Google is an operating hyperscale in Iowa. Operated or owned by Google. Power capacity has not been disclosed or collected yet. Verification: unverified. 4 cited sources.
Part of Google Council Bluffs (East)
Follow
Get changes to Google
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “Google.” /facilities/google-pottawattamie-county-ia-18. Data as of 2026-10-12. Accessed 2026-10-12.
@misc{datacentersource_google_pottawattamie_county_ia_18_2026,
title = {{Google}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/google-pottawattamie-county-ia-18}},
note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityGoogle
- →substationUnnamed substation (345 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.11 km away. Proximity does not establish that it serves the site.
- →transmission345 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.09 km away). Not confirmed as the supply path.
- utilityNot identifiedUnknownUnverified
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling
Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source
On-site generation & air permits
Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events
Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source
Utility & rates
Not yet collected: we haven't found a source for a large-load tariff or commission docket for the serving utility. Know one? Add a source
Location & imagery
Mapped outline- Coordinates
- 41.17105, -95.79247
- County
- Pottawattamie County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- Nearest mapped substation
- Unnamed substation (345 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- 0.1 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
- Highest-voltage line nearby
- 345 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
- 9.99¢/kWh[3]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Iowa statewide average, July 2026.
- State avg. commercial price
- 13.27¢/kWh[3]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed
Iowa statewide average, July 2026.
- Generation within 50 km
- 2.94 GW[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
11 EIA-reported plants within 50 km.
- Generation queued in county
- 200 MW[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived
1 active generation interconnection requests in Pottawattamie County: Wind 200 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 345 kV line | Transmission line | 0.09 km | 345 kV | [1] |
| 161 kV line · MidAmerican Energy | Transmission line | 0.4 km | 161 kV | [1] |
| 69 kV line · MidAmerican Energy | Transmission line | 0.42 km | 69 kV | [1] |
| Walter Scott Jr Energy Center · MidAmerican Energy Co | Power plant (Coal) | 4.2 km | 1.51 GW | [4] |
| Jones Street · Omaha Public Power District | Power plant (Petroleum) | 14.1 km | 124 MW | [4] |
| Sarpy County · Omaha Public Power District | Power plant (Natural Gas) | 14.9 km | 316 MW | [4] |
| North Omaha · Omaha Public Power District | Power plant (Coal) | 21.7 km | 564 MW | [4] |
| Cass County · Omaha Public Power District | Power plant (Natural Gas) | 28.7 km | 324 MW | [4] |
| Fort Calhoun Community Solar · DG Southwest Solar Portfolio 2019, LLC | Power plant (Solar) | 36.4 km | 5 MW | [4] |
| Elk City Station · Omaha Public Power District | Power plant (Biomass) | 45.3 km | 6 MW | [4] |
| Platteview Solar LLC · AES Distributed Energy | Power plant (Solar) | 49.2 km | 81 MW | [4] |
| Unnamed substation | Substation | 0.11 km | 345 kV | [1] |
| Unnamed substation | Substation | 0.49 km | 345 kV | [1] |
| Unnamed substation | Substation | 0.57 km | 345 kV | [1] |
| Southland Substation · MidAmerican Energy | Substation | 0.57 km | 345 kV | [1] |
| MidAmerican Energy substation · MidAmerican Energy | Substation | 0.79 km | 345 kV | [1] |
| Bunge Substation · MidAmerican Energy | Substation | 1.93 km | 161 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| J2990 at Overland - J1859 POI 345kV Line TapMISO J2990 | Wind | In study · proposed 2025-06 | 200 MW | [2] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
- 51,000 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
Other buildings on this campus
18- Google Council Bluffs (East)Operating
- GoogleOperating · 76,100 sq ft footprint
- GoogleOperating · 319,200 sq ft footprint
- GoogleOperating · 258,500 sq ft footprint
- GoogleOperating · 211,700 sq ft footprint
- GoogleOperating · 131,600 sq ft footprint
- GoogleOperating · 129,900 sq ft footprint
- GoogleOperating · 132,200 sq ft footprint
- GoogleOperating · 132,400 sq ft footprint
- GoogleOperating · 130,900 sq ft footprint
- GoogleOperating · 129,700 sq ft footprint
- GoogleOperating · 134,600 sq ft footprint
- GoogleOperating · 174,400 sq ft footprint
- GoogleOperating · 174,700 sq ft footprint
- GoogleOperating · 158,400 sq ft footprint
- GoogleOperating · 295,000 sq ft footprint
- GoogleOperating · 297,100 sq ft footprint
- GoogleOperating · 297,100 sq ft footprint
All claims (provenance audit)
12| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Googleway/1565614266 name=Google | [1] | Likely | 2026-10-12 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-10-12 | Shown |
| Facility type | Hyperscale | [1] derived | Unverified | 2026-10-12 | Shown |
| Operator | Googleoperator=Google | [1] | Likely | 2026-10-12 | Shown |
| Nearest mapped substation | Unnamed substation (345 kV)way/1424697367 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.1 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 345 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 200 MW | [2] derived | Confirmed | 2026-10-12 | Shown |
| State avg. industrial price | 9.99¢/kWh | [3] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 13.27¢/kWh | [3] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 2.94 GW | [4] derived | Confirmed | 202502 | Shown |
| Building footprint | 51,000 sq ft | [1] derived | Likely | 2026-10-12 | Shown |