POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Northern Wasco County Pud · None (non-RTO region)
Substation: Bonneville Power Administration substation (115 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalSep 27, 2026
    Community map
    • Sep 27, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    Google Data Center The Dalles Oregon
  2. substation
    Bonneville Power Administration substation (115 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.18 km away. Proximity does not establish that it serves the site.
  3. transmission
    230 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.25 km away). Not confirmed as the supply path.
  4. utility
    Northern Wasco County Pud[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    None (non-RTO region)[3]
    Service territoryLikely
    Balancing authority: BPAT
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

Mapped outline
Coordinates
45.63243, -121.20133
County
Wasco County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
    Google[1]Likely
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Operator
Google[1]Likely
Utility

Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Bonneville Power Administration.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
None (non-RTO region)[3]Likelyderived

Outside all ISO/RTO footprints; balancing authority shown separately.

Balancing authority
BPAT[2]Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Bonneville Power Administration substation (115 kV)[1]Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.2 km[1]Likelyderived
Highest-voltage line nearby
230 kV[1]Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
8.92¢/kWh[4]Confirmed

Oregon statewide average, July 2026.

State avg. commercial price
10.60¢/kWh[4]Confirmed

Oregon statewide average, July 2026.

Generation within 50 km
5.35 GW[5]Confirmedderived

15 EIA-reported plants within 50 km.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
Discovery-Chenoweth No 1 · Bonneville Power AdministrationTransmission line0.21 km115 kV[1]
The Dalles-Discovery No 1 · Bonneville Power AdministrationTransmission line0.21 km115 kV[1]
230 kV lineTransmission line0.25 km230 kV[1]
115 kV lineTransmission line0.3 km115 kV[1]
Big Eddy-Quenett Creek No 2 · Bonneville Power AdministrationTransmission line0.43 km230 kV[1]
Big Eddy-Quenett Creek No 1 · Bonneville Power AdministrationTransmission line0.44 km230 kV[1]
The Dalles · USACE Northwestern DivisionPower plant (Hydroelectric)5.6 km1.82 GW[5]
Windy Flats Wind Project · Windy Flats Partners LLCPower plant (Wind)30.4 km262 MW[5]
Goldendale Generating Station · Puget Sound Energy IncPower plant (Natural Gas)34.8 km264 MW[5]
Golden Hill Wind · Avangrid Power LLCPower plant (Wind)39.1 km201 MW[5]
John Day · USACE Northwestern DivisionPower plant (Hydroelectric)40.5 km2.05 GW[5]
Tuolumne Wind Project · Turlock Irrigation DistrictPower plant (Wind)41.1 km136 MW[5]
Biglow Canyon Wind Farm · Portland General Electric CoPower plant (Wind)46.5 km450 MW[5]
Klondike Windpower II · Avangrid Power LLCPower plant (Wind)47.8 km81 MW[5]
Bonneville Power Administration substation · Bonneville Power AdministrationSubstation0.18 km115 kV[1]
Unnamed substationSubstation0.3 km115 kV[1]
Chenoweth Substation · Bonneville Power AdministrationSubstation0.41 km230 kV[1]
Unnamed substationSubstation0.52 km230 kV[1]
Unnamed substationSubstation0.57 km230 kV[1]
Unnamed substationSubstation0.79 km230 kV[1]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Site area
34.1 acres[1]Likelyderived

Area of the mapped OSM site outline.

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

Other buildings on this campus

3

All claims (provenance audit)

15
FieldValueSourceConfidenceAs ofStatus
NameGoogle Data Center The Dalles Oregonway/231769626 name=Google Data Center The Dalles Oregon[1] Likely2026-09-27Shown
StatusOperating[1] derivedUnverified2026-09-27Shown
Facility typeHyperscale[1] derivedUnverified2026-09-27Shown
Websitehttps://www.google.com/about/datacenters/locations/the-dalles/[1] Likely2026-09-27Shown
OperatorGoogleoperator=Google[1] Likely2026-09-27Shown
UtilityNorthern Wasco County Pudterritory 13788: NORTHERN WASCO COUNTY PUD (POLITICAL SUBDIVISION, NORTHERN WASC[2] derivedUnverified2022Shown
ISO / RTONone (non-RTO region)[3] derivedLikely—Shown
Balancing authorityBPAT[2] derivedLikely—Shown
Nearest mapped substationBonneville Power Administration substation (115 kV)way/171542397[1] derivedLikely2026-09-28Shown
Distance to substation0.2 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby230 kV[1] derivedLikely2026-09-28Shown
State avg. industrial price8.92¢/kWh[4] Confirmed2026-07Shown
State avg. commercial price10.60¢/kWh[4] Confirmed2026-07Shown
Generation within 50 km5.35 GW[5] derivedConfirmed202502Shown
Site area34.1 acres[1] derivedLikely2026-09-27Shown