Data centers near Monroe County, NY

Tracked data centers within 10, 25 or 50 miles of an address, ZIP code, city or county, with operators, tenants, power, the likely utility and recent changes, each linked to its sources. Addresses are geocoded on our server and are not stored or kept in the link.

Radius:10 mi25 mi50 miLocation from the U.S. Census Gazetteer (centroid).

5 tracked facilities within 50 miles. 2 disclose power, 107 MW online (a floor: most sites don't disclose). Statewide, 3% of New York facilities have a power figure.

ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. filing, deed, permit or grid recordAnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. company or press claimEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. satellite, model or map inferenceHow levels are assignedDownload CSVJSONAPI docs
Loading map…
  1. OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Unclassified· Rush, Monroe County, NY
    Operator
    —
    Tenants / users
    —
    Power online
    —
    Pipeline
    —
    Likely utility
    — · ISO/RTO: NYISO
  2. WNY STAMP30.4 mi
    PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Unclassified· Genesee County, NY
    Operator
    Genesee County Economic Devel.
    Tenants / users
    —
    Power online
    —
    Pipeline
    —
    Likely utility
    — · ISO/RTO: NYISO
  3. PlannedEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Unclassified· Genesee County, NY
    Operator
    GCEDC
    Tenants / users
    —
    Power online
    —
    Pipeline
    —
    Likely utility
    — · ISO/RTO: NYISO
  4. Operating + expandingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.AI campus· Barker, Niagara County, NY
    Operator
    Lake Mariner Data LLC
    Tenants / users
    Anthropic
    Power online
    49 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
    Pipeline
    441 MW planned EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
    Likely utility
    Niagara Mohawk Power Corp. · ISO/RTO: NYISO
    • May 31, 2026EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 0 → 1
    • May 31, 2026EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Under construction → Operating + expanding
    • May 31, 2026EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Building 1 is operational. On February 26, Terawulf stated that CB3 was expected to be energized by mid-May 2026. A drone video commissioned from RAAD shows several cooling units operating on May 8. It's therefore lik…
  5. OperatingEstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.AI campus· Barker, Niagara County, NY
    Operator
    Lake Mariner Data LLC
    Tenants / users
    G42
    Power online
    58 MW EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.
    Pipeline
    —
    Likely utility
    Niagara Mohawk Power Corp. · ISO/RTO: NYISO
    • Jul 23, 2026EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Operating + expanding → Operating
    • Mar 31, 2026EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current IT capacity: 16 MW → 58 MW
    • Mar 31, 2026EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current facility power: 19 MW → 58 MW