Data centers in Utah County, Utah
Datacenter Source tracks 8 data centers in Utah County, Utah. Facilities that disclose power add up to 179 MW online and 411 MW in the pipeline — floors, since 25% report a figure.
Follow
Get changes to Utah County, Utah
Or subscribe in a feed reader: RSS / Atom
Facilities
- QTS Eagle Mountain AI campus · Eagle MountainUnder construction+411 MW pipeline EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Meta Eagle Mountain AI campus · Eagle MountainOperating179 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Flexential Salt Lake City - Lindon Colocation · LindonOperating
- Meta HyperscaleOperating
- Meta HyperscaleOperating
- Meta HyperscaleOperating
- Meta HyperscaleOperating
- Meta HyperscaleOperating
Interconnection-queue requests filed here (last two years)
Requests to connect generation or large loads, as the ISO/RTO publishes them. Filing is an application, not a commitment to build.
No dated queue filings for this county in the files we ingest (some ISOs don't publish a county or filing date).
Local impact
Water, on-site generation and air permits, incentives, regulatory events and large-load tariffs, where a source documents them. Counts are of sourced records, not of the state's totals.
Air-cooled (chillers / dry coolers): 1 site EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
Not yet collected
Not yet collected for this state's utilities.
Not yet collected
Recent changes
- May 2, 2026 · Meta Eagle Mountain EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Status: Operating + expanding → Operating
- Dec 7, 2025 · Meta Eagle Mountain EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Buildings operational: 0 → 2
- Dec 7, 2025 · Meta Eagle Mountain EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Status: Under construction → Operating + expanding
- Dec 7, 2025 · Meta Eagle Mountain EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. New capacity online: Buildings 1 and 2 both estimated to be operational 90 days after testing was underway in September.
- Oct 1, 2023 · Meta Eagle Mountain EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Construction started: Land clearing begins.
- Oct 1, 2023 · QTS Eagle Mountain EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. Construction started: First signs of site preparation show up on satellite imagery.