Capacity, status, permit, grid-request and construction changes over the last three years, each with its source. A change means the same source reported a new value later; two sources disagreeing is not a change. Follow a facility, company, utility, state or ISO by email, or subscribe to the feed in any RSS reader.

Each change is tagged by evidence: ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. filing, deed, permit or grid recordAnnouncedStated by the company or reported in the press; not yet backed by a filing or grid record. company or press claimEst.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. satellite, model or map inferenceHow levels are assigned

Clear
Changes per month by evidence level. Click a month to filter (showing 2026-11; click it again to clear).
2023-122026-11
This view:Download CSVJSONAPI docs
  1. Nov 9, 2026
    Equinix Ashburn DC18 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan LEGI-2025-0027: Active → Site plan EPLAN-2024-0193: Approved
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 183,900 sq ft → 162,000 sq ft
  2. Nov 9, 2026
    Proposed data center — Beaumeade · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan LEGI-2024-0047 : Active → Site plan EPLAN-2023-0083: Approved
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 96,800 sq ft → 113,000 sq ft
  3. Nov 9, 2026
    Proposed data center — EPLAN-2025-0195 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan LEGI-2023-0048: Approved → Site plan EPLAN-2025-0195: Active
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 67,800 sq ft → 751,900 sq ft
  4. Nov 9, 2026
    Proposed data center — Loudoun Tech Center · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan STPL-2023-0008: Approved: Conditionally → Site plan LEGI-2024-0058: Active
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 285,200 sq ft → 196,100 sq ft
  5. Nov 9, 2026
    Proposed data center — Prologis Exchange · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan EPLAN-2024-0036: Active → Site plan EPLAN-2025-0102: Active
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 697,500 sq ft → 16,000 sq ft
  6. Nov 9, 2026
    Proposed data center — Sdc Ashburn · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan LEGI-2025-0015: Active → Site plan STMP-2022-0020: Approved
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 20,000 sq ft → 621,500 sq ft
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Operating → Under construction
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Floor area: 531,600 sq ft → 1.06M sq ft
  7. Nov 2, 2026
    Digital Realty VA3 · VA
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Floor area: 482,000 sq ft → 383,500 sq ft
  8. Nov 2, 2026
    EdgeConneX CHI02 · IL
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Floor area: 128,800 sq ft → 130,600 sq ft
  9. Nov 2, 2026
    Equinix Ashburn DC18 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan LEGI-2025-0027: Active → Site plan EPLAN-2024-0193: Approved
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 183,900 sq ft → 162,000 sq ft
  10. Nov 2, 2026
    Equinix Chicago CH3 · IL
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Floor area: 543,600 sq ft → 666,800 sq ft
  11. Nov 2, 2026
    Proposed data center — Beaumeade · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan LEGI-2024-0047 : Active → Site plan EPLAN-2023-0083: Approved
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 96,800 sq ft → 113,000 sq ft
  12. Nov 2, 2026
    Proposed data center — EPLAN-2025-0195 · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan LEGI-2023-0048: Approved → Site plan EPLAN-2025-0195: Active
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 67,800 sq ft → 751,900 sq ft
  13. Nov 2, 2026
    Proposed data center — Loudoun Tech Center · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan STPL-2023-0008: Approved: Conditionally → Site plan LEGI-2024-0058: Active
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 285,200 sq ft → 196,100 sq ft
  14. Nov 2, 2026
    Proposed data center — Prologis Exchange · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan EPLAN-2024-0036: Active → Site plan EPLAN-2025-0102: Active
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 697,500 sq ft → 16,000 sq ft
  15. Nov 2, 2026
    Proposed data center — Sdc Ashburn · VA
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Permitting status: Site plan LEGI-2025-0015: Active → Site plan STMP-2022-0020: Approved
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Planned floor area: 20,000 sq ft → 621,500 sq ft
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Operating → Under construction
    • ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record.Floor area: 531,600 sq ft → 1.06M sq ft
  16. Nov 1, 2026
    OpenAI Stargate Abilene · TX
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current IT capacity: 618 MW → 824 MW
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Current facility power: 865 MW → 1.15 GW
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Compute (H100-equivalents): 509,300 → 1,018,700
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Capital cost / investment: $15.9B → $31.2B
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Buildings operational: 6 → 8
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Status: Operating + expanding → Operating
    • Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.New capacity online: Buildings 7-8 are estimated to be operational. On March 24, Building 8 roughly looked like where Building 3 was in September. Building 3 is estimated to be operational in April, 7 months later. This naively suggests B…
    Source: Epoch AI