Google Kansas City East
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- EnergizationAug 1, 2026
Satellite imagery
- Aug 1, 2026 · Building 1 operational. Estimated based on present construction progress and typical timelines.[1]
- OperationalAug 1, 2026
Satellite imagery
- Aug 1, 2026 · Building 1 operational. Estimated based on present construction progress and typical timelines.[1]
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Model estimate, Satellite imagery.
Grid path
- →facilityGoogle Kansas City East
- →substationOn-site substation[1]Satellite imageryLikely2 substation outlines traced inside the campus on satellite imagery
- →transmissionHawthorn - Nashua (345 kV)[5]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.47 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 39.17447, -94.46190
- County
- Clay County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developer
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
Estimated total facility power (IT plus cooling and overhead) at the latest observed milestone.
- Current IT capacity
Estimated IT load currently online, based on buildings observed operational.
- Estimated annual consumption
126 MW × 8,760 h × 70% utilization.
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Missouri statewide average, July 2026.
- State avg. commercial price
Missouri statewide average, July 2026.
- Generation within 50 km
17 EIA-reported plants within 50 km.
- Generation queued in county
6 active generation interconnection requests in Clay County: Storage 870 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Hawthorn - Nashua · Evergy | Transmission line | 0.47 km | 345 kV | [5] |
| Hawthorn · Evergy Metro | Power plant (Coal) | 5.1 km | 955 MW | [8] |
| Northeast (Mo) · Evergy Metro | Power plant (Petroleum) | 10.3 km | 396 MW | [8] |
| Quindaro · City of Kansas City - (KS) | Power plant (Natural Gas) | 15.4 km | 251 MW | [8] |
| Kaw · City of Kansas City - (KS) | Power plant (Natural Gas) | 19 km | 140 MW | [8] |
| Nearman Creek · City of Kansas City - (KS) | Power plant (Coal) | 20.3 km | 315 MW | [8] |
| Greenwood (Mo) · Evergy Missouri West | Power plant (Natural Gas) | 37.6 km | 253 MW | [8] |
| Dogwood Energy Facility · Dogwood Power Management, LLC | Power plant (Natural Gas) | 44.6 km | 657 MW | [8] |
| Ralph Green · Evergy Missouri West | Power plant (Natural Gas) | 45.9 km | 69 MW | [8] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| GEN-2024-370 at Smithville 161 kV SubstationSPP GEN-2024-370 | Storage | In study · proposed 2028-03 | 250 MW | [6] |
| GEN-2022-142 at Shoal Creek 161 kV SubstationSPP GEN-2022-142 | Storage | In study · proposed 2030-12 | 210 MW | [6] |
| GEN-2023-033 at Liberty South 161 kV SubstationSPP GEN-2023-033 | Storage | IA signed · proposed 2029-12 | 200 MW | [6] |
| GEN-2024-090 at Smithville 161 kV SubstationSPP GEN-2024-090 | Storage | In study · proposed 2028-03 | 100 MW | [6] |
| GEN-2022-102 at Liberty West 161 kVSPP GEN-2022-102 | Storage | IA signed · proposed 2027-01 | 100 MW | [6] |
| AFS NJG-2026-001 at Shoal Creek 161kV substationSPP AFS NJG-2026-001 | Storage | In study | 10 MW | [6] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
Real estate
None sourced yet
None sourced yet
None sourced yet
- Capital cost / investment
Modeled total capital cost (2025 USD) of capacity currently operational, incl. compute hardware.
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Floor area
- Not yet sourced
Compute
- Compute (H100-equivalents)
What changed (last 3 years)
Follow this facility (RSS)Timeline
- Jan 1, 2024[1]
Land clearing has begun for the site
- Mar 1, 2024[1]
Foundation work begins on Building 1
- Oct 1, 2024[1]
Foundation work begins on Building 2. Building 1 roof is fully black.
- Jul 1, 2025[1]
Foundation work begins for Building 3. Building 1 generators seem complete.
- Nov 1, 2025[1]
Foundation work begins for Building 4. Building 2 roof is almost complete, and construction appears to have started on cooling. Building 1 cooling construction continues, and the substation right next to it seems finished as well.
- Apr 16, 2026[1]
Building 1 is almost complete, with only cooling needing 4 more fans. Building 2 backup generator construction has begun, and cooling tower installation is about halfway complete. Building 3's roof is almost complete, and construction has started on generators and cooling. A clear foundation has been cleared for Building 4, though no construction has begun.
Building 1 operational. Estimated based on present construction progress and typical timelines.
All claims (provenance audit)
33| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Google Kansas City East | [1] | Likely | 2026-08-01 | Shown |
| Status | Under construction | [1] derived | Likely | 2024-01-01 | Superseded / alternative |
| Status | Under construction | [1] derived | Likely | 2024-03-01 | Superseded / alternative |
| Status | Under construction | [1] derived | Likely | 2024-10-01 | Superseded / alternative |
| Status | Under construction | [1] derived | Likely | 2025-07-01 | Superseded / alternative |
| Status | Under construction | [1] derived | Likely | 2025-11-01 | Superseded / alternative |
| Status | Under construction | [1] derived | Likely | 2026-04-16 | Superseded / alternative |
| Status | Operating | [1] derived | Likely | 2026-08-01 | Shown |
| Facility type | AI campus | [1] derived | Likely | 2026-08-01 | Shown |
| Owner | GoogleOwner: Google | [1] | Confirmed | 2026-08-01 | Shown |
| Utility | Evergy Missouri Westterritory 12698: EVERGY MISSOURI WEST (INVESTOR OWNED, GREAT PLAINS ENERGY) | [2] derived | Likely | 2022 | Shown |
| Current facility power | 126 MW | [1] estimated | Likely | 2026-08-01 | Shown |
| Current IT capacity | 105 MW | [1] estimated | Likely | 2026-08-01 | Shown |
| Estimated annual consumption | 773 GWh/yr | [3] estimated | Speculative | 2026-09-29 | Shown |
| ISO / RTO | SPPSOUTHWEST POWER POOL | [4] derived | Likely | — | Shown |
| Balancing authority | SWPP | [2] derived | Likely | — | Shown |
| Highest-voltage line nearby | 345 kV | [5] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 870 MW | [6] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 9.87¢/kWh | [7] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 12.64¢/kWh | [7] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 3.17 GW | [8] derived | Confirmed | 202502 | Shown |
| Buildings (planned) | 1 | [1] derived | Likely | 2026-08-01 | Shown |
| Buildings operational | 1 | [1] estimated | Likely | 2026-08-01 | Shown |
| Buildings operational | 0 | [1] estimated | Likely | 2024-01-01 | Superseded / alternative |
| Buildings operational | 0 | [1] estimated | Likely | 2024-03-01 | Superseded / alternative |
| Buildings operational | 0 | [1] estimated | Likely | 2024-10-01 | Superseded / alternative |
| Buildings operational | 0 | [1] estimated | Likely | 2025-07-01 | Superseded / alternative |
| Buildings operational | 0 | [1] estimated | Likely | 2025-11-01 | Superseded / alternative |
| Buildings operational | 0 | [1] estimated | Likely | 2026-04-16 | Superseded / alternative |
| Capital cost / investment | $4B | [1] estimated | Likely | 2026-08-01 | Shown |
| Compute (H100-equivalents) | 202,600 | [1] estimated | Likely | 2026-08-01 | Shown |
| Construction start | Jan 1, 2024 | [1] derived | Likely | 2026-08-01 | Shown |
| First operational | Aug 1, 2026 | [1] derived | Likely | 2026-08-01 | Shown |