POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityMicrosoft TRP3 (SAT46)
- →substationRafter Substation (138 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.41 km away. Proximity does not establish that it serves the site.
- →transmission138 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.29 km away). Not confirmed as the supply path.
- →utilityMedina Electric Coop, INC[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 29.41298, -98.80637
- County
- Medina County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Most likely retail provider among 4 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Karnes Electric Coop INC, Bandera Electric Coop, INC, AEP Texas Central Company.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Texas statewide average, July 2026.
- State avg. commercial price
Texas statewide average, July 2026.
- Generation within 50 km
19 EIA-reported plants within 50 km.
- Generation queued in county
7 active generation interconnection requests in Medina County: Storage 745 MW, Solar 211 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 138 kV line | Transmission line | 0.29 km | 138 kV | [1] |
| Leon Creek · City of San Antonio - (TX) | Power plant (Natural Gas) | 23.3 km | 184 MW | [6] |
| Oci Alamo Solar I Hybrid · OCI Energy LLC | Power plant (Solar) | 38.4 km | 41 MW | [6] |
| Blue Wing Solar Energy Generation · Duke Energy Renewables Services | Power plant (Solar) | 41.2 km | 14 MW | [6] |
| Arthur Von Rosenberg · City of San Antonio - (TX) | Power plant (Natural Gas) | 44.5 km | 518 MW | [6] |
| V H Braunig · City of San Antonio - (TX) | Power plant (Natural Gas) | 44.6 km | 1.05 GW | [6] |
| O W Sommers · City of San Antonio - (TX) | Power plant (Natural Gas) | 48.2 km | 830 MW | [6] |
| J K Spruce · City of San Antonio - (TX) | Power plant (Coal) | 48.5 km | 1.35 GW | [6] |
| Oci Alamo 4, LLC · Consolidated Edison Development Inc. | Power plant (Solar) | 49.7 km | 40 MW | [6] |
| Rafter Substation · CPS Energy | Substation | 0.41 km | 138 kV | [1] |
| CPS Energy substation · CPS Energy | Substation | 1.83 km | 138 kV | [1] |
| Texas Research Substation · CPS Energy | Substation | 1.99 km | 138 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Devine Mary BESSERCOT 28INR0392 · Devine Mary BESS | Storage | In study · proposed 2028-11 | 201 MW | [4] |
| Chacon CreekERCOT 27INR0206 · Cattlemen BESS LLC | Storage | In study · proposed 2027-10 | 189 MW | [4] |
| Ranger BESSERCOT 29INR0152 · Nova Clean Energy LLC | Storage | In study · proposed 2029-04 | 155 MW | [4] |
| Dunlay SolarERCOT 27INR0203 · Medina PV, LLC | Solar | In study · proposed 2030-12 | 151 MW | [4] |
| Hondo Arroyo StorageERCOT 27INR0437 · Hondo Creek Solar, LLC | Storage | In study · proposed 2028-07 | 101 MW | [4] |
| Adam Bryant BESSERCOT 25INR0610 · Adam Bryant BESS LLC | Storage | In study · proposed 2027-12 | 100 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
Other buildings on this campus
7- Microsoft SAT40Operating
- Microsoft Texas Research Park CampusOperating
- Microsoft TRP2Operating · 170,400 sq ft footprint
- Microsoft TRP1Operating · 178,100 sq ft footprint
- MicrosoftOperating · 229,700 sq ft footprint
- MicrosoftOperating · 229,700 sq ft footprint
- MicrosoftOperating · 152,100 sq ft footprint
All claims (provenance audit)
15| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Microsoft TRP3 (SAT46)way/1010260675 name=Microsoft TRP3 (SAT46) | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Facility type | Hyperscale | [1] derived | Unverified | 2026-09-27 | Shown |
| Operator | Microsoftoperator=Microsoft | [1] | Likely | 2026-09-27 | Shown |
| Utility | Medina Electric Coop, INCterritory 12268: MEDINA ELECTRIC COOP, INC (COOPERATIVE, MEDINA ELECTRIC COOP, I | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | ERCOTELECTRIC RELIABILITY COUNCIL OF TEXAS, INC. | [3] derived | Likely | — | Shown |
| Balancing authority | ERCO | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Rafter Substation (138 kV)way/639176169 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.4 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 138 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 956 MW | [4] derived | Confirmed | 2026-09-01 | Shown |
| State avg. industrial price | 7.07¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 8.47¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 4.1 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 229,700 sq ft | [1] derived | Likely | 2026-09-27 | Shown |