
| Balancing authority | PJM | [3] derived | Likely | — | Shown |
| Nearest mapped substation | Unnamed substation (138 kV)way/1428178581 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.2 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 345 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 2.52 GW | [5] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 10.95¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 14.06¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 21 MW | [7] derived | Confirmed | 202502 | Shown |
| Building footprint | 125,800 sq ft | [1] derived | Likely | 2026-09-27 | Shown |
| Site area | 106.4 acres | [2] | Confirmed | 2026-09-27 | Shown |
| Parcel / land records | 095-111618-04.000 (Licking County) | [2] | Confirmed | 2026-09-27 | Shown |
| Assessed value (official) | $170.6M | [2] | Confirmed | 2026 | Shown |
| Land use | 305: Research/Chemical Labs | [2] | Confirmed | 2026-09-27 | Shown |
| Land acquired | Dec 21, 2023 | [2] derived | Confirmed | 2026-09-27 | Shown |