Unnamed data center
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Government record, Community map.
Grid path
- →facilityUnnamed data center
- →substationHoward Substation (69 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.57 km away. Proximity does not establish that it serves the site.
- →transmissionKyrene - Browning 500KV[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (1.17 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 33.34713, -111.62572
- County
- Maricopa County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of record
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Property owner of record
- Utility
Most likely retail provider among 11 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Wapa-- Western Area Power Administration, Electrical Dist No8 Maricopa, Usbia-San Carlos Project, Gila River Indian Utility Authority (Gricua), Maricopa County M W C Dist #1, Buckeye Water C&D District, ….
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Outside all ISO/RTO footprints; balancing authority shown separately.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Arizona statewide average, July 2026.
- State avg. commercial price
Arizona statewide average, July 2026.
- Generation within 50 km
29 EIA-reported plants within 50 km.
- Generation queued in county
5 active generation interconnection requests in Maricopa County: Solar + storage 1,100 MW, Solar 20 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 69 kV line | Transmission line | 0.54 km | 69 kV | [1] |
| 34.5 kV line | Transmission line | 0.64 km | 34.5 kV | [1] |
| 230 kV line | Transmission line | 0.77 km | 230 kV | [1] |
| Kyrene - Browning 500KV · Arizona Public Service | Transmission line | 1.17 km | 500 kV | [1] |
| Santan · Salt River Project | Power plant (Natural Gas) | 11.7 km | 1.29 GW | [7] |
| Superstition Energy Storage · Superstition Energy Storage, LLC | Power plant (Batteries) | 19.1 km | 90 MW | [7] |
| Ocotillo · Arizona Public Service Co | Power plant (Natural Gas) | 27.9 km | 605 MW | [7] |
| Kyrene · Salt River Project | Power plant (Natural Gas) | 28.8 km | 525 MW | [7] |
| Horse Mesa · Salt River Project | Power plant (Pumped Storage) | 37.6 km | 151 MW | [7] |
| Sundance · Arizona Public Service Co | Power plant (Natural Gas) | 46.7 km | 410 MW | [7] |
| Brittlebush Solar · Randolph Solar Park LLC | Power plant (Solar) | 48.5 km | 200 MW | [7] |
| Coolidge Generation Station · Salt River Project | Power plant (Natural Gas) | 49.1 km | 521 MW | [7] |
| Howard Substation · Salt River Project | Substation | 0.57 km | 69 kV | [1] |
| Unnamed substation | Substation | 0.65 km | 69 kV | [1] |
| Prickly Pear Substation · Salt River Project | Substation | 0.82 km | 230 kV | [1] |
| Unnamed substation | Substation | 1.75 km | 69 kV | [1] |
| Unnamed substation | Substation | 1.78 km | 69 kV | [1] |
| Perales Substation · Salt River Project | Substation | 2.09 km | 69 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| HARQUAHALA FLATS 2CAISO 2027 | Solar + storage | In study · proposed 2028-04 | 400 MW | [5] |
| HARQUAHALA SUNRISECAISO 1678 | Solar + storage | In study · proposed 2030-04 | 300 MW | [5] |
| VULCANCAISO 1534 | Solar + storage | In study · proposed 2027-12 | 250 MW | [5] |
| HARQUAHALA SUNRISE 2CAISO 2029 | Solar + storage | In study · proposed 2026-09 | 150 MW | [5] |
| AGUA CALIENTE SOLAR 2CAISO 1222 | Solar | In study · proposed 2016-12 | 20 MW | [5] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquiredDec 6, 2022[2]
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
| Parcel | Record owner | Acres | Zoning / use | Building sq ft | Source |
|---|---|---|---|---|---|
| 304-31-002V Maricopa County, AZ | REDALE LLC 1 META WAY MENLO PARK CA USA 94025 | 199.48 | CONTACT LOCAL JURISDICTION · Property use code 2830 | — | [2] |
- Site area
Sum of county land area across parcels.
- Land use
- Annual property tax
- Not yet sourced
- Comarch · 1.4 km · parcel 304-04-918A$1.2M · Apr 1, 2020 [2]
- EdgeConneX PHX02 Data Center · 2.1 km · parcel 304-03-982$187M · Aug 1, 2022 [2]
- Alliance Technology · 10.2 km · parcel 140-69-027$499,000 · May 1, 2022 [2]
- The Chatfield Group · 12.4 km · parcel 140-66-892$1M · May 1, 2019 [2]
- Myndshift Technologies · 16.7 km · parcel 141-37-056D$1.9M · Feb 1, 2020 [2]
- All About Serving Process Server · 17.4 km · parcel 302-84-928$2.6M · Oct 1, 2021 [2]
Size
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
- Dec 6, 2022[2]
Deed recorded for parcel 304-31-002V (owner of record: Redale LLC).
All claims (provenance audit)
18| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Property owner of record | Redale LLCParcel 304-31-002V: REDALE LLC | [2] | Confirmed | 2026-09-27 | Shown |
| Utility | Salt River Projectterritory 16572: SALT RIVER PROJECT (POLITICAL SUBDIVISION, SALT RIVER PROJECT) | [3] derived | Unverified | 2022 | Shown |
| ISO / RTO | None (non-RTO region) | [4] derived | Likely | — | Shown |
| Balancing authority | SRP | [3] derived | Likely | — | Shown |
| Nearest mapped substation | Howard Substation (69 kV)way/1390793982 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.6 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 500 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 1.12 GW | [5] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 9.35¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 13.12¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 4.14 GW | [7] derived | Confirmed | 202502 | Shown |
| Building footprint | 338,400 sq ft | [1] derived | Likely | 2026-09-27 | Shown |
| Site area | 199.5 acres | [2] | Confirmed | 2026-09-27 | Shown |
| Parcel / land records | 304-31-002V (Maricopa County) | [2] | Confirmed | 2026-09-27 | Shown |
| Assessed value (official) | $630.7M | [2] | Confirmed | 2027 | Shown |
| Land use | Property use code 2830 | [2] | Confirmed | 2026-09-27 | Shown |
| Land acquired | Dec 6, 2022 | [2] derived | Confirmed | 2026-09-27 | Shown |