DC
/

Google

OperatingEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.HyperscaleBuildingPottawattamie County, Iowa

Google is an operating hyperscale in Iowa. Operated or owned by Google. Power capacity has not been disclosed or collected yet. Verification: unverified. 4 cited sources.

Part of Google Council Bluffs (East)

20% profile completeness
12 claims from 4 sources
Last verified against sources: Oct 12, 2026
Newest dated evidence: Oct 12, 2026
Follow

Get changes to Google

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “Google.” /facilities/google-pottawattamie-county-ia-18. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_google_pottawattamie_county_ia_18_2026,
  title = {{Google}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/facilities/google-pottawattamie-county-ia-18}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Building footprint
51,000 sq ft[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Not identified
Substation: Unnamed substation (345 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalOct 12, 2026
    Community map
    • Oct 12, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    Google
  2. substation
    Unnamed substation (345 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.11 km away. Proximity does not establish that it serves the site.
  3. transmission
    345 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.09 km away). Not confirmed as the supply path.
  4. utility
    Not identified
    UnknownUnverified
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

LOCAL IMPACT

Water · generation · incentives · regulation · rates

Water & cooling

Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source

On-site generation & air permits

Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source

Incentives

Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source

Regulatory events

Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source

Utility & rates

Not yet collected: we haven't found a source for a large-load tariff or commission docket for the serving utility. Know one? Add a source

Location & imagery

Mapped outline
Coordinates
41.17105, -95.79247
County
Pottawattamie County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
    Google[1]Likely
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply
Not identified

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Operator
Google[1]Likely

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

Nearest mapped substation
Unnamed substation (345 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.1 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage line nearby
345 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
9.99¢/kWh[3]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Iowa statewide average, July 2026.

State avg. commercial price
13.27¢/kWh[3]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Iowa statewide average, July 2026.

Generation within 50 km
2.94 GW[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived

11 EIA-reported plants within 50 km.

Generation queued in county
200 MW[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived

1 active generation interconnection requests in Pottawattamie County: Wind 200 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
345 kV lineTransmission line0.09 km345 kV[1]
161 kV line · MidAmerican EnergyTransmission line0.4 km161 kV[1]
69 kV line · MidAmerican EnergyTransmission line0.42 km69 kV[1]
Walter Scott Jr Energy Center · MidAmerican Energy CoPower plant (Coal)4.2 km1.51 GW[4]
Jones Street · Omaha Public Power DistrictPower plant (Petroleum)14.1 km124 MW[4]
Sarpy County · Omaha Public Power DistrictPower plant (Natural Gas)14.9 km316 MW[4]
North Omaha · Omaha Public Power DistrictPower plant (Coal)21.7 km564 MW[4]
Cass County · Omaha Public Power DistrictPower plant (Natural Gas)28.7 km324 MW[4]
Fort Calhoun Community Solar · DG Southwest Solar Portfolio 2019, LLCPower plant (Solar)36.4 km5 MW[4]
Elk City Station · Omaha Public Power DistrictPower plant (Biomass)45.3 km6 MW[4]
Platteview Solar LLC · AES Distributed EnergyPower plant (Solar)49.2 km81 MW[4]
Unnamed substationSubstation0.11 km345 kV[1]
Unnamed substationSubstation0.49 km345 kV[1]
Unnamed substationSubstation0.57 km345 kV[1]
Southland Substation · MidAmerican EnergySubstation0.57 km345 kV[1]
MidAmerican Energy substation · MidAmerican EnergySubstation0.79 km345 kV[1]
Bunge Substation · MidAmerican EnergySubstation1.93 km161 kV[1]
Largest queued generation in this countyFuelQueue statusMWSource
J2990 at Overland - J1859 POI 345kV Line TapMISO J2990WindIn study · proposed 2025-06200 MW[2]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Building footprint
51,000 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived

Computed from the mapped OSM building outline.

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

Other buildings on this campus

18
  • Google Council Bluffs (East)Operating
  • GoogleOperating · 76,100 sq ft footprint
  • GoogleOperating · 319,200 sq ft footprint
  • GoogleOperating · 258,500 sq ft footprint
  • GoogleOperating · 211,700 sq ft footprint
  • GoogleOperating · 131,600 sq ft footprint
  • GoogleOperating · 129,900 sq ft footprint
  • GoogleOperating · 132,200 sq ft footprint
  • GoogleOperating · 132,400 sq ft footprint
  • GoogleOperating · 130,900 sq ft footprint
  • GoogleOperating · 129,700 sq ft footprint
  • GoogleOperating · 134,600 sq ft footprint
  • GoogleOperating · 174,400 sq ft footprint
  • GoogleOperating · 174,700 sq ft footprint
  • GoogleOperating · 158,400 sq ft footprint
  • GoogleOperating · 295,000 sq ft footprint
  • GoogleOperating · 297,100 sq ft footprint
  • GoogleOperating · 297,100 sq ft footprint

All claims (provenance audit)

12
FieldValueSourceConfidenceAs ofStatus
NameGoogleway/1565614266 name=Google[1] Likely2026-10-12Shown
StatusOperating[1] derivedUnverified2026-10-12Shown
Facility typeHyperscale[1] derivedUnverified2026-10-12Shown
OperatorGoogleoperator=Google[1] Likely2026-10-12Shown
Nearest mapped substationUnnamed substation (345 kV)way/1424697367[1] derivedLikely2026-09-28Shown
Distance to substation0.1 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby345 kV[1] derivedLikely2026-09-28Shown
Generation queued in county200 MW[2] derivedConfirmed2026-10-12Shown
State avg. industrial price9.99¢/kWh[3] Confirmed2026-07Shown
State avg. commercial price13.27¢/kWh[3] Confirmed2026-07Shown
Generation within 50 km2.94 GW[4] derivedConfirmed202502Shown
Building footprint51,000 sq ft[1] derivedLikely2026-10-12Shown