Data centers near Bell County, TX
Tracked data centers within 10, 25 or 50 miles of an address, ZIP code, city or county, with operators, tenants, power, the likely utility and recent changes, each linked to its sources. Addresses are geocoded on our server and are not stored or kept in the link.
2 tracked facilities within 10 miles. 2 disclose power, 198 MW online (a floor: most sites don't disclose). Statewide, 12% of Texas facilities have a power figure.
ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. filing, deed, permit or grid recordAnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. company or press claimEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. satellite, model or map inferenceHow levels are assignedDownload CSVJSONAPI docs
Loading map…
- Rowan Temple0.4 miUnknownUnclassified· Temple, Bell County, TX
- Operator
- Rowan Digital Infrastructure
- Tenants / users
- —
- Power online
- —
- Pipeline
- 300 MW planned ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.
- Likely utility
- Oncor Electric Delivery · ISO/RTO: ERCOT
- Meta Temple8.9 miOperating + expandingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.AI campus· Temple, Bell County, TX
- Operator
- Meta
- Tenants / users
- Meta
- Power online
- 198 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Pipeline
- 231 MW planned EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
- Likely utility
- Pedernales Electric Coop, INC · ISO/RTO: ERCOT
- Dec 9, 2025EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 0 → 2
- Dec 9, 2025EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Under construction → Operating + expanding
- Dec 9, 2025EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 1 and 2 are operational. Activity related to the air quality permit (namely, emergency diesel generators) was reported to have started as of 2025-12-09. This is our best estimate, but note that the planned co…